S.Amdt. 342
What it does: 62 changes: changes 61 amounts, inserts textWhat it changes
62 changes to S.Con.Res. 23
Change 1: Increases the amount on page 9, line 2 by $3,330,000,000
Increases an amountPrinted page+$3,330,000,000to the amount printed on page 9, line 2
Original wording
On page 9, line 2, increase the amount by $3,330,000,000.
Change 2: Increases the amount on page 9, line 3 by $3,330,000,000
Increases an amountPrinted page+$3,330,000,000to the amount printed on page 9, line 3
Original wording
On page 9, line 3, increase the amount by $3,330,000,000.
Change 3: Increases the amount on page 9, line 6 by $3,428,000,000
Increases an amountPrinted page+$3,428,000,000to the amount printed on page 9, line 6
Original wording
On page 9, line 6, increase the amount by $3,428,000,000.
Change 4: Increases the amount on page 9, line 7 by $3,428,000,000
Increases an amountPrinted page+$3,428,000,000to the amount printed on page 9, line 7
Original wording
On page 9, line 7, increase the amount by $3,428,000,000.
Change 5: Increases the amount on page 9, line 10 by $3,630,000,000
Increases an amountPrinted page+$3,630,000,000to the amount printed on page 9, line 10
Original wording
On page 9, line 10, increase the amount by $3,630,000,000.
Change 6: Increases the amount on page 9, line 11 by $3,630,000,000
Increases an amountPrinted page+$3,630,000,000to the amount printed on page 9, line 11
Original wording
On page 9, line 11, increase the amount by $3,630,000,000.
Change 7: Increases the amount on page 9, line 14 by $3,889,000,000
Increases an amountPrinted page+$3,889,000,000to the amount printed on page 9, line 14
Original wording
On page 9, line 14, increase the amount by $3,889,000,000.
Change 8: Increases the amount on page 9, line 15 by $3,889,000,000
Increases an amountPrinted page+$3,889,000,000to the amount printed on page 9, line 15
Original wording
On page 9, line 15, increase the amount by $3,889,000,000.
Change 9: Increases the amount on page 9, line 18 by $4,096,000,000
Increases an amountPrinted page+$4,096,000,000to the amount printed on page 9, line 18
Original wording
On page 9, line 18, increase the amount by $4,096,000,000.
Change 10: Increases the amount on page 9, line 19 by $4,096,000,000
Increases an amountPrinted page+$4,096,000,000to the amount printed on page 9, line 19
Original wording
On page 9, line 19, increase the amount by $4,096,000,000.
Change 11: Increases the amount on page 9, line 22 by $4,316,000,000
Increases an amountPrinted page+$4,316,000,000to the amount printed on page 9, line 22
Original wording
On page 9, line 22, increase the amount by $4,316,000,000.
Change 12: Increases the amount on page 9, line 23 by $4,316,000,000
Increases an amountPrinted page+$4,316,000,000to the amount printed on page 9, line 23
Original wording
On page 9, line 23, increase the amount by $4,316,000,000.
Change 13: Increases the amount on page 10, line 2 by $4,516,000,000
Increases an amountPrinted page+$4,516,000,000to the amount printed on page 10, line 2
Original wording
On page 10, line 2, increase the amount by $4,516,000,000.
Change 14: Increases the amount on page 10, line 3 by $4,516,000,000
Increases an amountPrinted page+$4,516,000,000to the amount printed on page 10, line 3
Original wording
On page 10, line 3, increase the amount by $4,516,000,000.
Change 15: Increases the amount on page 10, line 6 by $4,728,000,000
Increases an amountPrinted page+$4,728,000,000to the amount printed on page 10, line 6
Original wording
On page 10, line 6, increase the amount by $4,728,000,000.
Change 16: Increases the amount on page 10, line 7 by $4,728,000,000
Increases an amountPrinted page+$4,728,000,000to the amount printed on page 10, line 7
Original wording
On page 10, line 7, increase the amount by $4,728,000,000.
