S.Amdt. 2858Senate112th Congress (2011-2013)

S.Amdt. 2858

Submitted September 21, 2012

Text

Submitted

This amendment's own text couldn't be picked out of its Congressional Record passage, so the passage is shown in full.

SA 2858. Mr. HATCH submitted an amendment intended to be proposed by
him to the bill S. 3525, to protect and enhance opportunities for
recreational hunting, fishing, and shooting, and for other purposes;
which was ordered to lie on the table.

       At the end, add the following:

           TITLE III--PUTTING THE GULF OF MEXICO BACK TO WORK

     SEC. 301. SHORT TITLE.

       This title may be cited as the ``Putting the Gulf of Mexico
     Back to Work Act''.

     SEC. 302. DEFINITIONS.

       In this title:
       (1) Covered civil action.--The term ``covered civil
     action'' means a civil action containing a claim under
     section 702 of title 5, United States Code, regarding agency
     action (as defined for the purposes of that section)
     affecting a covered energy project in the Gulf of Mexico.
       (2) Covered energy project.--
       (A) In general.--The term ``covered energy project'' means
     the leasing of Federal land of the outer Continental Shelf
     for the exploration, development, production, processing, or
     transmission of oil, natural gas, wind, or any other source
     of energy in the Gulf of Mexico, and any action under a
     lease.
       (B) Exclusion.--The term ``covered energy project'' does
     not include any dispute between the parties to a lease
     regarding the obligations under the lease, including any
     alleged breach of the lease.
       (3) Secretary.--The term ``Secretary'' means the Secretary
     of the Interior.

                Subtitle A--Outer Continental Shelf Land

     SEC. 311. DRILLING PERMITS.

       Section 11 of the Outer Continental Shelf Lands Act (43
     U.S.C. 1340) is amended by striking subsection (d) and
     inserting the following:
       ``(d) Drilling Permits.--
       ``(1) In general.--The Secretary shall by regulation
     require that any lessee operating under an approved
     exploration plan--
       ``(A) obtain a permit before drilling any well in
     accordance with the plan; and
       ``(B) obtain a new permit before drilling any well of a
     design that is significantly different than the design for
     which the existing permit was issued.
       ``(2) Safety review required.--The Secretary shall not
     issue a permit under paragraph (1) without ensuring that the
     proposed drilling operations meet all--
       ``(A) critical safety system requirements, including
     blowout prevention; and
       ``(B) oil spill response and containment requirements.
       ``(3) Timeline.--
       ``(A) In general.--The Secretary shall determine whether to
     issue a permit under paragraph (1) not later than 30 days
     after the date on which the Secretary receives the
     application for a permit.
       ``(B) Extension of time.--
       ``(i) In general.--The Secretary may extend the period in
     which to consider an application for a permit for up to 2
     periods of 15 days each if the Secretary has given written
     notice of the delay to the applicant.
       ``(ii) Notice.--The notice described in clause (i) shall--

       ``(I) be in the form of a letter from the Secretary or a
     designee of the Secretary; and

[[Page S6640]]

       ``(II) include--

       ``(aa) the name and title of each individual processing the
     application;
       ``(bb) the reason for the delay; and
       ``(cc) the date on which the Secretary expects to make a
     final decision on the application.
       ``(4) Denial of application.--If the Secretary denies the
     application, the Secretary shall provide the applicant--
       ``(A) a written statement that provides clear and
     comprehensive reasons why the application was not accepted
     and detailed information concerning any deficiency; and
       ``(B) an opportunity to remedy any deficiencies.
       ``(5) Failure to make decision within 60 days.--If the
     Secretary does not make a decision on the application by the
     date that is 60 days from the date on which the Secretary
     receives the application, the application shall be considered
     approved.''.

    Subtitle B--Judicial Review of Agency Actions Relating to Outer
             Continental Shelf Activities in Gulf of Mexico

     SEC. 322. EXCLUSIVE VENUE FOR CERTAIN CIVIL ACTIONS RELATING
                   TO COVERED ENERGY PROJECTS IN GULF OF MEXICO.

       A covered civil action shall be brought only in a judicial
     district in the Fifth Circuit unless there is no district in
     that circuit in which the action may be brought.

     SEC. 323. TIME LIMITATION ON FILING.

       A covered civil action is barred unless the action is filed
     not later than the date that is 60 days after the date of the
     final Federal agency action.

     SEC. 324. EXPEDITION IN HEARING AND DETERMINING ACTION.

       A court shall endeavor to hear and determine any covered
     civil action as expeditiously as practicable.

     SEC. 325. STANDARD OF REVIEW.

       (a) In General.--In any judicial review of a covered civil
     action, administrative findings and conclusions relating to
     the challenged Federal action or decision shall be presumed
     to be correct.
       (b) Standard.--The presumption described in subsection (a)
     may be rebutted only by a preponderance of the evidence
     contained in the administrative record.

     SEC. 326. LIMITATION ON PROSPECTIVE RELIEF.

       In a covered civil action, a court shall not grant or
     approve any prospective relief unless the court finds that
     the relief is narrowly drawn, extends no further than
     necessary to correct the violation of a legal requirement,
     and is the least intrusive means necessary to correct that
     violation.

     SEC. 327. LIMITATION ON ATTORNEYS' FEES.

       (a) In General.--Sections 504 of title 5 and 2412 of title
     28, United States Code, do not apply to a covered civil
     action.
       (b) Payment From Federal Government.--No party to a covered
     civil action shall receive from the Federal Government
     payment for attorneys' fees, expenses, and other court costs.

           TITLE IV--RESTARTING AMERICAN OFFSHORE LEASING NOW

     SEC. 401. SHORT TITLE.

       This title may be cited as the ``Restarting American
     Offshore Leasing Now Act''.

     SEC. 402. DEFINITIONS.

       In this title:
       (1) Environmental impact statement for the 2007-2012 5-year
     ocs plan.--The term ``environmental impact statement for the
     2007-2012 5-Year OCS plan'' means the final environmental
     impact statement prepared by the Secretary entitled ``Outer
     Continental Shelf Oil and Gas Leasing Program: 2007-2012'',
     and dated April 2007.
       (2) Multisale environmental impact statement.--The term
     ``multisale environmental impact statement'' means the
     environmental impact statement prepared by the Secretary
     relating to proposed Western Gulf of Mexico OCS Oil and Gas
     Lease Sales 204, 207, 210, 215, and 218, and proposed Central
     Gulf of Mexico OCS Oil and Gas Lease Sales 205, 206, 208,
     213, 216, and 222, and dated September 2008.
       (3) Secretary.--The term ``Secretary'' means the Secretary
     of the Interior.

     SEC. 403. REQUIREMENT TO CONDUCT PROPOSED OIL AND GAS LEASE
                   SALE 216 IN CENTRAL GULF OF MEXICO.

       (a) In General.--As soon as practicable, but not later than
     60 days after the date of enactment of this Act, the
     Secretary shall conduct offshore oil and gas Lease Sale 216
     under section 8 of the Outer Continental Shelf Lands Act (33
     U.S.C. 1337) .
       (b) Environmental Review.--For the purposes of the lease
     sale described in subsection (a), the environmental impact
     statement for the 2007-2012 5-Year OCS plan and the multisale
     environmental impact statement shall be considered to satisfy
     the requirements of the National Environmental Policy Act of
     1969 (42 U.S.C. 4321 et seq.).

     SEC. 404. REQUIREMENT TO CONDUCT PROPOSED OIL AND GAS LEASE
                   SALE 220 ON OUTER CONTINENTAL SHELF OFFSHORE
                   VIRGINIA.

       (a) In General.--As soon as practicable, but not later than
     1 year after the date of enactment of this Act, the Secretary
     shall conduct offshore oil and gas Lease Sale 220 under
     section 8 of the Outer Continental Shelf Lands Act (33 U.S.C.
     1337).
       (b) Environmental Review.--For the purposes of the lease
     sale described in subsection (a), the environmental impact
     statement for the 2007-2012 5-Year OCS plan and the multisale
     environmental impact statement shall be considered to satisfy
     the requirements of the National Environmental Policy Act of
     1969 (42 U.S.C. 4321 et seq.).

     SEC. 405. REQUIREMENT TO CONDUCT PROPOSED OIL AND GAS LEASE
                   SALE 222 IN CENTRAL GULF OF MEXICO.

       (a) In General.--As soon as practicable, but not later than
     60 days after the date of enactment of this Act, the
     Secretary shall conduct offshore oil and gas Lease Sale 222
     under section 8 of the Outer Continental Shelf Lands Act (33
     U.S.C. 1337).
       (b) Environmental Review.--For the purposes of the lease
     sale described in subsection (a), the environmental impact
     statement for the 2007-2012 5-Year OCS plan and the multisale
     environmental impact statement shall be considered to satisfy
     the requirements of the National Environmental Policy Act of
     1969 (42 U.S.C. 4321 et seq.).

        TITLE V--REVERSING PRESIDENT OBAMA'S OFFSHORE MORATORIUM

     SEC. 501. SHORT TITLE.

       This title may be cited as the ``Reversing President
     Obama's Offshore Moratorium Act''.

     SEC. 502. OUTER CONTINENTAL SHELF LEASING PROGRAM.

       Section 18(a) of the Outer Continental Shelf Lands Act (43
     U.S.C. 1344(a)) is amended by adding at the end the
     following:
       ``(5)(A) In each oil and gas leasing program under this
     section, the Secretary shall make available for leasing and
     conduct lease sales that include--
       ``(i) at least 50 percent of the available unleased acreage
     within each outer Continental Shelf planning area considered
     to have the largest undiscovered, technically recoverable oil
     and gas resources (on a total btu basis) based upon the most
     recent national geological assessment of the outer
     Continental Shelf, with an emphasis on offering the most
     geologically prospective parts of the planning area; and
       ``(ii) any State subdivision of an outer Continental Shelf
     planning area that the Governor of the State that represents
     that subdivision requests be made available for leasing.
       ``(B) In this paragraph, the term `available unleased
     acreage' means that portion of the outer Continental Shelf
     that is not under lease at the time of a proposed lease sale,
     and that has not otherwise been made unavailable for leasing
     by law.
       ``(6)(A) For the 2012-2017 5-year oil and gas leasing
     program, the Secretary shall make available for leasing any
     outer Continental Shelf planning areas that are estimated to
     contain more than--
       ``(i) 2,500,000,000 barrels of oil; or
       ``(ii) 7,500,000,000,000 cubic feet of natural gas.
       ``(B) To determine the planning areas described in
     subparagraph (A), the Secretary shall use the document
     entitled `Minerals Management Service Assessment of
     Undiscovered Technically Recoverable Oil and Gas Resources of
     the Nation's Outer Continental Shelf, 2006'.''.

     SEC. 503. DOMESTIC OIL AND NATURAL GAS PRODUCTION GOAL.

