S.Amdt. 3965
What it does: Adds Subtitle G--Condition for Effective Date of Certain Sections Relating to Designation of Certain National Heritage Areas SEC. 491 CERTIFICATION BY PRESIDENT on page 172, between lines 16 and 17What it changes
1 change to S. 2483
Adds Subtitle G--Condition for Effective Date of Certain Sections Relating to Designation of Certain National Heritage Areas SEC. 491 CERTIFICATION BY PRESIDENT on page 172, between lines 16 and 17
Adds a sectionPrinted pageInserted: Subtitle G--Condition for Effective Date of Certain Sections Relating to Designation of Certain National Heritage Areas SEC. 491 CERTIFICATION BY PRESIDENT.
Inserted: Each designation made by sections 403, 423, and 443 shall not take effect until the date on which the President certifies that--
Inserted: (1) the designation of each proposed National Heritage Area by this title will not cause an adverse impact on--
Inserted: (A) agricultural or livestock production within the proposed National Heritage Area;
Inserted: (B) energy exploration and production within the proposed National Heritage Area;
Inserted: (C) critical infrastructure located within the proposed National Heritage Area, including the placement and maintenance of--
Inserted: (i) electric transmission and distribution lines (including related infrastructure); and
Inserted: (ii) natural gas pipelines (including related infrastructure); and
Inserted: (D) the affordability of housing; and
Inserted: (2) with respect to each State in which there is located a proposed National Heritage Area that is designated by this title, the total deferred maintenance backlog of the State is an amount not greater than $50,000,000, as reported by the Director of the National Park Service to the Federal Accounting Standards Advisory Board.
Original wording
On page 172, between lines 16 and 17, insert the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
SA 3965. Mr. COBURN submitted an amendment intended to be proposed by him to the bill S. 2483, to authorize certain programs and activities in the Forest Service, the Department of the Interior, and the Department of Energy, and for other purposes; which was ordered to lie on the table; as follows:
On page 172, between lines 16 and 17, insert the following:
Subtitle G--Condition for Effective Date of Certain Sections Relating to Designation of Certain National Heritage Areas SEC. 491 CERTIFICATION BY PRESIDENT.
Each designation made by sections 403, 423, and 443 shall not take effect until the date on which the President certifies that--
(1) the designation of each proposed National Heritage Area by this title will not cause an adverse impact on--
(A) agricultural or livestock production within the proposed National Heritage Area;
(B) energy exploration and production within the proposed National Heritage Area;
(C) critical infrastructure located within the proposed National Heritage Area, including the placement and maintenance of--
(i) electric transmission and distribution lines (including related infrastructure); and
(ii) natural gas pipelines (including related infrastructure); and
(D) the affordability of housing; and
(2) with respect to each State in which there is located a proposed National Heritage Area that is designated by this title, the total deferred maintenance backlog of the State is an amount not greater than $50,000,000, as reported by the Director of the National Park Service to the Federal Accounting Standards Advisory Board.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment submitted
January 29, 2008