Change 17: Increases the amount on page 10, line 10 by $4,952,000,000
Increases an amountPrinted page+$4,952,000,000to the amount printed on page 10, line 10
Original wording
On page 10, line 10, increase the amount by $4,952,000,000.
Change 18: Increases the amount on page 10, line 11 by $4,952,000,000
Increases an amountPrinted page+$4,952,000,000to the amount printed on page 10, line 11
Original wording
On page 10, line 11, increase the amount by $4,952,000,000.
Change 19: Increases the amount on page 10, line 14 by $5,227,000,000
Increases an amountPrinted page+$5,227,000,000to the amount printed on page 10, line 14
Original wording
On page 10, line 14, increase the amount by $5,227,000,000.
Change 20: Increases the amount on page 10, line 15 by $5,227,000,000
Increases an amountPrinted page+$5,227,000,000to the amount printed on page 10, line 15
Original wording
On page 10, line 15, increase the amount by $5,227,000,000.
Change 21: Inserts new text on page 79, line 22
InsertsPrinted pageInserted: SEC. . SENSE OF SENATE ON FULL CONCURRENT RECEIPT OF RETIRED PAY AND VETERANS' DISABILITY COMPENSATION.
Inserted: It is the sense of the Senate that the new budget authority and outlays for fiscal years 2004 through 2013 for National Defense (050) specified in section 103(1) are adequate to provide, and should provide, for full concurrent receipt of retired pay and veterans' disability compensation by members and former members of the uniformed services who are entitled to such pay and compensation, without regard to sections 5304 and 5305 of title 38, United States Code.
Original wording
On page 79, after line 22, insert the following:
Change 22: Increases the amount on page 4, line 15 by $3,330,000,000
Increases an amountPrinted page+$3,330,000,000to the amount printed on page 4, line 15
Original wording
On page 4, line 15, increase the amount by $3,330,000,000.
Change 23: Increases the amount on page 4, line 16 by $3,428,000,000
Increases an amountPrinted page+$3,428,000,000to the amount printed on page 4, line 16
Original wording
On page 4, line 16, increase the amount by $3,428,000,000.
Change 24: Increases the amount on page 4, line 17 by $3,630,000,000
Increases an amountPrinted page+$3,630,000,000to the amount printed on page 4, line 17
Original wording
On page 4, line 17, increase the amount by $3,630,000,000.
Change 25: Increases the amount on page 4, line 18 by $3,889,000,000
Increases an amountPrinted page+$3,889,000,000to the amount printed on page 4, line 18
Original wording
On page 4, line 18, increase the amount by $3,889,000,000.
Change 26: Increases the amount on page 4, line 19 by $4,096,000,000
Increases an amountPrinted page+$4,096,000,000to the amount printed on page 4, line 19
Original wording
On page 4, line 19, increase the amount by $4,096,000,000.
Change 27: Increases the amount on page 4, line 20 by $4,316,000,000
Increases an amountPrinted page+$4,316,000,000to the amount printed on page 4, line 20
Original wording
On page 4, line 20, increase the amount by $4,316,000,000.
Change 28: Increases the amount on page 4, line 21 by $4,516,000,000
Increases an amountPrinted page+$4,516,000,000to the amount printed on page 4, line 21
Original wording
On page 4, line 21, increase the amount by $4,516,000,000.
Change 29: Increases the amount on page 4, line 22 by $4,728,000,000
Increases an amountPrinted page+$4,728,000,000to the amount printed on page 4, line 22
Original wording
On page 4, line 22, increase the amount by $4,728,000,000.
Change 30: Increases the amount on page 4, line 23 by $4,952,000,000
Increases an amountPrinted page+$4,952,000,000to the amount printed on page 4, line 23
Original wording
On page 4, line 23, increase the amount by $4,952,000,000.
Change 31: Increases the amount on page 4, line 24 by $5,227,000,000
Increases an amountPrinted page+$5,227,000,000to the amount printed on page 4, line 24
Original wording
On page 4, line 24, increase the amount by $5,227,000,000.