       Section 18 of the Outer Continental Shelf Lands Act (43
     U.S.C. 1344) is amended by striking subsection (b) and
     inserting the following:
       ``(b) Domestic Oil and Natural Gas Production Goal.---
       ``(1) In general.--In developing a 5-year oil and gas
     leasing program, subject to paragraph (2), the Secretary
     shall determine a domestic strategic production goal for the
     development of oil and natural gas as a result of that
     program, which goal shall be--
       ``(A) the best estimate of the practicable increase in
     domestic production of oil and natural gas from the outer
     Continental Shelf;
       ``(B) focused on meeting domestic demand for oil and
     natural gas and reducing the dependence of the United States
     on foreign energy; and
       ``(C) focused on the production increases achieved by the
     leasing program at the end of the 15-year period beginning on
     the effective date of the program.
       ``(2) 2012-2017 program goal.--For purposes of the 2012-
     2017 5-year oil and gas leasing program, the production goal
     referred to in paragraph (1) shall be an increase by 2027 of
     not less than--
       ``(A) 3,000,000 barrels in the quantity of oil produced per
     day; and
       ``(B) 10,000,000,000 cubic feet in the quantity of natural
     gas produced per day.
       ``(3) Reporting.--Beginning at the end of the 5-year period
     for which the program applies and annually thereafter, the
     Secretary shall submit to the Committee on Natural Resources
     of the House of Representatives and the Committee on Energy
     and Natural Resources of the Senate a report on the progress
     of the program in meeting the production goal that includes
     an identification of projections for production and any
     problems with leasing, permitting, or production that will
     prevent meeting the goal.''.

                  TITLE VI--JOBS AND ENERGY PERMITTING

     SEC. 601. SHORT TITLE.

       This title may be cited as the ``Jobs and Energy Permitting
     Act of 2012''.

     SEC. 602. AIR QUALITY MEASUREMENT.

       Section 328(a)(1) of the Clean Air Act (42 U.S.C.
     7627(a)(1)) is amended in the second sentence by inserting
     before the period at the end the following: ``, except that
     any air quality impact of any OCS source shall be

[[Page S6641]]

     measured or modeled, as appropriate, and determined solely
     with respect to the impacts in the corresponding onshore
     area''.

     SEC. 603. OCS SOURCE.

       Section 328(a)(4)(C) of the Clean Air Act (42 U.S.C.
     7627(a)(4)(C)) is amended in the second sentence of the
     matter following clause (iii) by striking ``shall be
     considered direct emissions from the OCS source'' and
     inserting ``shall be considered direct emissions from the OCS
     source but shall not be subject to any emission control
     requirement applicable to the source under subpart 1 of part
     C of title I of this Act. For platform or drill ship
     exploration, an OCS source is established at the point in
     time when drilling commences at a location and ceases to
     exist when drilling activity ends at the location or is
     temporarily interrupted because the platform or drill ship
     relocates for weather or other reasons''.

     SEC. 604. PERMITS.

       (a) Permits.--Section 328 of the Clean Air Act (42 U.S.C.
     7627) is amended by adding at the end the following:
       ``(d) Permit Application.--In the case of a completed
     application for a permit under this Act for platform or drill
     ship exploration for an OCS source--
       ``(1) final agency action (including any reconsideration of
     the issuance or denial of such a permit) shall be taken not
     later than 180 days after the date on which the completed
     application is filed;
       ``(2) the Environmental Appeals Board of the Environmental
     Protection Agency shall have no authority to consider any
     matter regarding the consideration, issuance, or denial of
     the permit;
       ``(3) no administrative stay of the effectiveness of the
     permit may extend beyond the date that is 180 days after the
     date on which the completed application is filed;
       ``(4) that final agency action shall be considered to be
     nationally applicable under section 307(b); and
       ``(5) judicial review of that final agency action shall be
     available only in accordance with section 307(b) without
     additional administrative review or adjudication.''.
       (b) Conforming Amendment.--Section 328(a)(4) of the Clean
     Air Act (42 U.S.C. 7627(a)(4)) is amended by striking ``For
     purposes of subsections (a) and (b) of this section--'' and
     inserting ``For purposes of subsections (a), (b), and (d):''.

       TITLE VII--SACRAMENTO-SAN JOAQUIN VALLEY WATER RELIABILITY

     SEC. 701. SHORT TITLE.

       This title may be cited as the ``Sacramento-San Joaquin
     Valley Water Reliability Act''.

          Subtitle A--Central Valley Project Water Reliability

     SEC. 711. AMENDMENT TO PURPOSES.

       Section 3402 of the Central Valley Project Improvement Act
     (Public Law 102-575; 106 Stat. 4706) is amended--
       (1) in subsection (f), by striking the period at the end;
     and
       (2) by adding at the end the following:
       ``(g) to ensure that water dedicated to fish and wildlife
     purposes by this title is replaced and provided to Central
     Valley Project water contractors not later than December 31,
     2016, at the lowest cost reasonably achievable; and
       ``(h) to facilitate and expedite water transfers in
     accordance with this title.''.

     SEC. 712. AMENDMENT TO DEFINITION.

       Section 3403 of the Central Valley Project Improvement Act
     (Public Law 102-575; 106 Stat. 4707) is amended--
       (1) by striking subsection (a) and inserting the following:
       ``(a) the term `anadromous fish' means those native stocks
     of salmon (including steelhead) and sturgeon that--
       ``(1) as of October 30, 1992, were present in the
     Sacramento and San Joaquin Rivers and the tributaries of the
     Sacramento and San Joaquin Rivers; and
       ``(2) ascend those rivers and tributaries to reproduce
     after maturing in San Francisco Bay or the Pacific Ocean;'';
       (2) by redesignating subsections (i) through (m) as
     subsections (j) through (n), respectively; and
       (3) by inserting after subsection (h) the following:
       ``(i) the term `reasonable flows' means water flows capable
     of being maintained taking into account competing consumptive
     uses of water and economic, environmental, and social
     factors.''.

     SEC. 713. CONTRACTS.

       Section 3404 of the Central Valley Project Improvement Act
     (Public Law 102-575; 106 Stat. 4708) is amended to read as
     follows:

     ``SEC. 3404. CONTRACTS.

       ``(a) Renewal of Existing Long-term Contracts.--On request
     of the contractor, the Secretary shall renew any existing
     long-term repayment or water service contract that provides
     for the delivery of water from the Central Valley Project for
     a period of 40 years.
       ``(b) Administration of Contracts.--Except as expressly
     provided by this title, any existing long-term repayment or
     water service contract for the delivery of water from the
     Central Valley Project shall be administered pursuant to the
     Act of July 2, 1956 (chapter 492; 70 Stat. 483).
       ``(c) Delivery Charge.--Beginning on the date of enactment
     of this Act, a contract entered into or renewed pursuant to
     this section shall include a provision that requires the
     Secretary to charge any other party to the contract only for
     water actually delivered by the Secretary.''.

     SEC. 714. WATER TRANSFERS, IMPROVED WATER MANAGEMENT, AND
                   CONSERVATION.

       Section 3405 of the Central Valley Project Improvement Act
     (Public Law 102-575; 106 Stat. 4709) is amended--
       (1) in subsection (a)--
       (A) in the second sentence, by striking ``Except as
     provided herein'' and inserting ``The Secretary shall take
     all actions necessary to facilitate and expedite transfers of
     Central Valley Project water in accordance with this title or
     any other provision of Federal reclamation law and the
     National Environmental Policy Act of 1969 (42 U.S.C. 4321 et
     seq.). Except as provided in this subsection,'';
       (B) in paragraph (1)(A), by striking ``to combination'' and
     inserting ``or combination'';
       (C) in paragraph (2), by adding at the end the following:
       ``(E) Written transfer proposals.--
       ``(i) In general.--The contracting district from which the
     water is supplied, the agency, or the Secretary, as
     applicable, shall determine whether a written transfer
     proposal is complete not later than 45 days after the date on
     which the proposal is submitted.
       ``(ii) Determination.--If the contracting district, the
     agency, or the Secretary determines that the proposal
     described in clause (i) is incomplete, the contracting
     district, agency, or Secretary shall state, in writing and
     with specificity, the conditions under which the proposal
     would be considered complete.
       ``(F) No mitigation requirements.--
       ``(i) In general.--Except as provided in this section, the
     Secretary shall not impose mitigation or other requirements
     on a proposed transfer.
       ``(ii) Applicability.--This section shall have no effect on
     the authority of the contracting district from which the
     water is supplied or the agency under State law to approve or
     condition a proposed transfer.''; and
       (D) by adding at the end the following:
       ``(4) Applicability.--Notwithstanding any other provision
     of Federal reclamation law--
       ``(A) the authority to transfer, exchange, bank, or make
     recharging arrangements using Central Valley Project water
     that could have been carried out before October 30, 1992, is
     valid, and those transfers, exchanges, or arrangements shall
     not be subject to, limited, or conditioned by this title; and
       ``(B) this title does not supersede or revoke the authority
     to transfer, exchange, bank, or recharge Central Valley
     Project water in effect before October 30, 1992.'';
       (2) in subsection (b)--
       (A) in the heading, by striking ``METERING'' and inserting
     ``MEASUREMENT'';
       (B) in the first sentence, by striking ``All Central
     Valley'' and inserting the following:
       ``(1) In general.--All Central Valley'';
       (C) in the second sentence, by striking ``The contracting
     district'' and inserting the following:
       ``(3) Annual report.--The contracting district''; and
       (D) by inserting after paragraph (1) (as designated by
     subparagraph (B)) the following:
       ``(2) Measurement requirements.--The contracting district
     or agency, not including contracting districts serving
     multiple agencies with separate governing boards, shall
     ensure that all contractor-owned water delivery systems
     within the boundaries of the contracting district or agency
     measure surface water at the facilities of the contracting
     district or agency up to the point at which the surface water
     is commingled with other water supplies.'';
       (3) by striking subsection (d);
       (4) by redesignating subsections (e) and (f) as subsections
     (d) and (e), respectively; and
       (5) by striking subsection (e) (as redesignated by
     paragraph (4)) and inserting the following:
       ``(e) Increased Revenues.--All revenues received by the
     Secretary that exceed the cost-of-service rates applicable to
     the delivery of water transferred from irrigation use to
     municipal and industrial use under subsection (a) shall be
     covered to the Restoration Fund.''.

     SEC. 715. FISH, WILDLIFE, AND HABITAT RESTORATION.

