H.Amdt. 926House112th Congress (2011-2013)

An amendment numbered 6 printed in House Report 112-385 to require the use of life-cycle cost analysis in the design or lease of federal buildings receiving at least 50% Federal funding and which construction cost is over $1,000,000 or the space to be leased is over 25,000 square feet.

What it does: Adds SEC. 22. CONSIDERATION OF LIFE-CYCLE COST REQUIRED at the end of the bill
Submitted February 6, 2012

Description

Amendment requires the use of life-cycle cost analysis in the design or lease of federal buildings receiving at least 50% Federal funding and for which construction cost is over $1 million or the space to be leased is over 25,000 square feet.

What it changes

1 change to H.R. 1734

Adds a section

We couldn't match these changes to the text of H.R. 1734, so they're shown as written.

  1. Adds SEC. 22. CONSIDERATION OF LIFE-CYCLE COST REQUIRED at the end of the bill

    Adds a section

    Inserted: SEC. 22. CONSIDERATION OF LIFE-CYCLE COST REQUIRED.

    Inserted: Section 3305 of title 40, United States Code, is amended by adding at the end the following new subsection:

    Inserted: "(d) Consideration of Life-cycle Cost Required.--

    Inserted: "(1) Requirement.--The Administrator shall ensure that the life-cycle cost of a public building is considered in the construction or lease of a public building described in paragraph (2).

    Inserted: "(2) Federal buildings subject to requirement.--A public building is subject to the requirement under paragraph (1) if--

    Inserted: "(A) construction or lease of the building begins after the date of the enactment of the Civilian Property Realignment Act;

    Inserted: "(B) the estimated construction costs of the building exceed $1,000,000;

    Inserted: "(C) in the case of a lease, the square footage of the property is more than 25,000 square feet; and

    Inserted: "(D) Federal funding comprises more than 50 percent of the funding for the estimated construction or lease costs of the building.

    Inserted: "(3) Definitions.--In this subsection, the following definitions apply:

    Inserted: "(A) Life-cycle cost.--The term 'life-cycle cost' means the sum of the following costs, as estimated for the lifetime of a building:

    Inserted: "(i) Investment costs.

    Show 15 more inserted paragraphs

    Inserted: "(ii) Capital costs.

    Inserted: "(iii) Installation costs.

    Inserted: "(iv) Energy costs.

    Inserted: "(v) Operating costs.

    Inserted: "(vi) Maintenance costs.

    Inserted: "(vii) Replacement costs.

    Inserted: "(B) Lifetime of a building.--The term 'lifetime of a building' means, with respect to a building, the greater of--

    Inserted: "(i) the period of time during which the building is projected to be utilized; or

    Inserted: "(ii) 50 years.".

    Inserted: SEC. 23. LONG-TERM SAVINGS THROUGH LIFE-CYCLE COST ANALYSIS.

    Inserted: Section 3307(b) of title 40, United States Code, as amended by section 19, is further amended--

    Inserted: (1) in paragraph (7), by striking "and" at the end;

    Inserted: (2) in paragraph (8), by striking the period at the end and inserting "; and"; and

    Inserted: (3) by adding at the end the following:

    Inserted: "(9) with respect to any prospectus for the construction, alteration, or acquisition of any building or space to be leased, a statement by the Administrator describing the use of life-cycle cost analysis and any increased design, construction, or acquisition costs identified by such analysis that are offset by lower long-term costs.".

    Original wording

    At the end of the bill, add the following new sections:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

At the end of the bill, add the following new sections:

SEC. 22. CONSIDERATION OF LIFE-CYCLE COST REQUIRED.

Section 3305 of title 40, United States Code, is amended by adding at the end the following new subsection:

“(d) Consideration of Life-cycle Cost Required.--

“(1) Requirement.--The Administrator shall ensure that the life-cycle cost of a public building is considered in the construction or lease of a public building described in paragraph (2).

“(2) Federal buildings subject to requirement.--A public building is subject to the requirement under paragraph (1) if--

“(A) construction or lease of the building begins after the date of the enactment of the Civilian Property Realignment Act;

“(B) the estimated construction costs of the building exceed $1,000,000;

“(C) in the case of a lease, the square footage of the property is more than 25,000 square feet; and

“(D) Federal funding comprises more than 50 percent of the funding for the estimated construction or lease costs of the building.

“(3) Definitions.--In this subsection, the following definitions apply:

“(A) Life-cycle cost.--The term ‘life-cycle cost' means the sum of the following costs, as estimated for the lifetime of a building:

“(i) Investment costs.

“(ii) Capital costs.

“(iii) Installation costs.

“(iv) Energy costs.

“(v) Operating costs.

“(vi) Maintenance costs.

“(vii) Replacement costs.

“(B) Lifetime of a building.--The term ‘lifetime of a building' means, with respect to a building, the greater of--

“(i) the period of time during which the building is projected to be utilized; or

“(ii) 50 years.”.

SEC. 23. LONG-TERM SAVINGS THROUGH LIFE-CYCLE COST ANALYSIS.

Section 3307(b) of title 40, United States Code, as amended by section 19, is further amended--

(1) in paragraph (7), by striking “and” at the end;

(2) in paragraph (8), by striking the period at the end and inserting “; and”; and

(3) by adding at the end the following:

“(9) with respect to any prospectus for the construction, alteration, or acquisition of any building or space to be leased, a statement by the Administrator describing the use of life-cycle cost analysis and any increased design, construction, or acquisition costs identified by such analysis that are offset by lower long-term costs.”.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

5 earlier actions
Floor Latest Action

House amendment offered

February 6, 2012

View full timeline
Floor

House amendment offered

February 6, 2012

Floor

House amendment agreed to: On agreeing to the Carnahan amendment (A004) Agreed to by voice vote.

February 6, 2012 • 8:11 PM

Not Used

Amendment agreed to Committee of the Whole

February 6, 2012 • 8:11 PM

Not Used

House amendment offered/reported by: Amendment (A004) offered by Mr. Carnahan.(consideration: CR H502-503; text: CR H502)

February 6, 2012 • 8:04 PM

Floor

Amendment (A004) offered by Mr. Carnahan. (consideration: CR H502-503; text: CR H502)

February 6, 2012 • 8:04 PM

Floor

On agreeing to the Carnahan amendment (A004) Agreed to by voice vote.

February 6, 2012 • 8:11 PM