Change 32: Increases the amount on page 5, line 5 by $3,330,000,000
Increases an amountPrinted page+$3,330,000,000to the amount printed on page 5, line 5
Original wording
On page 5, line 5, increase the amount by $3,330,000,000.
Change 33: Increases the amount on page 5, line 6 by $3,428,000,000
Increases an amountPrinted page+$3,428,000,000to the amount printed on page 5, line 6
Original wording
On page 5, line 6, increase the amount by $3,428,000,000.
Change 34: Increases the amount on page 5, line 7 by $3,630,000,000
Increases an amountPrinted page+$3,630,000,000to the amount printed on page 5, line 7
Original wording
On page 5, line 7, increase the amount by $3,630,000,000.
Change 35: Increases the amount on page 5, line 8 by $3,889,000,000
Increases an amountPrinted page+$3,889,000,000to the amount printed on page 5, line 8
Original wording
On page 5, line 8, increase the amount by $3,889,000,000.
Change 36: Increases the amount on page 5, line 9 by $4,096,000,000
Increases an amountPrinted page+$4,096,000,000to the amount printed on page 5, line 9
Original wording
On page 5, line 9, increase the amount by $4,096,000,000.
Change 37: Increases the amount on page 5, line 10 by $4,316,000,000
Increases an amountPrinted page+$4,316,000,000to the amount printed on page 5, line 10
Original wording
On page 5, line 10, increase the amount by $4,316,000,000.
Change 38: Increases the amount on page 5, line 11 by $4,516,000,000
Increases an amountPrinted page+$4,516,000,000to the amount printed on page 5, line 11
Original wording
On page 5, line 11, increase the amount by $4,516,000,000.
Change 39: Increases the amount on page 5, line 12 by $4,728,000,000
Increases an amountPrinted page+$4,728,000,000to the amount printed on page 5, line 12
Original wording
On page 5, line 12, increase the amount by $4,728,000,000.
Change 40: Increases the amount on page 5, line 13 by $4,952,000,000
Increases an amountPrinted page+$4,952,000,000to the amount printed on page 5, line 13
Original wording
On page 5, line 13, increase the amount by $4,952,000,000.
Change 41: Increases the amount on page 5, line 14 by $5,227,000,000
Increases an amountPrinted page+$5,227,000,000to the amount printed on page 5, line 14
Original wording
On page 5, line 14, increase the amount by $5,227,000,000.
Change 42: Decreases the amount on page 45, line 24 by $42,110,000,000
Decreases an amountPrinted page−$42,110,000,000to the amount printed on page 45, line 24
Original wording
On page 45, line 24, decrease the amount by $42,110,000,000.
Change 43: Increases the amount on page 3, line 10 by $3,330,000,000
Increases an amountPrinted page+$3,330,000,000to the amount printed on page 3, line 10
Original wording
On page 3, line 10, increase the amount by $3,330,000,000.
Change 44: Increases the amount on page 3, line 11 by $3,428,000,000
Increases an amountPrinted page+$3,428,000,000to the amount printed on page 3, line 11
Original wording
On page 3, line 11, increase the amount by $3,428,000,000.
Change 45: Increases the amount on page 3, line 12 by $3,630,000,000
Increases an amountPrinted page+$3,630,000,000to the amount printed on page 3, line 12
Original wording
On page 3, line 12, increase the amount by $3,630,000,000.
Change 46: Increases the amount on page 3, line 13 by $3,889,000,000
Increases an amountPrinted page+$3,889,000,000to the amount printed on page 3, line 13
Original wording
On page 3, line 13, increase the amount by $3,889,000,000.
Change 47: Increases the amount on page 3, line 14 by $4,096,000,000
Increases an amountPrinted page+$4,096,000,000to the amount printed on page 3, line 14
Original wording
On page 3, line 14, increase the amount by $4,096,000,000.
Change 48: Increases the amount on page 3, line 15 by $4,316,000,000
Increases an amountPrinted page+$4,316,000,000to the amount printed on page 3, line 15
Original wording
On page 3, line 15, increase the amount by $4,316,000,000.