       Section 3406 of the Central Valley Project Improvement Act
     (Public Law 102-575; 106 Stat. 4714) is amended--
       (1) in subsection (b)--
       (A) by striking paragraph (1)(B) and inserting the
     following:
       ``(B) Administration.--
       ``(i) In general.--As needed to carry out the goals of the
     Central Valley Project, the Secretary may modify Central
     Valley Project operations to provide reasonable flows of
     suitable quality, quantity, and timing to protect all life
     stages of anadromous fish.
       ``(ii) Requirements.--The flows under clause (i) shall be
     provided from the quantity of water dedicated to fish,
     wildlife, and habitat restoration purposes under paragraph
     (2) from the water supplies acquired pursuant to paragraph
     (3) and from other sources which do not conflict with
     fulfillment of the remaining contractual obligations of the
     Secretary to provide Central Valley Project water for other
     authorized purposes.
       ``(iii) Determination of needs.--The Secretary shall
     determine the instream reasonable flow needs for all Central
     Valley Project controlled streams and rivers based on
     recommendations of the United States Fish and Wildlife
     Service and the National Marine

[[Page S6642]]

     Fisheries Service after consultation with the United States
     Geological Survey.''; and
       (B) in paragraph (2)--
       (i) in the matter preceding subparagraph (A)--

       (I) in the first sentence, by striking ``primary purpose''
     and inserting ``purposes'';
       (II) by striking ``but not limited to additional
     obligations under the Federal Endangered Species Act'' and
     inserting ``additional obligations under the Endangered
     Species Act of 1973 (16 U.S.C. 1531 et seq.)''; and
       (III) by adding at the end the following: ``All Central
     Valley Project water used for the purposes specified in this
     paragraph shall be credited to the quantity of Central Valley
     Project yield dedicated and managed under this paragraph by
     determining how the dedication and management of that water
     would affect the delivery capability of the Central Valley
     Project yield. To the maximum extent practicable and in
     accordance with section 3411, Central Valley Project water
     dedicated and managed pursuant to this paragraph shall be
     reused to fulfill the remaining contractual obligations of
     the Secretary to provide Central Valley Project water for
     agricultural or municipal and industrial purposes.''; and

       (ii) by striking subparagraph (C) and inserting the
     following:
       ``(C) Mandatory reduction.--If on March 15 of a given year,
     the quantity of Central Valley Project water forecasted to be
     made available to water service or repayment contractors in
     the Delta Division of the Central Valley Project is less than
     75 percent of the total quantity of water to be made
     available under those contracts, the quantity of Central
     Valley Project yield dedicated and managed for that year
     under this paragraph shall be reduced by 25 percent.''; and
       (2) by adding at the end the following:
       ``(i) Satisfaction of Purposes.--In carrying out this
     section, the Secretary shall be considered to have met the
     mitigation, protection, restoration, and enhancement purposes
     of this title.''.

     SEC. 716. RESTORATION FUND.

       (a) In General.--Section 3407(a) of the Central Valley
     Project Improvement Act (Public Law 102-575; 106 Stat. 4726)
     is amended--
       (1) by striking ``There is hereby'' and inserting the
     following:
       ``(1) Establishment.--
       ``(A) In general.--There is'';
       (2) in paragraph (1)(A) (as designated by paragraph (1)),
     by striking ``Not less than 67 percent'' and all that follows
     through ``Monies'' and inserting the following:
       ``(B) Use of donated amounts.--Amounts''; and
       (3) by adding at the end the following:
       ``(2) Restrictions.--The Secretary may not directly or
     indirectly require a donation or other payment (including
     environmental restoration or mitigation fees not otherwise
     provided by law) to the Restoration Fund--
       ``(A) as a condition of--
       ``(i) providing for the storage or conveyance of non-
     Central Valley Project water pursuant to Federal reclamation
     laws; or
       ``(ii) the delivery of water pursuant to section 215 of the
     Reclamation Reform Act of 1982 (Public Law 97-293; 96 Stat.
     1270); or
       ``(B) for any water that is delivered with the sole intent
     of groundwater recharge.''.
       (b) Certain Payments.--Section 3407(c)(1) of the Central
     Valley Project Improvement Act (Public Law 102-575; 106 Stat.
     4726) is amended--
       (1) by striking ``mitigation and restoration payments, in
     addition to charges provided for or'' and inserting
     ``payments, in addition to charges''; and
       (2) by striking ``of fish, wildlife'' and all that follows
     through the period and inserting ``of carrying out this
     title.''.
       (c) Adjustment and Assessment of Mitigation and Restoration
     Payments.--Section 3407(d) of the Central Valley Project
     Improvement Act (Public Law 102-575; 106 Stat. 4727) is
     amended--
       (1) in paragraph (2)(A)--
       (A) by striking ``, and $12 per acre-foot (October 1992
     price levels) for municipal and industrial water sold and
     delivered by the Central Valley Project'' and inserting ``$12
     per acre-foot (October 1992 price levels) for municipal and
     industrial water sold and delivered by the Central Valley
     Project, and after October 1, 2013, $4 per megawatt-hour for
     Central Valley Project power sold to power contractors
     (October 2013 price levels)''; and
       (B) by inserting `` but not later than December 31, 2020,''
     after ``That upon the completion of the fish, wildlife, and
     habitat mitigation and restoration actions mandated under
     section 3406 of this title,''; and
       (2) by adding at the end the following:
       ``(g) Report on Expenditure of Funds.--
       ``(1) In general.--For each fiscal year, the Secretary, in
     consultation with the Advisory Board, shall submit to
     Congress a plan for the expenditure of all of the funds
     deposited in the Restoration Fund during the preceding fiscal
     year.
       ``(2) Contents.--The plan shall include an analysis of the
     cost-effectiveness of each expenditure.
       ``(h) Advisory Board.--
       ``(1) Establishment.--There is established the Restoration
     Fund Advisory Board (referred to in this section as the
     `Advisory Board'), which shall be composed of 12 members
     appointed by the Secretary.
       ``(2) Membership.--
       ``(A) In general.--The Secretary shall appoint members to
     the Advisory Board that represent the various Central Valley
     Project stakeholders, of whom--
       ``(i) 4 members shall be agricultural users of the Central
     Valley Project;
       ``(ii) 3 members shall be municipal and industrial users of
     the Central Valley Project;
       ``(iii) 3 members shall be power contractors of the Central
     Valley Project; and
       ``(iv) 2 members shall be appointed at the discretion of
     the Secretary.
       ``(B) Observers.--The Secretary and the Secretary of
     Commerce may each designate a representative to act as an
     observer of the Advisory Board.
       ``(C) Chairman.--The Secretary shall appoint 1 of the
     members described in subparagraph (A) to serve as Chairman of
     the Advisory Board.
       ``(3) Terms.--The term of each member of the Advisory Board
     shall be for a period of 4 years.
       ``(4) Duties.--The duties of the Advisory Board are--
       ``(A) to meet not less frequently than semiannually to
     develop and make recommendations to the Secretary regarding
     priorities and spending levels on projects and programs
     carried out under this title;
       ``(B) to ensure that any advice given or recommendation
     made by the Advisory Board reflects the independent judgment
     of the Advisory Board;
       ``(C) not later than December 31, 2013, and annually
     thereafter, to submit to the Secretary and Congress the
     recommendations under subparagraph (A); and
       ``(D) not later than December 31, 2013, and biennially
     thereafter, to submit to Congress a report that details the
     progress made in achieving the actions required under section
     3406.
       ``(5) Administration.--With the consent of the appropriate
     agency head, the Advisory Board may use the facilities and
     services of any Federal agency.''.

     SEC. 717. ADDITIONAL AUTHORITIES.

       (a) Authority for Certain Activities.--Section 3408 of the
     Central Valley Project Improvement Act (Public Law 102-575;
     106 Stat. 4728) is amended by striking subsection (c) and
     inserting the following:
       ``(c) Contracts for Additional Storage and Delivery of
     Water.--
       ``(1) In general.--The Secretary may enter into contracts
     under the reclamation laws and this title with any Federal
     agency, California water user or water agency, State agency,
     or private organization for the exchange, impoundment,
     storage, carriage, and delivery of nonproject water for
     domestic, municipal, industrial, fish and wildlife, and any
     other beneficial purpose.
       ``(2) Limitation.--Nothing in this subsection supersedes
     section 2(d) of the Act of August 26, 1937 (chapter 832; 50
     Stat. 850; 100 Stat. 3051).
       ``(3) Authority for certain activities.--The Secretary
     shall use the authority granted by this subsection in
     connection with requests to exchange, impound, store, carry,
     or deliver nonproject water using Central Valley Project
     facilities for any beneficial purpose.
       ``(4) Rates.--
       ``(A) In general.--The Secretary shall develop rates not to
     exceed the amount required to recover the reasonable costs
     incurred by the Secretary in connection with a beneficial
     purpose under this subsection.
       ``(B) Administration.--The rates shall be charged to a
     party using Central Valley Project facilities for a
     beneficial purpose, but the costs described in subparagraph
     (A) shall not include any donation or other payment to the
     Restoration Fund.
       ``(5) Construction.--This subsection shall be construed and
     implemented to facilitate and encourage the use of Central
     Valley Project facilities to exchange, impound, store, carry,
     or deliver nonproject water for any beneficial purpose.''.
       (b) Reporting Requirements.--Section 3408(f) of the Central
     Valley Project Improvement Act (Public Law 102-575; 106 Stat.
     4729) is amended--
       (1) in the first sentence, by striking ``Interior and
     Insular Affairs and the Committee on Merchant Marine and
     Fisheries'' and inserting ``Natural Resources'';
       (2) in the second sentence, by inserting ``, including
     progress on the plan under subsection (j)'' before the period
     at the end; and
       (3) by adding at the end the following: ``The filing and
     adequacy of the report shall be personally certified to the
     Committees by the Regional Director of the Mid-Pacific Region
     of the Bureau of Reclamation.''.
       (c) Project Yield Increase.--Section 3408(j) of the Central
     Valley Project Improvement Act (Public Law 102-575; 106 Stat.
     4730) is amended--
       (1) by redesignating paragraphs (1) through (7) as
     subparagraphs (A) through (G), respectively, and indenting
     appropriately;
       (2) by striking ``In order to minimize adverse effects, if
     any, upon'' and inserting the following:
       ``(1) In general.--In order to minimize adverse effects
     upon'';
       (3) in the second sentence, by striking ``The plan'' and
     all that follows through ``options:'' and inserting the
     following:
       ``(2) Contents.--The plan shall include recommendations on
     appropriate cost-sharing arrangements and authorizing
     legislation or other measures needed to implement the intent,
     purposes, and provisions of this subsection, as well as a
     description of how the Secretary intends to use--'';
       (4) in paragraph (1) (as designated by paragraph (2))--

[[Page S6643]]

