S.Amdt. 553Senate109th Congress (2005-2007)2nd degree

S.Amdt. 553

What it does: Rewrites page 2, lines 1–11
Sponsored by Ron WydenSen. Ron Wyden (D-OR)
Submitted April 19, 2005

What it changes

1 change to S.Amdt. 376

Replaces text
  1. Rewrites page 2, lines 1–11

    Replaces

    Removes page 2, lines 1–11.

    Inserted: DEPARTMENT OF DEFENSE--CIVIL

    Inserted: OPERATIONS AND MAINTENANCE

    Inserted: (a) For an additional amount for the Secretary of the Army, acting through the Chief of Engineers, for emergency repair of the Fern Ridge Dam, Oregon, $31,000,000, to remain available until expended: Provided, That the amounts provided under this heading are designated as an emergency requirement pursuant to section 402 of the conference report to accompany S. Con. Res. 95 (108th Congress).

    Inserted: (b) For an additional amount for the Secretary of the Army, acting through the Chief of Engineers, for emergency work on the Los Angeles-Long Beach Harbor, Mojave River Dam, Port San Luis, and Santa Barbara Harbor, $7,500,000, to remain available until expended: Provided, That the amounts provided under this heading are designated as an emergency requirement pursuant to section 402 of the conference report to accompany S. Con. Res. 95 (108th Congress).

    Inserted: (c) For an additional amount for the Secretary of the Army, acting through the Chief of Engineers, for emergency construction at Lower Santa Ana River Reaches 1 and 2 of the Santa Ana River Project, Prado Dam of the Santa Ana River Project, San Timoteo of the Santa Ana River Project, Murrieta Creek, and Santa Paula Creek, $12,500,000, to remain available until expended: Provided, That the amounts provided under this heading are designated as an emergency requirement pursuant to section 402 of the conference report to accompany S. Con. Res. 95 (108th Congress).

    Inserted: (d) The project for navigation, Los Angeles Harbor, California, authorized by section 101(b)(5) of the Water Resources Development Act of 2000 (114 Stat. 2577) is modified to authorize the Secretary of the Army to carry out the project at a total cost of $222,000,000.

    Inserted: (e) The Secretary of the Army, acting through the Chief of Engineers, shall use any funds appropriated to the Secretary pursuant to this Act to repair, restore, and maintain projects and facilities of the Corps of Engineers, including by dredging navigation channels, cleaning area streams, providing emergency streambank protection, restoring such public infrastructure as the Secretary determines to be necessary (including sewer and water facilities), conducting studies of the impacts of floods, and providing such flood relief as the Secretary determines to be appropriate: Provided, That of those funds, $32,000,000 shall be used by the Secretary for the Upper Peninsula, Michigan.

    Original wording

    On page 2, strike lines 1 through 11 and insert the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 553. Mr. WYDEN submitted an amendment intended to be proposed to amendment SA 376 submitted by Mr. Wyden (for himself, Mr. Smith, and Mrs. Murray) and intended to be proposed to the bill H.R. 1268, making emergency supplemental appropriations for the fiscal year ending September 30, 2005, to establish and rapidly implement regulations for State driver's license and identification document security standards, to prevent terrorists from abusing the asylum laws of the United States, to unify terrorism-related grounds for inadmissibility and removal, to ensure expeditious construction of the San Diego border fence, and for other purposes; which was ordered to lie on the table; as follows:

On page 2, strike lines 1 through 11 and insert the following:

DEPARTMENT OF DEFENSE--CIVIL

OPERATIONS AND MAINTENANCE

(a) For an additional amount for the Secretary of the Army, acting through the Chief of Engineers, for emergency repair of the Fern Ridge Dam, Oregon, $31,000,000, to remain available until expended: Provided, That the amounts provided under this heading are designated as an emergency requirement pursuant to section 402 of the conference report to accompany S. Con. Res. 95 (108th Congress).

(b) For an additional amount for the Secretary of the Army, acting through the Chief of Engineers, for emergency work on the Los Angeles-Long Beach Harbor, Mojave River Dam, Port San Luis, and Santa Barbara Harbor, $7,500,000, to remain available until expended: Provided, That the amounts provided under this heading are designated as an emergency requirement pursuant to section 402 of the conference report to accompany S. Con. Res. 95 (108th Congress).

(c) For an additional amount for the Secretary of the Army, acting through the Chief of Engineers, for emergency construction at Lower Santa Ana River Reaches 1 and 2 of the Santa Ana River Project, Prado Dam of the Santa Ana River Project, San Timoteo of the Santa Ana River Project, Murrieta Creek, and Santa Paula Creek, $12,500,000, to remain available until expended: Provided, That the amounts provided under this heading are designated as an emergency requirement pursuant to section 402 of the conference report to accompany S. Con. Res. 95 (108th Congress).

(d) The project for navigation, Los Angeles Harbor, California, authorized by section 101(b)(5) of the Water Resources Development Act of 2000 (114 Stat. 2577) is modified to authorize the Secretary of the Army to carry out the project at a total cost of $222,000,000.

(e) The Secretary of the Army, acting through the Chief of Engineers, shall use any funds appropriated to the Secretary pursuant to this Act to repair, restore, and maintain projects and facilities of the Corps of Engineers, including by dredging navigation channels, cleaning area streams, providing emergency streambank protection, restoring such public infrastructure as the Secretary determines to be necessary (including sewer and water facilities), conducting studies of the impacts of floods, and providing such flood relief as the Secretary determines to be appropriate: Provided, That of those funds, $32,000,000 shall be used by the Secretary for the Upper Peninsula, Michigan.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

Floor Latest Action

Senate amendment submitted

April 19, 2005