Change 49: Increases the amount on page 3, line 16 by $4,516,000,000
Increases an amountPrinted page+$4,516,000,000to the amount printed on page 3, line 16
Original wording
On page 3, line 16, increase the amount by $4,516,000,000.
Change 50: Increases the amount on page 3, line 17 by $4,728,000,000
Increases an amountPrinted page+$4,728,000,000to the amount printed on page 3, line 17
Original wording
On page 3, line 17, increase the amount by $4,728,000,000.
Change 51: Increases the amount on page 3, line 18 by $4,952,000,000
Increases an amountPrinted page+$4,952,000,000to the amount printed on page 3, line 18
Original wording
On page 3, line 18, increase the amount by $4,952,000,000.
Change 52: Increases the amount on page 3, line 19 by $5,227,000,000
Increases an amountPrinted page+$5,227,000,000to the amount printed on page 3, line 19
Original wording
On page 3, line 19, increase the amount by $5,227,000,000.
Change 53: Increases the amount on page 4, line 1 by $3,330,000,000
Increases an amountPrinted page+$3,330,000,000to the amount printed on page 4, line 1
Original wording
On page 4, line 1, increase the amount by $3,330,000,000.
Change 54: Increases the amount on page 4, line 2 by $3,428,000,000
Increases an amountPrinted page+$3,428,000,000to the amount printed on page 4, line 2
Original wording
On page 4, line 2, increase the amount by $3,428,000,000.
Change 55: Increases the amount on page 4, line 3 by $3,630,000,000
Increases an amountPrinted page+$3,630,000,000to the amount printed on page 4, line 3
Original wording
On page 4, line 3, increase the amount by $3,630,000,000.
Change 56: Increases the amount on page 4, line 4 by $3,889,000,000
Increases an amountPrinted page+$3,889,000,000to the amount printed on page 4, line 4
Original wording
On page 4, line 4, increase the amount by $3,889,000,000.
Change 57: Increases the amount on page 4, line 5 by $4,096,000,000
Increases an amountPrinted page+$4,096,000,000to the amount printed on page 4, line 5
Original wording
On page 4, line 5, increase the amount by $4,096,000,000.
Change 58: Increases the amount on page 4, line 6 by $4,316,000,000
Increases an amountPrinted page+$4,316,000,000to the amount printed on page 4, line 6
Original wording
On page 4, line 6, increase the amount by $4,316,000,000.
Change 59: Increases the amount on page 4, line 7 by $4,516,000,000
Increases an amountPrinted page+$4,516,000,000to the amount printed on page 4, line 7
Original wording
On page 4, line 7, increase the amount by $4,516,000,000.
Change 60: Increases the amount on page 4, line 8 by $4,728,000,000
Increases an amountPrinted page+$4,728,000,000to the amount printed on page 4, line 8
Original wording
On page 4, line 8, increase the amount by $4,728,000,000.
Change 61: Increases the amount on page 4, line 9 by $4,952,000,000
Increases an amountPrinted page+$4,952,000,000to the amount printed on page 4, line 9
Original wording
On page 4, line 9, increase the amount by $4,952,000,000.
Change 62: Increases the amount on page 4, line 10 by $5,227,000,000
Increases an amountPrinted page+$5,227,000,000to the amount printed on page 4, line 10
Original wording
On page 4, line 10, increase the amount by $5,227,000,000.
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
SA 342. Mr. REID submitted an amendment intended to be proposed by him to the concurrent resolution S. Con. Res. 23, setting forth the congressional budget for the United States Government for fiscal year 2004 and including the appropriate budgetary levels for fiscal year 2003 and for fiscal years 2005 through 2013; which was ordered to lie on the table; as follows:
On page 9, line 2, increase the amount by $3,330,000,000.
On page 9, line 3, increase the amount by $3,330,000,000.
On page 9, line 6, increase the amount by $3,428,000,000.
On page 9, line 7, increase the amount by $3,428,000,000.
On page 9, line 10, increase the amount by $3,630,000,000.
On page 9, line 11, increase the amount by $3,630,000,000.
On page 9, line 14, increase the amount by $3,889,000,000.