       (A) by striking ``needs, the Secretary, shall'' and all
     that follows through ``to the Congress,'' and inserting
     ``needs, the Secretary, on a priority basis and not later
     than September 30, 2013, shall submit to Congress''; and
       (B) by striking ``increase,'' and all that follows through
     ``under this title'' and inserting ``increase, as soon as
     practicable, but not later than September 30, 2016 (except
     that the construction of new facilities shall not be limited
     by that deadline), the water of the Central Valley Project by
     the quantity dedicated and managed for fish and wildlife
     purposes under this title and otherwise required to meet the
     purposes of the Central Valley Project, including satisfying
     contractual obligations'';
       (5) in paragraph (2)(A) (as designated by paragraph (1)),
     by inserting ``and construction of new water storage
     facilities'' before the semicolon;
       (6) in paragraph (2)(F) (as designated by paragraph (1)),
     by striking ``and'' at the end;
       (7) in paragraph (2)(G) (as designated by paragraph (1)),
     by striking the period and all that follows through the end
     of the subsection and inserting ``; and''; and
       (8) by adding after paragraph (2)(G) the following:
       ``(H) water banking and recharge.
       ``(3) Implementation of plan.--
       ``(A) In general.--The Secretary shall implement the plan
     under paragraph (1) beginning on October 1, 2013.
       ``(B) Coordination.--In carrying out this subsection, the
     Secretary shall coordinate with the State of California in
     implementing measures for the long-term resolution of
     problems in the San Francisco Bay/Sacramento-San Joaquin
     Delta Estuary.
       ``(4) Failure of plan.--Notwithstanding any other provision
     of the reclamation laws, if by September 30, 2016, the plan
     under paragraph (1) fails to increase the annual delivery
     capability of the Central Valley Project by 800,000 acre-
     feet, implementation of any nonmandatory action under section
     3406(b)(2) shall be suspended until the date on which the
     plan achieves an increase in the annual delivery capability
     of the Central Valley Project of 800,000 acre-feet.''.
       (d) Technical Corrections.--Section 3408(h) of the Central
     Valley Project Improvement Act (Public Law 102-575; 106 Stat.
     4729) is amended--
       (1) in paragraph (1), by striking ``paragraph (h)(2)'' and
     inserting ``paragraph (2)''; and
       (2) in paragraph (2), by striking ``paragraph (h)(i)'' and
     inserting ``paragraph (1)''.
       (e) Water Storage Project Construction.--
       (1) In general.--The Secretary of the Interior, acting
     through the Commissioner of Reclamation, may partner or enter
     into an agreement relating to the water storage projects
     described in section 103(d)(1) of the Water Supply,
     Reliability, and Environmental Improvement Act (Public Law
     108-361; 118 Stat. 1684) with local joint powers authorities
     formed under State law by irrigation districts and other
     local governments or water districts within the applicable
     hydrological region to advance those water storage projects.
       (2) No additional federal amounts.--
       (A) In general.--Subject to subparagraph (B), no additional
     Federal amounts are authorized to be appropriated to carry
     out the activities described in clauses (i) through (iii) of
     sections 103(d)(1)(A) of the Water Supply, Reliability, and
     Environmental Improvement Act (Public Law 108-361; 118 Stat.
     1684) Public Law 108-361.
       (B) Exception.--Additional Federal amounts may be
     appropriated for construction of a project described in
     subparagraph (A) if non-Federal amounts are used to finance
     and construct the project.

     SEC. 718. BAY-DELTA ACCORD.

       (a) Congressional Direction Regarding Central Valley
     Project and California State Water Project Operations.--
       (1) In general.--The Central Valley Project and the
     California State Water Project shall be operated strictly in
     accordance with the water quality standards and operational
     constraints described in the ``Principles for Agreement on
     the Bay-Delta Standards Between the State of California and
     the Federal Government'' dated December 15, 1994.
       (2) Applicability of other law.--The Endangered Species Act
     of 1973 (16 U.S.C. 1531 et seq.) and other applicable law
     shall not apply to operations described in paragraph (1).
       (3) Implementation.--Implementation of the ``Principles for
     Agreement on the Bay-Delta Standards Between the State of
     California and the Federal Government'' dated December 15,
     1994, shall be in strict compliance with the water rights
     priority system and statutory protections for areas of
     origin.
       (b) Application of Laws to Others.--
       (1) In general.--As a condition of the receipt of Federal
     amounts for the Central Valley Project and the California
     State Water Project, the State of California (including any
     agency or board of the State of California), on any water
     right obtained pursuant to State law, including a pre-1914
     appropriative right, shall not--
       (A) impose any condition that restricts the exercise of
     that water right that is affected by operations of the
     Central Valley Project or California State Water Project;
       (B) restrict under the Public Trust Doctrine any public
     trust value imposed in order to conserve, enhance, recover,
     or otherwise protect any species.
       (2) Federal agencies.--The prohibition under paragraph
     (1)(A) shall apply to Federal agencies.
       (c) Costs.--No cost associated with the implementation of
     this section shall be imposed directly or indirectly on any
     Central Valley Project contractor, or any other person or
     entity, unless those costs are incurred on a voluntary basis.
       (d) Native Species Protection.--This section preempts any
     law of the State California law restricting the quantity or
     size of a nonnative fish that is taken or harvested that
     preys on 1 or more native fish species that occupy the
     Sacramento and San Joaquin Rivers and the tributaries of
     those rivers or the Sacramento-San Joaquin Rivers Delta.

     SEC. 719. NATURAL AND ARTIFICIALLY SPAWNED SPECIES.

       After the date of enactment of this Act, and regardless of
     the date of listing, the Secretaries of the Interior and
     Commerce shall not distinguish between natural-spawned and
     hatchery-spawned (or otherwise artificially propagated
     strains of a species) in making any determination under the
     Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) that
     relates to an anadromous fish species present in the
     Sacramento and San Joaquin Rivers or the tributaries of those
     rivers and that ascends those rivers and tributaries to
     reproduce after maturing in San Francisco Bay or the Pacific
     Ocean.

     SEC. 720. AUTHORIZED SERVICE AREA.

       (a) In General.--The Secretary of the Interior, acting
     through the Commissioner of Reclamation, shall include in the
     service area of the Central Valley Project authorized under
     the Central Valley Project Improvement Act (Public Law 102-
     575; 106 Stat. 4706) the area within the boundaries of the
     Kettleman City Community Services District, California, as
     those boundaries are defined as of the date of enactment of
     this Act.
       (b) Long-term Contract.--
       (1) In general.--Notwithstanding the Central Valley Project
     Improvement Act (Public Law 102-575; 106 Stat. 4706) and
     subject to paragraph (2), the Secretary, in accordance with
     the reclamation laws, shall enter into a long-term contract
     with the Kettleman City Community Services District or the
     delivery of not more than 900 acre-feet of Central Valley
     Project water for municipal and industrial use.
       (2) Reduction in contract.--The Secretary may temporarily
     reduce deliveries of the quantity of water made available
     under paragraph (1) by not more than 25 percent of the total
     whenever reductions due to hydrologic circumstances are
     imposed on agricultural deliveries of Central Valley Project
     water.
       (c) Additional Cost.--If any additional infrastructure or
     related costs are needed to implement this section, those
     costs shall be the responsibility of the non-Federal entity.

     SEC. 721. REGULATORY STREAMLINING.

       (a) Definitions.--In this section:
       (1) CVP.--The term ``CVP'' means the Central Valley
     Project.
       (2) Project.--The term ``project''--
       (A) means an activity that--
       (i) is undertaken by a public agency, funded by a public
     agency, or requires the issuance of a permit by a public
     agency;
       (ii) has a potential to result in a physical change to the
     environment; and
       (iii) may be subject to several discretionary approvals by
     governmental agencies;
       (B) may include construction activities, clearing or
     grading of land, improvements to existing structures, and
     activities or equipment involving the issuance of a permit;
     or
       (C) has the meaning given the term defined in section 21065
     of the California Public Resource Code.
       (b) Applicability of Certain Laws.--The filing of a notice
     of determination or a notice of exemption for any project,
     including the issuance of a permit under State law, for any
     project of the CVP or the delivery of water from the CVP in
     accordance with the California Environmental Quality Act
     shall be considered to meet the requirements for that project
     or permit under section 102(2)(C) of the National
     Environmental Protection Act of 1969 (42 U.S.C. 4332(2)(C)).
       (c) Continuation of Project.--The Bureau of Reclamation
     shall not be required to cease or modify any major Federal
     action or other activity for any project of the CVP or the
     delivery of water from the CVP pending completion of judicial
     review of any determination made under the National
     Environmental Protection Act of 1969 (42 U.S.C. 4321 et
     seq.).

               Subtitle B--San Joaquin River Restoration

     SEC. 731. REPEAL OF THE SAN JOAQUIN RIVER SETTLEMENT.

       As of the date of enactment of this Act, the Secretary
     shall cease any action to implement the Stipulation of
     Settlement, Natural Resources Defense Council, Inc. v.
     Rodgers, No. Civ. S-88-1658 LKK/GGH (E.D. Cal. Sept. 13,
     2006).

     SEC. 732. PURPOSE.

       Section 10002 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1349) is amended
     by striking ``implementation of the Settlement'' and
     inserting ``restoration of the San Joaquin River''.

     SEC. 733. DEFINITIONS.

       Section 10003 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1349) is
     amended--
       (1) by redesignating paragraphs (2) and (3) as paragraphs
     (3) and (4), respectively;
       (2) by striking paragraph (1) and inserting the following:
       ``(1) Critical water year.--The term `critical water year'
     means a year in which the

[[Page S6644]]

     total unimpaired runoff at Friant Dam is less than 400,000
     acre-feet, as forecasted as of March 1 of that water year by
     the California Department of Water Resources.
       ``(2) Restoration flows.--The term `Restoration Flows'
     means the additional water released or bypassed from Friant
     Dam to ensure that the target flow entering Mendota Pool,
     located approximately 62 river miles downstream from Friant
     Dam, does not fall below a speed of 50 cubic feet per
     second.''; and
       (3) by striking paragraph (4) (as redesignated by paragraph
     (1)) and inserting the following:
       ``(4) Water year.--The term `water year' means the period
     beginning March 1 of a given year and ending on the last day
     of February of the following calendar year.''.

     SEC. 734. IMPLEMENTATION OF RESTORATION.

