S.Amdt. 4553Senate110th Congress (2007-2009)2nd degree
S.Amdt. 4553
Sponsored by
Sen. Kay Bailey Hutchison (R-TX)
Submitted April 17, 2008
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
April 17, 2008
Text
Submitted
SA 4553. Mrs. HUTCHISON (for herself, Mr. Cornyn, Ms. Landrieu, Mr. Stevens, Mrs. Lincoln, Ms. Murkowski, Mr. Martinez, and Mr. Coleman) submitted an amendment intended to be proposed to amendment SA 4146 proposed by Mrs. Boxer to the bill H.R. 1195, to amend the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users to make technical corrections, and for other purposes; which was ordered to lie on the table; as follows: On page 39, lines 24 and 25, strike ``in Clifton''. On page 49, line 18, strike ``160'' and insert ``169''. On page 57, strike lines 8 through 11 and insert the following: (250) in item number 3909 by striking the project description and inserting ``S.R. 281, the Avalon Boulevard Expansion Project from Interstate 10 to U.S. Highway 90''; On page 78, strike lines 3 and 4 and insert the following: (386) in item number 273, by striking the project description and inserting ``Improvements to on/off ramp system from I-10 to Ryan Street (LA 385), including installation of an exit ramp for eastbound traffic on I-10, incorporating, as necessary, portions of Front Street and Ann Street, and including repair and realignment of Lakeshore Drive, and to include the expansion of Contraband Bayou Bridge''; (387) in item number 3735 by striking the project description and inserting ``Widening existing Highway 226, including a bypass of Cash and a new connection to Highway 49''; (388) in item number 2406 by striking ``in Fort Worth'' and inserting ``, or Construct SH 199 (Henderson St.) through the Trinity Uptown Project between the West Fork and Clear Fork of the Trinity River, in Fort Worth''; and (389) in item number 370 by striking the On page 107, line 4, strike ``and'' and all that follows through line 5, and insert the following: (B) by striking paragraph (10); and (C) in paragraph (15), by striking ``South Carolina Department of Transportation Light Rail study'' and inserting ``South Carolina Department of Transportation Corridor Study''. On page 114, line 21, strike ``; and'' and insert a semicolon. On page 114, strike line 22 and insert the following: (xxvi) in item number 422 by striking the project description and inserting ``People Mover Public Transportation System buses and bus facilities, Anchorage, Alaska''; (xxvii) in project number 67 by striking the project description and inserting ``Union Passenger Terminal Planning and Master Plan and Infrastructure Improvements in Orleans Parish, Louisiana''; and (xxviii) by adding at the end-- ______