On page 9, line 15, increase the amount by $3,889,000,000.
On page 9, line 18, increase the amount by $4,096,000,000.
On page 9, line 19, increase the amount by $4,096,000,000.
On page 9, line 22, increase the amount by $4,316,000,000.
On page 9, line 23, increase the amount by $4,316,000,000.
On page 10, line 2, increase the amount by $4,516,000,000.
On page 10, line 3, increase the amount by $4,516,000,000.
On page 10, line 6, increase the amount by $4,728,000,000.
On page 10, line 7, increase the amount by $4,728,000,000.
On page 10, line 10, increase the amount by $4,952,000,000.
On page 10, line 11, increase the amount by $4,952,000,000.
On page 10, line 14, increase the amount by $5,227,000,000.
On page 10, line 15, increase the amount by $5,227,000,000. On page 79, after line 22, insert the following:
SEC. . SENSE OF SENATE ON FULL CONCURRENT RECEIPT OF RETIRED PAY AND VETERANS' DISABILITY COMPENSATION.
It is the sense of the Senate that the new budget authority and outlays for fiscal years 2004 through 2013 for National Defense (050) specified in section 103(1) are adequate to provide, and should provide, for full concurrent receipt of retired pay and veterans' disability compensation by members and former members of the uniformed services who are entitled to such pay and compensation, without regard to sections 5304 and 5305 of title 38, United States Code.
On page 4, line 15, increase the amount by $3,330,000,000.
On page 4, line 16, increase the amount by $3,428,000,000.
On page 4, line 17, increase the amount by $3,630,000,000.
On page 4, line 18, increase the amount by $3,889,000,000.
On page 4, line 19, increase the amount by $4,096,000,000.
On page 4, line 20, increase the amount by $4,316,000,000.
On page 4, line 21, increase the amount by $4,516,000,000.
On page 4, line 22, increase the amount by $4,728,000,000.
On page 4, line 23, increase the amount by $4,952,000,000.
On page 4, line 24, increase the amount by $5,227,000,000.
On page 5, line 5, increase the amount by $3,330,000,000.
On page 5, line 6, increase the amount by $3,428,000,000.
On page 5, line 7, increase the amount by $3,630,000,000.
On page 5, line 8, increase the amount by $3,889,000,000.
On page 5, line 9, increase the amount by $4,096,000,000.
On page 5, line 10, increase the amount by $4,316,000,000.
On page 5, line 11, increase the amount by $4,516,000,000.
On page 5, line 12, increase the amount by $4,728,000,000.
On page 5, line 13, increase the amount by $4,952,000,000.
On page 5, line 14, increase the amount by $5,227,000,000.
On page 45, line 24, decrease the amount by $42,110,000,000.
On page 3, line 10, increase the amount by $3,330,000,000.
On page 3, line 11, increase the amount by $3,428,000,000.
On page 3, line 12, increase the amount by $3,630,000,000.
On page 3, line 13, increase the amount by $3,889,000,000.
On page 3, line 14, increase the amount by $4,096,000,000.
On page 3, line 15, increase the amount by $4,316,000,000.
On page 3, line 16, increase the amount by $4,516,000,000.
On page 3, line 17, increase the amount by $4,728,000,000.
On page 3, line 18, increase the amount by $4,952,000,000.
On page 3, line 19, increase the amount by $5,227,000,000.
On page 4, line 1, increase the amount by $3,330,000,000.
On page 4, line 2, increase the amount by $3,428,000,000.
On page 4, line 3, increase the amount by $3,630,000,000.
On page 4, line 4, increase the amount by $3,889,000,000.
On page 4, line 5, increase the amount by $4,096,000,000.
On page 4, line 6, increase the amount by $4,316,000,000.
On page 4, line 7, increase the amount by $4,516,000,000.
On page 4, line 8, increase the amount by $4,728,000,000.
On page 4, line 9, increase the amount by $4,952,000,000.
On page 4, line 10, increase the amount by $5,227,000,000.
Legislative Activity
Stay on top of the latest movement without scrolling through every action