       Section 10004 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1350) is
     amended--
       (1) in subsection (a)--
       (A) by striking ``hereby authorized and directed'' and all
     that follows through ``in the Settlement:'' and inserting
     ``may carry out the following:'';
       (B) by striking paragraphs (1), (2), (4), and (5);
       (C) by redesignating paragraph (3) as paragraph (1);
       (D) in paragraph (1) (as redesignated by subparagraph (C)),
     by striking ``paragraph 13 of the Settlement'' and inserting
     ``this part''; and
       (E) by adding at the end the following :
       ``(2) In each water year, beginning in the water year
     commencing on March 1, 2013, the Secretary--
       ``(A) shall modify Friant Dam operations to release the
     Restoration Flows for that water year, unless the year is a
     critical water year;
       ``(B) shall ensure that--
       ``(i) the release of Restoration Flows are maintained at
     the level prescribed by this part; and
       ``(ii) Restoration Flows do not reach downstream of Mendota
     Pool;
       ``(C) shall release the Restoration Flows in a manner that
     improves the fishery in the San Joaquin River below Friant
     Dam and upstream of Gravelly Ford, Nevada, as in existence on
     the date of the enactment of the Sacramento and San Joaquin
     Valleys Water Reliability Act, including the associated
     riparian habitat; and
       ``(D) may, without limiting the actions required under
     subparagraphs (A) and (C) and subject to paragraph (3) and
     subsection (l), use the Restoration Flows to enhance or
     restore a warm water fishery downstream of Gravelly Ford,
     Nevada, including to Mendota Pool, if the Secretary
     determines that the action is reasonable, prudent, and
     feasible.
       ``(3) Not later than 1 year after the date of enactment of
     the Sacramento and San Joaquin Valleys Water Reliability Act,
     the Secretary shall develop and implement, in cooperation
     with the State of California, a reasonable plan--
       ``(A) to fully recirculate, recapture, reuse, exchange, or
     transfer all Restoration Flows; and
       ``(B) to provide the recirculated, recaptured, reused,
     exchanged, or transferred flows to those contractors within
     the Friant Division, Hidden Unit, and Buchanan Unit of the
     Central Valley Project that relinquished the Restoration
     Flows that were recirculated, recaptured, reused, exchanged,
     or transferred.
       ``(4) The plan described in paragraph (3) shall--
       ``(A) address any impact on groundwater resources within
     the service area of the Friant Division, Hidden Unit, and
     Buchanan Unit of the Central Valley Project and mitigation
     may include groundwater banking and recharge projects;
       ``(B) not impact the water supply or water rights of any
     entity outside the Friant Division, Hidden Unit, and Buchanan
     Unit of the Central Valley Project; and
       ``(C) be subject to applicable provisions of California
     water law and the use by the Secretary of the Interior of
     Central Valley Project facilities to make Project water
     (other than water released from Friant Dam under this part)
     and water acquired through transfers available to existing
     south of Delta Central Valley Project contractors.'';
       (2) in subsection (b)--
       (A) in paragraph (1), by striking ``the Settlement'' and
     inserting ``this part''; and
       (B) in paragraph (2), by striking ``the Settlement'' and
     inserting ``this part'';
       (3) in subsection (c), by striking ``the Settlement'' and
     inserting ``this part'';
       (4) by striking subsection (d) and inserting the following:
       ``(d) Mitigation of Impacts.--
       ``(1) In general.--Not later than October 1, 2013 and
     subject to paragraph (2), the Secretary shall identify--
       ``(A) the impacts associated with the release of
     Restoration Flows prescribed in this part; and
       ``(B) the measures to be implemented to mitigate impacts on
     adjacent and downstream water users, landowners, and agencies
     as a result of Restoration Flows.
       ``(2) Mitigation measures.--Before implementing a decision
     or agreement to construct, improve, operate, or maintain a
     facility that the Secretary determines is necessary to
     implement this part, the Secretary shall implement all
     mitigation measures identified in paragraph (1)(B) before the
     date on which Restoration Flows are commenced.'';
       (5) in subsection (e), by striking ``the Settlement'' and
     inserting ``this part'';
       (6) in subsection (f), by striking ``the Settlement and
     section 10011'' and inserting ``this part'';
       (7) in subsection (g)--
       (A) by striking ``the Settlement and''; and
       (B) by striking ``or exchange contract'' and inserting
     ``exchange contract, water rights settlement, or holding
     contract'';
       (8) in subsection (h)--
       (A) by striking ``Interim'' in the header;
       (B) in paragraph (1)--
       (i) in the matter preceding subparagraph (A), by striking
     ``Interim Flows under the Settlement'' and inserting
     ``Restoration Flows under this part'';
       (ii) in subparagraph (C)--

       (I) in clause (i), by striking ``Interim'' and inserting
     ``Restoration''; and
       (II) in clause (ii), by inserting ``and'' after the
     semicolon;

       (iii) in subparagraph (D), by striking ``and'' at the end;
     and
       (iv) by striking subparagraph (E);
       (C) by striking paragraph (2) and inserting the following:
       ``(2) Conditions for release.--The Secretary may release
     Restoration Flows to the extent that the flows would not
     exceed existing downstream channel capacities.'';
       (D) in paragraph (3), by striking ``Interim'' and inserting
     ``Restoration''; and
       (E) by striking paragraph (4) and inserting the following:
       ``(4) Claims.--Not later than 60 days after the date of
     enactment of the Sacramento and San Joaquin Valleys Water
     Reliability Act, the Secretary shall issue, by regulation, a
     claims process to address claims, including groundwater
     seepage, flooding, or levee instability damages caused as a
     result of, arising out of, or related to implementation of
     this subtitle.'';
       (9) in subsection (i)--
       (A) in paragraph (1)--
       (i) in the matter preceding subparagraph (A), by striking
     ``the Settlement and parts I and III'' and inserting ``this
     part'';
       (ii) in subparagraph (A), by inserting ``and'' after the
     semicolon;
       (iii) in subparagraph (B)--

       (I) by striking ``additional amounts authorized to be
     appropriated, including the''; and
       (II) by striking ``; and'' and inserting a period; and

       (iv) by striking subparagraph (C); and
       (B) by striking paragraph (3); and
       (10) by adding at the end the following:
       ``(k) No Impacts on Other Interests.--
       ``(1) In general.--No Central Valley Project or other water
     (other than San Joaquin River water impounded by or bypassed
     from Friant Dam) shall be used to implement subsection (a)(2)
     unless the use is on a voluntary basis.
       ``(2) Involuntary costs.--No cost associated with the
     implementation of this section shall be imposed directly or
     indirectly on any Central Valley Project contractor, or any
     other person or entity, outside the Friant Division, the
     Hidden Unit, or the Buchanan Unit, unless the cost is
     incurred on a voluntary basis.
       ``(3) Reduction in water supplies.--The implementation of
     this part shall not directly or indirectly reduce any water
     supply or water reliability on any Central Valley Project
     contractor, any State Water Project contractor, or any other
     person or entity, outside the Friant Division, the Hidden
     Unit, or the Buchanan Unit, unless the reduction or cost is
     incurred on a voluntary basis.
       ``(l) Priority.--Each action taken under this part shall be
     subordinate to the use by the Secretary of Central Valley
     Project facilities to make Project water available to Project
     contractors, other than water released from the Friant Dam
     under this part.
       ``(m) Applicability.--
       ``(1) In general.--Notwithstanding section 8 of the Act of
     June 17, 1902 (32 Stat. 390, chapter 1093), except as
     provided in this part and subtitle D of the Sacramento and
     San Joaquin Valleys Water Reliability Act, this part--
       ``(A) preempts and supersedes any State law, regulation, or
     requirement that imposes more restrictive requirements or
     regulations on the activities authorized under this part; and
       ``(B) does not alter or modify any obligation of the Friant
     Division, Hidden Unit, and Buchanan Unit of the Central
     Valley Project, or other water users on the San Joaquin
     River, or tributaries of the San Joaquin River, under any
     order issued by the State Water Resources Control Board under
     the Porter-Cologne Water Quality Control Act (California
     Water Code section 13000 et seq.).
       ``(2) Applicability.--An order described in paragraph
     (1)(B) shall be consistent with any congressional
     authorization for any affected Federal facility relating to
     the Central Valley Project.
       ``(n) Project Implementation.--Any project to implement
     this part shall be phased such that each project shall
     include--
       ``(1) the project purpose and need;
       ``(2) identification of mitigation measures;
       ``(3) appropriate environmental review; and
       ``(4) prior to releasing Restoration Flows under this part
     the completion of the any required mitigation measures and
     the completion of the project.''.

[[Page S6645]]

     SEC. 735. DISPOSAL OF PROPERTY; TITLE TO FACILITIES.

       Section 10005 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1353) is
     amended--
       (1) in subsection (a), by striking ``the Settlement
     authorized by this part'' and inserting ``this part'';
       (2) in subsection (b)--
       (A) in paragraph (1)--
       (i) by striking ``(1) In general.--The Secretary'' and
     inserting ``The Secretary''; and
       (ii) by striking ``the Settlement authorized by this part''
     and inserting ``this part''; and
       (B) by striking paragraph (2); and
       (3) in subsection (c)--
       (A) in paragraph (1), by striking ``the Settlement'' and
     inserting ``this part'';
       (B) in paragraph (2)--
       (i) by striking ``through the exercise of its eminent
     domain authority''; and
       (ii) by striking ``the Settlement'' and inserting ``this
     part''; and
       (C) in paragraph (3), by striking ``section 10009(c)'' and
     inserting ``section 10009''.

     SEC. 736. COMPLIANCE WITH APPLICABLE LAW.

       Section 10006 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1354) is
     amended--
       (1) in subsection (a)--
       (A) in paragraph (1), by inserting ``, unless otherwise
     provided by this part'' before the period at the end; and
       (B) in paragraph (2), by striking ``the Settlement'' and
     inserting ``this part'';
       (2) in subsection (b), by inserting ``, unless otherwise
     provided by this part'' before the period at the end;
       (3) in subsection (c)--
       (A) in paragraph (2), by striking ``section 10004'' and
     inserting ``this part''; and
       (B) in paragraph (3), by striking ``the Settlement'' and
     inserting ``this part''; and
       (4) in subsection (d)--
       (A) by inserting ``, including, without limitation, the
     costs of implementing subsections (d) and (h)(4) of section
     10004,'' after ``implementing this part''; and
       (B) by striking ``for implementation of the Settlement,''.

     SEC. 737. COMPLIANCE WITH CENTRAL VALLEY PROJECT IMPROVEMENT
                   ACT.

       Section 10007 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1354) is
     amended--
       (1) in the matter preceding paragraph (1)--
       (A) by striking ``the Settlement'' and inserting ``the
     enactment of this part''; and
       (B) by inserting: ``and the obligations of the Secretary
     and all other parties to protect and keep in good condition
     any fish that may be planted or exist below Friant Dam,
     including any obligations under section 5937 of the
     California Fish and Game Code and the public trust doctrine,
     and those of the Secretary and all other parties under the
     Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.)''
     before ``, provided''; and
       (2) in paragraph (1), by striking ``, as provided in the
     Settlement''.

     SEC. 738. NO PRIVATE RIGHT OF ACTION.

       Section 10008(a) of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1355) is
     amended--
       (1) by striking ``not a party to the Settlement''; and
       (2) by striking ``or the Settlement'' and inserting
     ``unless otherwise provided by this part, but any Central
     Valley Project long-term water service or repayment
     contractor within the Friant Division, Hidden unit, or
     Buchanan unit adversely affected by the failure of the
     Secretary to comply with section 10004(a)(3) may bring an
     action against the Secretary for injunctive relief, damages,
     or both.''.

     SEC. 739. IMPLEMENTATION.

       Section 10009 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1355) is
     amended--
       (1) in the section heading, by striking ``; SETTLEMENT
     FUND'';
       (2) in subsection (a)--
       (A) in paragraph (1)--
       (i) by striking ``the Settlement'' the first place it
     appears and inserting ``this part'';
       (ii) by striking ``, estimated to total'' and all that
     follows through ``subsection (b)(1),''; and
       (iii) by striking ``; provided however,'' and all that
     follows through ``$110,000,000 of State funds'';
       (B) in paragraph (2)--
       (i) in subparagraph (A), by striking ``(A) In general.--The
     Secretary'' and inserting ``The Secretary''; and
       (ii) by striking subparagraph (B); and
       (C) in paragraph (3)--
       (i) by striking ``Except as provided in the Settlement,
     to'' and inserting ``To''; and
       (ii) by striking ``this Settlement'' and inserting ``this
     part'';
       (3) in subsection (b)(1)--
       (A) by striking ``In addition'' and all that follows
     through ``however, that the'' and inserting ``The'';
       (B) by striking ``such additional appropriations only in
     amounts equal to''; and
       (C) by striking ``or the Settlement'';
       (4) in subsection (c)--
       (A) in paragraph (1)--
       (i) in the matter preceding subparagraph (A), by striking
     ``the Settlement'' and inserting ``this part'';
       (ii) in subparagraph (C), by striking ``from the sale of
     water pursuant to the Settlement, or''; and
       (iii) in subparagraph (D), by striking ``the Settlement''
     and inserting ``this part'';
       (B) in paragraph (2), by striking ``the Settlement and'';
     and
       (5) by striking subsections (d) through (f).

     SEC. 740. REPAYMENT CONTRACTS AND ACCELERATION OF REPAYMENT
                   OF CONSTRUCTION COSTS.

       Section 10010 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1358) is
     amended--
       (1) in paragraphs (3)(D) and (4)(C) of subsection (a), by
     striking ``the Settlement and'' each place it appears;
       (2) in subsection (c), by striking paragraph (3);
       (3) in subsection (d)(1), by striking ``the Settlement''
     each place it appears and inserting ``this part'';
       (4) in subsection (e)--
       (A) in paragraph (1)--
       (i) by striking ``Interim Flows or Restoration Flows,
     pursuant to paragraphs 13 or 15 of the Settlement'' and
     inserting ``Restoration Flows, pursuant to this part'';
       (ii) by striking ``Interim Flows or'' before ``Restoration
     Flows''; and
       (iii) by striking ``the Interim Flows or Restoration Flows
     or is intended to otherwise facilitate the Water Management
     Goal, as described in the Settlement'' and inserting
     ``Restoration Flows''; and
       (B) in paragraph (2)--
       (i) by striking ``except as provided in paragraph 16(b) of
     the Settlement''; and
       (ii) by striking ``the Interim Flows or Restoration Flows
     or to facilitate the Water Management Goal'' and inserting
     ``Restoration Flows''.

     SEC. 741. REPEAL.

       Section 10011 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1362) is
     repealed.

     SEC. 742. WATER SUPPLY MITIGATION.

       Section 10202(b) of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1365) is
     amended--
       (1) in paragraph (1), by striking ``the Interim or
     Restoration Flows authorized in part I of this subtitle'' and
     inserting ``Restoration Flows authorized in this part'';
       (2) in paragraph (2), by striking ``the Interim or
     Restoration Flows authorized in part I of this subtitle'' and
     inserting ``Restoration Flows authorized in this part''; and
       (3) in paragraph (3)--
       (A) in subparagraph (A), by striking ``meet the Restoration
     Goal as described in part I of this subtitle'' and inserting
     ``recover Restoration Flows as described in this part'';
       (B) in subparagraph (C)--
       (i) by striking ``the Interim or Restoration Flows
     authorized in part I of this subtitle'' and inserting
     ``Restoration Flows authorized in this part''; and
       (ii) by striking ``, and for ensuring appropriate
     adjustment in the recovered water account pursuant to section
     10004(a)(5)''.

     SEC. 743. ADDITIONAL AUTHORITIES.

       Section 10203 of the San Joaquin River Restoration
     Settlement Act (Public Law 111-11; 123 Stat. 1367) is
     amended--
       (1) in subsection (b)--
       (A) by striking ``section 10004(a)(4)'' and inserting
     ``section 10004(a)(3)''; and
       (B) by striking ``, provided'' and all that follows through
     ``section 10009(f)(2)''; and
       (2) by striking subsection (c).

   Subtitle C--Repayment Contracts and Acceleration of Repayment of
                           Construction Costs

     SEC. 751. REPAYMENT CONTRACTS AND ACCELERATION OF REPAYMENT
                   OF CONSTRUCTION COSTS.

       (a) Conversion of Contracts.--
       (1) Certain contracts.--
       (A) In general.--Not later than 1 year after the date
     enactment of this Act, the Secretary of the Interior, on the
     request of a contractor, shall convert all existing long-term
     Central Valley Project contracts entered into under section
     9(e) of the Act of August 4, 1939 (53 Stat. 1196, chapter
     418), to a contract under section 9(d) of that Act (53 Stat.
     1195), under mutually agreeable terms and conditions.
       (B) Restrictions.--A contract converted under subparagraph
     (A) shall--
       (i) require the repayment, either in lump sum or by
     accelerated prepayment, of the remaining amount of
     construction costs identified in the most current version of
     the Central Valley Project Schedule of Irrigation Capital
     Allocations by Contractor, as adjusted to reflect payments
     not reflected in that schedule and properly assignable for
     ultimate return by the contractor, not later than January 31,
     2013 (or if made in approximately equal annual installments,
     not later than January 31, 2016), which amount shall be
     discounted by the Treasury rate (defined as the 20-year
     Constant Maturity Treasury rate published by the Department
     of the Treasury as of October 1, 2012);
       (ii) require that, notwithstanding subsection (c)(2),
     construction costs or other capitalized costs incurred after
     the effective date of the converted contract or not reflected
     in the schedule described in clause (i) and properly
     assignable to that contractor, shall be repaid--

       (I) in not more than 5 years after the date on which the
     contractor is notified of the allocation if that amount is a
     result of a collective annual allocation of capital costs to
     the contractors exercising contract conversions under this
     subsection of less than $5,000,000; or
       (II) if the allocation of capital costs described in
     subclause (I) equal $5,000,000 or more, as provided by
     applicable reclamation law, subject to the condition that the
     reference to the amount of $5,000,000 shall not be a
     precedent in any other context; and

[[Page S6646]]

       (iii) provide that power revenues will not be available to
     aid in the repayment of construction costs allocated to
     irrigation under the contract.
       (C) Estimate.--Not later than 180 days after the date of
     enactment of this Act, the Secretary of the Interior shall
     provide to each contractor an estimate of the remaining
     amount of construction costs under subparagraph (B)(i) as of
     January 31, 2013, as adjusted.
       (2) Other contracts.--
       (A) In general.--Not later than 1 year after the date of
     enactment of this Act, on the request of a contractor, the
     Secretary may convert any Central Valley Project long-term
     contract entered into under section 9(c)(2) of the Act of
     August 4, 1939 (chapter 418; 53 Stat. 1194) to a contract
     under section 9(c)(1) of that Act, under mutually agreeable
     terms and conditions.
       (B) Restrictions.--A contract converted under subparagraph
     (A) shall--
       (i) require the repayment in lump sum of the remaining
     amount of construction costs identified in the most current
     version of the Central Valley Project Schedule of Municipal
     and Industrial Water Rates, as adjusted to reflect payments
     not reflected in that schedule and properly assignable for
     ultimate return by the contractor, not later than January 31,
     2016; and
       (ii) require that, notwithstanding subsection (c)(2),
     construction costs or other capitalized costs incurred after
     the effective date of the contract or not reflected in the
     Schedule described in clause (i), and properly assignable to
     that contractor, shall be repaid--

       (I) in not more than 5 years after the date on which the
     contractor is notified of the allocation if the amount is a
     result of a collective annual allocation of capital costs to
     the contractors exercising contract conversions under this
     subsection of less than $5,000,000; or
       (II) if the allocation of capital costs described in
     subclause (I) equal $5,000,000 or more, as provided by
     applicable reclamation law, subject to the condition that the
     reference to the amount of $5,000,000 shall not be a
     precedent in any other context.

       (C) Estimate.--Not later than 180 days after the date of
     enactment of this Act, the Secretary of the Interior shall
     provide to each contractor an estimate of the remaining
     amount of construction costs under subparagraph (B)(i) as of
     January 31, 2016, as adjusted.
       (b) Final Adjustment.--
       (1) In general.--The amounts paid pursuant to subsection
     (a) shall be subject to adjustment following a final cost
     allocation by the Secretary of the Interior on completion of
     the construction of the Central Valley Project.
       (2) Repayment obligation.--
       (A) In general.--If the final cost allocation indicates
     that the costs properly assignable to the contractor are
     greater than the amount that has been paid by the contractor,
     the contractor shall pay the remaining allocated costs.
       (B) Terms.--The term of an additional repayment contract
     described in subparagraph (A) shall be--
       (i) for not less than 1 year and not more than 10 years;
     and
       (ii) based on mutually agreeable provisions regarding the
     rate of repayment of the amount developed by the parties.
       (3) Credits.--If the final cost allocation indicates that
     the costs properly assignable to the contractor are less than
     the amount that the contractor has paid, the Secretary of the
     Interior shall credit the amount of the overpayment as an
     offset against any outstanding or future obligation of the
     contractor.
       (c) Applicability of Certain Provisions.--
       (1) In general.--Notwithstanding any repayment obligation
     under subsection (a)(1)(B)(ii) or subsection (b), on the
     compliance of a contractor with and discharge of the
     obligation of repayment of the construction costs under that
     subsection, the ownership and full-cost pricing limitations
     of any provision of the reclamation laws shall not apply to
     land in that district.
       (2) Other contracts.--Notwithstanding any repayment
     obligation under paragraph (1)(B)(ii) or (2)(B)(ii) of
     subsection (a) or subsection (b), on the compliance of a
     contractor with and discharge of the obligation of repayment
     of the construction costs under that subsection, the
     contractor shall continue to pay applicable operation and
     maintenance costs and other charges applicable to the
     repayment contracts pursuant to then-current rate-setting
     policy and applicable law.
       (d) Certain Repayment Obligations Not Altered.--This
     section does not--
       (1) alter the repayment obligation of any other long-term
     water service or repayment contractor receiving water from
     the Central Valley Project; or
       (2) shift any costs that would otherwise have been properly
     assignable to a contractor absent this section, including
     operations and maintenance costs, construction costs, or
     other capitalized costs incurred after the date of enactment
     of this Act, to other contractors.
       (e) Statutory Interpretation.--Nothing in this subtitle
     affects the right of any long-term contractor to use a
     particular type of financing to make the payments required in
     paragraph (1)(B)(i) or (2)(B)(i) of subsection (a).

     Subtitle D--Bay-Delta Watershed Water Rights Preservation and
                               Protection

     SEC. 761. WATER RIGHTS AND AREA-OF-ORIGIN PROTECTIONS.

       Notwithstanding the provisions of this title, Federal
     reclamation law, or the Endangered Species Act of 1973 (16
     U.S.C. 1531 et seq.)--
       (1) the Secretary of the Interior shall, in the operation
     of the Central Valley Project--
       (A) strictly adhere to State water rights law governing
     water rights priorities by honoring water rights senior to
     those belonging to the Central Valley Project, regardless of
     the source of priority; and
       (B) strictly adhere to and honor water rights and other
     priorities that are obtained or exist pursuant to the
     California Water Code, including sections 10505, 10505:5,
     11128, 11460, 11463, and 12220; and
       (2) any action that affects the diversion of water or
     involves the release of water from any Central Valley Project
     water storage facility taken by the Secretary of the Interior
     or the Secretary of Commerce to conserve, enhance, recover,
     or otherwise protect any species listed under the Endangered
     Species Act of 1973 (16 U.S.C. 1531 et seq.) shall be applied
     in a manner that is consistent with water right priorities
     established by State law.

     SEC. 762. SACRAMENTO RIVER SETTLEMENT CONTRACTS.

       (a) In General.--In carrying out the Endangered Species Act
     of 1973 (16 U.S.C. 1531 et seq.) in the Bay-Delta and on the
     Sacramento River, the Secretary of the Interior and the
     Secretary of Commerce shall apply any limitations on the
     operation of the Central Valley Project or relating to the
     formulation of any reasonable prudent alternative associated
     with the operation of the Central Valley Project in a manner
     that strictly adheres to and applies the water rights
     priorities for project water and base supply as provided in
     the Sacramento River Settlement Contracts.
       (b) Applicability.--Article 3(i) of the Sacramento River
     Settlement Contracts shall not be used by the Secretary of
     the Interior or any other Federal agency head as means to
     provide shortages that are different from those provided for
     in Article 5(a) of the Sacramento River Settlement Contracts.

     SEC. 763. SACRAMENTO RIVER WATERSHED WATER SERVICE
                   CONTRACTORS.

       (a) Existing Central Valley Project Agricultural Water
     Service Contractors Within Sacramento River Watershed.--In
     this section, the term ``existing Central Valley Project
     agricultural water service contractors within the Sacramento
     River Watershed'' means water service contractors within the
     Shasta, Trinity, and Sacramento River Divisions of the
     Central Valley Project that have a water service contract in
     effect on the date of enactment of this Act that provides
     water for irrigation.
       (b) Allocation of Water.--Subject to subsection (c) and the
     absolute priority of the Sacramento River Settlement
     Contractors to Sacramento River supplies over Central Valley
     Project diversions and deliveries to other contractors, the
     Secretary of the Interior shall, in the operation of the
     Central Valley Project, allocate water provided for
     irrigation purposes to existing Central Valley Project
     agricultural water service contractors within the Sacramento
     River Watershed as follows:
       (1) Not less than 100 percent of the contract quantities in
     a ``Wet'' year (as that term is defined in the Sacramento
     Valley Water Year Type (40-30-30) Index).
       (2) Not less than 100 percent of the contract quantities in
     an ``Above Normal'' year (as that term is defined in the
     Sacramento Valley Water Year Type (40-30-30) Index).
       (3) Not less than 100 percent of the contract quantities in
     a ``Below Normal'' year (as that term is defined in the
     Sacramento Valley Water Year Type (40-30-30) Index).
       (4) Not less than 75 percent of the contract quantities in
     a ``Dry'' year (as that term is defined in the Sacramento
     Valley Water Year Type (40-30-30) Index).
       (5) Not less than 50 percent of the contract quantities in
     a ``Critically Dry'' year (as that term is defined in the
     Sacramento Valley Water Year Type (40-30-30) Index).
       (c) Protection of Municipal and Industrial Supplies.--
       (1) In general.--Nothing in this section--
       (A) modifies any provision of a water service contract that
     addresses municipal and industrial water shortage policies of
     the Secretary of the Interior;
       (B) affects or limits the authority of the Secretary of the
     Interior--
       (i) to adopt or modify municipal and industrial water
     shortage policies; or
       (ii) to implement municipal and industrial water shortage
     policies; or
       (C) affects allocations to Central Valley Project municipal
     and industrial contractors pursuant to the water shortage
     policies of the Secretary of the Interior.
       (2) Applicability.--This section does not constrain,
     govern, or affect, directly or indirectly, the operations of
     the American River Division of the Central Valley Project or
     any deliveries from that Division, including the units and
     facilities of that Division.

     SEC. 764. NO REDIRECTED ADVERSE IMPACTS.

       The Secretary of the Interior shall ensure that there are
     no redirected adverse water supply or fiscal impacts to the
     State Water Project or to individuals within the Sacramento
     River or San Joaquin River watershed arising from the
     operation of the Secretary of the Central Valley Project to
     meet

[[Page S6647]]

     legal obligations imposed by or through any Federal or State
     agency, including--
       (1) the Endangered Species Act of 1973 (16 U.S.C. 1531 et
     seq.);
       (2) this title; and
       (3) actions or activities implemented to meet the twin
     goals of improving water supply and addressing the
     environmental needs of the Bay-Delta.

                       Subtitle E--Miscellaneous

     SEC. 771. PRECEDENT.

       Congress finds that--
       (1) coordinated operations between the Central Valley
     Project and the State Water Project, as consented to and
     requested by the State of California and the Federal
     Government, require the assertion of Federal supremacy to
     protect existing water rights throughout the system, a
     circumstance that is unique to the State of California; and
       (2) this title should not serve as precedent for similar
     operations in any other State.

                TITLE VIII--REDUCING REGULATORY BURDENS

     SEC. 801. SHORT TITLE.

       This title may be cited as the ``Reducing Regulatory
     Burdens Act of 2012''.

     SEC. 802. USE OF AUTHORIZED PESTICIDES.

       Section 3(f) of the Federal Insecticide, Fungicide, and
     Rodenticide Act (7 U.S.C. 136a(f)) is amended by adding at
     the end the following:
       ``(5) Use of authorized pesticides.--Except as provided in
     section 402(s) of the Federal Water Pollution Control Act (33
     U.S.C. 1342(s)), the Administrator or a State may not require
     a permit under that Act for a discharge from a point source
     into navigable waters of a pesticide authorized for sale,
     distribution, or use under this Act, or the residue of the
     pesticide, resulting from the application of the
     pesticide.''.

     SEC. 803. DISCHARGES OF PESTICIDES.

       Section 402 of the Federal Water Pollution Control Act (33
     U.S.C. 1342) is amended by adding at the end the following:
       ``(s) Discharges of Pesticides.--
       ``(1) No permit requirement.--Except as provided in
     paragraph (2), a permit shall not be required by the
     Administrator or a State under this Act for a discharge from
     a point source into navigable waters of a pesticide
     authorized for sale, distribution, or use under the Federal
     Insecticide, Fungicide, and Rodenticide Act (7 U.S.C. 136 et
     seq.), or the residue of the pesticide, resulting from the
     application of the pesticide.
       ``(2) Exceptions.--Paragraph (1) shall not apply to the
     following discharges of a pesticide or pesticide residue:
       ``(A) A discharge resulting from the application of a
     pesticide in violation of a provision of the Federal
     Insecticide, Fungicide, and Rodenticide Act (7 U.S.C. 136 et
     seq.) that is relevant to protecting water quality, if--
       ``(i) the discharge would not have occurred but for the
     violation; or
       ``(ii) the quantity of a pesticide or pesticide residue in
     the discharge is greater than would have occurred without the
     violation.
       ``(B) Stormwater discharges subject to regulation under
     subsection (p).
       ``(C) The following discharges subject to regulation under
     this section:
       ``(i) Manufacturing or industrial effluent.
       ``(ii) Treatment works effluent.
       ``(iii) Discharges incidental to the normal operation of a
     vessel, including a discharge resulting from ballasting
     operations or vessel biofouling prevention.''.

               TITLE IX--FARM DUST REGULATION PREVENTION

     SEC. 901. SHORT TITLE.

       This title may be cited as the ``Farm Dust Regulation
     Prevention Act of 2012''.

     SEC. 902. TEMPORARY PROHIBITION AGAINST REVISING ANY NATIONAL
                   AMBIENT AIR QUALITY STANDARD APPLICABLE TO
                   COARSE PARTICULATE MATTER.

       Before the date that is 1 year after the date of enactment
     of this Act, the Administrator of the Environmental
     Protection Agency (referred to in this title as the
     ``Administrator'') may not propose, finalize, implement, or
     enforce any regulation revising the national primary ambient
     air quality standard or the national secondary ambient air
     quality standard applicable to particulate matter with an
     aerodynamic diameter greater than 2.5 micrometers under
     section 109 of the Clean Air Act (42 U.S.C. 7409).

     SEC. 903. NUISANCE DUST.

       Part A of title I of the Clean Air Act (42 U.S.C. 7401 et
     seq.) is amended by adding at the end the following:

     ``SEC. 132. REGULATION OF NUISANCE DUST PRIMARILY BY STATE,
                   TRIBAL, AND LOCAL GOVERNMENTS.

       ``(a) Definition of Nuisance Dust.--In this section:
       ``(1) In general.--The term `nuisance dust' means
     particulate matter that--
       ``(A) is generated primarily from natural sources, unpaved
     roads, agricultural activities, earth moving, or other
     activities typically conducted in rural areas;
       ``(B) consists primarily of soil, other natural or
     biological materials, or some combination of those materials;
       ``(C) is not emitted directly into the ambient air from
     combustion, such as exhaust from combustion engines and
     emissions from stationary combustion processes; and
       ``(D) is not comprised of residuals from the combustion of
     coal.
       ``(2) Exclusion.--The term `nuisance dust' does not include
     radioactive particulate matter produced from uranium mining
     or processing.
       ``(b) Applicability.--Except as provided in subsection (c),
     this Act does not apply to, and references in this Act to
     particulate matter are deemed to exclude, nuisance dust.
       ``(c) Exception.--Subsection (a) does not apply with
     respect to any geographical area in which nuisance dust is
     not regulated under State, tribal, or local law insofar as
     the Administrator, in consultation with the Secretary of
     Agriculture, finds that--
       ``(1) nuisance dust (or any subcategory of nuisance dust)
     causes substantial adverse public health and welfare effects
     at ambient concentrations; and
       ``(2) the benefits of applying standards and other
     requirements of this Act to nuisance dust (or a subcategory
     of nuisance dust) outweigh the costs (including local and
     regional economic and employment impacts) of applying those
     standards and other requirements to nuisance dust (or a
     subcategory).''.

     SEC. 904. SENSE OF CONGRESS.

       It is the sense of Congress that the Administrator should
     implement an approach to excluding so-called ``exceptional
     events'', or events that are not reasonably controllable or
     preventable, from determinations of whether an area is in
     compliance with any national ambient air quality standard
     applicable to coarse particulate matter that--
       (1) maximizes transparency and predictability for States,
     Indian tribes, and local governments; and
       (2) minimizes the regulatory and cost burdens States,
     Indian tribes, and local governments bear in excluding those
     events.

     SEC. 905. IMPACTS OF EPA REGULATORY ACTIVITY ON EMPLOYMENT
                   AND ECONOMIC ACTIVITY IN AGRICULTURE COMMUNITY.

       (a) Definitions.--In this section:
       (1) Covered action.--The term ``covered action'' means any
     of the following actions taken by the Administrator under the
     Clean Air Act (42 U.S.C. 7401 et seq.) relating to
     agriculture and the national primary ambient air quality
     standard or the national secondary ambient air quality
     standard for particulate matter:
       (A) Promulgating or issuing a regulation, policy statement,
     guidance, response to a petition, or other requirement.
       (B) Implementing a new or substantially altered program.
       (2) More than a de minimis negative impact.--The term
     ``more than a de minimis negative impact'' means--
       (A) with respect to employment levels, a loss of more than
     100 jobs relating to the agriculture industry, as calculated
     by excluding consideration of any offsetting job gains that
     result from the hypothetical creation of new jobs through new
     technologies or government employment; and
       (B) with respect to economic activity, a decrease in
     agricultural economic activity of more than $1,000,000 over
     any calendar year, as calculated by excluding consideration
     of any offsetting economic activity that results from the
     hypothetical creation of new economic activity through new
     technologies or government employment.
       (b) Analysis of Impacts of Actions on Employment and
     Economic Activity in the Agriculture Community.--
       (1) Analysis.--Before taking a covered action, the
     Administrator shall analyze the impact, disaggregated by
     State, of the covered action on--
       (A) employment levels in the agriculture industry; and
       (B) agricultural economic activity, including estimated job
     losses and decreased economic activity relating to
     agriculture.
       (2) Economic models.--
       (A) In general.--In carrying out paragraph (1), the
     Administrator shall use the best available economic models.
       (B) Annual gao report.--Not later than December 31 of each
     year, the Comptroller General of the United States shall
     submit to Congress a report on the economic models used by
     the Administrator to carry out this subsection.
       (3) Availability of information.--With respect to any
     covered action, the Administrator shall--
       (A) post the analysis under paragraph (1) as a link on the
     main page of the public Internet website of the Environmental
     Protection Agency;
       (B) request the Secretary of Agriculture to post the
     analysis under paragraph (1) as a link on the main page of
     the public Internet website of the Department of Agriculture;
     and
       (C) request that the Governor of any State experiencing
     more than a de minimis negative impact post the analysis on
     the main page of the public Interest website of the State.
       (c) Public Hearings.--
       (1) In general.--If the Administrator concludes under
     subsection (a)(1) that a covered action will have more than a
     de minimis negative impact on agricultural employment levels
     or agricultural economic activity in a State, the
     Administrator shall hold a public hearing in each such State
     at least 30 days before the effective date of the covered
     action.
       (2) Time, location, and selection.--A public hearing
     required under paragraph (1) shall be held at--
       (A) a convenient time and location for impacted residents;
     and
       (B) at such location selected by the Administrator as shall
     give priority to locations in the State that will experience
     the greatest number of job losses.

[[Page S6648]]

       (d) Notification.--If the Administrator concludes under
     subsection (b)(1) that a covered action will have more than a
     de minimis negative impact on agricultural employment levels
     or agricultural economic activity in any State, the
     Administrator shall give notice of the impact to the
     congressional delegation, Governor, and legislature of the
     State at least 45 days before the effective date of the
     covered action.

                     TITLE X--ENERGY TAX PREVENTION

     SEC. 1001. SHORT TITLE.

       This title may be cited as the ``Energy Tax Prevention Act
     of 2012''.

     SEC. 1002. NO REGULATION OF EMISSIONS OF GREENHOUSE GASES.

       Title III of the Clean Air Act (42 U.S.C. 7601 et seq.) is
     amended by adding at the end the following:

     ``SEC. 330. NO REGULATION OF EMISSIONS OF GREENHOUSE GASES.

       ``(a) Definition.--In this section, the term `greenhouse
     gas' means any of the following:
       ``(1) Water vapor.
       ``(2) Carbon dioxide.
       ``(3) Methane.
       ``(4) Nitrous oxide.
       ``(5) Sulfur hexafluoride.
       ``(6) Hydrofluorocarbons.
       ``(7) Perfluorocarbons.
       ``(8) Any other substance subject to, or proposed to be
     subject to, regulation, action, or consideration under this
     Act to address climate change.
       ``(b) Limitation on Agency Action.--
       ``(1) Limitation.--
       ``(A) In general.--The Administrator may not, under this
     Act, promulgate any regulation concerning, take action
     relating to, or take into consideration the emission of a
     greenhouse gas to address climate change.
       ``(B) Air pollutant definition.--The definition of the term
     `air pollutant' in section 302(g) does not include a
     greenhouse gas. Notwithstanding the previous sentence, such
     definition may include a greenhouse gas for purposes of
     addressing concerns other than climate change.
       ``(2) Exceptions.--Paragraph (1) does not prohibit the
     following:
       ``(A) Notwithstanding paragraph (4)(B), implementation and
     enforcement of the rule entitled `Light-Duty Vehicle
     Greenhouse Gas Emission Standards and Corporate Average Fuel
     Economy Standards' (75 Fed. Reg. 25324 (May 7, 2010) and
     without further revision) and finalization, implementation,
     enforcement, and revision of the proposed rule entitled
     `Greenhouse Gas Emissions Standards and Fuel Efficiency
     Standards for Medium- and Heavy-Duty Engines and Vehicles'
     published at 75 Fed. Reg. 74152 (November 30, 2010).
       ``(B) Implementation and enforcement of section 211(o).
       ``(C) Statutorily authorized Federal research, development,
     and demonstration programs addressing climate change.
       ``(D) Implementation and enforcement of title VI to the
     extent such implementation or enforcement only involves one
     or more class I or class II substances (as such terms are
     defined in section 601).
       ``(E) Implementation and enforcement of section 821 (42
     U.S.C. 7651k note) of Public Law 101-549 (commonly referred
     to as the `Clean Air Act Amendments of 1990').
       ``(3) Inapplicability of provisions.--Nothing listed in
     paragraph (2) shall cause a greenhouse gas to be subject to
     part C of title I (relating to prevention of significant
     deterioration of air quality) or considered an air pollutant
     for purposes of title V (relating to air permits).
       ``(4) Certain prior agency actions.--The following rules,
     and actions (including any supplement or revision to such
     rules and actions) are repealed and shall have no legal
     effect:
       ``(A) `Mandatory Reporting of Greenhouse Gases', published
     at 74 Fed. Reg. 56260 (October 30, 2009).
       ``(B) `Endangerment and Cause or Contribute Findings for
     Greenhouse Gases under section 202(a) of the Clean Air Act'
     published at 74 Fed. Reg. 66496 (Dec. 15, 2009).
       ``(C) `Reconsideration of the Interpretation of Regulations
     That Determine Pollutants Covered by Clean Air Act Permitting
     Programs' published at 75 Fed. Reg. 17004 (April 2, 2010) and
     the memorandum from Stephen L. Johnson, Environmental
     Protection Agency (EPA) Administrator, to EPA Regional
     Administrators, concerning `EPA's Interpretation of
     Regulations that Determine Pollutants Covered by Federal
     Prevention of Significant Deterioration (PSD) Permit Program'
     (Dec. 18, 2008).
       ``(D) `Prevention of Significant Deterioration and Title V
     Greenhouse Gas Tailoring Rule', published at 75 Fed. Reg.
     31514 (June 3, 2010).
       ``(E) `Action To Ensure Authority To Issue Permits Under
     the Prevention of Significant Deterioration Program to
     Sources of Greenhouse Gas Emissions: Finding of Substantial
     Inadequacy and SIP Call', published at 75 Fed. Reg. 77698
     (December 13, 2010).
       ``(F) `Action To Ensure Authority To Issue Permits Under
     the Prevention of Significant Deterioration Program to
     Sources of Greenhouse Gas Emissions: Finding of Failure to
     Submit State Implementation Plan Revisions Required for
     Greenhouse Gases', published at 75 Fed. Reg. 81874 (December
     29, 2010).
       ``(G) `Action To Ensure Authority To Issue Permits Under
     the Prevention of Significant Deterioration Program to
     Sources of Greenhouse Gas Emissions: Federal Implementation
     Plan', published at 75 Fed. Reg. 82246 (December 30, 2010).
       ``(H) `Action To Ensure Authority To Implement Title V
     Permitting Programs Under the Greenhouse Gas Tailoring Rule',
     published at 75 Fed. Reg. 82254 (December 30, 2010).
       ``(I) `Determinations Concerning Need for Error Correction,
     Partial Approval and Partial Disapproval, and Federal
     Implementation Plan Regarding Texas Prevention of Significant
     Deterioration Program', published at 75 Fed. Reg. 82430
     (December 30, 2010).
       ``(J) `Limitation of Approval of Prevention of Significant
     Deterioration Provisions Concerning Greenhouse Gas Emitting-
     Sources in State Implementation Plans; Final Rule', published
     at 75 Fed. Reg. 82536 (December 30, 2010).
       ``(K) `Determinations Concerning Need for Error Correction,
     Partial Approval and Partial Disapproval, and Federal
     Implementation Plan Regarding Texas Prevention of Significant
     Deterioration Program; Proposed Rule', published at 75 Fed.
     Reg. 82365 (December 30, 2010).
       ``(L) Except for action listed in paragraph (2), any other
     Federal action under this Act occurring before the date of
     enactment of this section that applies a stationary source
     permitting requirement or an emissions standard for a
     greenhouse gas to address climate change.
       ``(5) State action.--
       ``(A) No limitation.--This section does not limit or
     otherwise affect the authority of a State to adopt, amend,
     enforce, or repeal State laws and regulations pertaining to
     the emission of a greenhouse gas.
       ``(B) Exception.--
       ``(i) Rule.--Notwithstanding subparagraph (A), any
     provision described in clause (ii)--

       ``(I) is not federally enforceable;
       ``(II) is not deemed to be a part of Federal law; and
       ``(III) is deemed to be stricken from the plan described in
     clause (ii)(I) or the program or permit described in clause
     (ii)(II), as applicable.

       ``(ii) Provisions defined.--For purposes of clause (i), the
     term `provision' means any provision that--

       ``(I) is contained in a State implementation plan under
     section 110 and authorizes or requires a limitation on, or
     imposes a permit requirement for, the emission of a
     greenhouse gas to address climate change; or
       ``(II) is part of an operating permit program under title
     V, or a permit issued pursuant to title V, and authorizes or
     requires a limitation on the emission of a greenhouse gas to
     address climate change.

       ``(C) Action by administrator.--The Administrator may not
     approve or make federally enforceable any provision described
     in subparagraph (B)(ii).''.

     SEC. 1003. PRESERVING ONE NATIONAL STANDARD FOR AUTOMOBILES.

       Section 209(b) of the Clean Air Act (42 U.S.C. 7543) is
     amended by adding at the end the following:
       ``(4) With respect to standards for emissions of greenhouse
     gases (as defined in section 330) for model year 2017 or any
     subsequent model year for new motor vehicles and new motor
     vehicle engines--
       ``(A) the Administrator may not waive application of
     subsection (a); and
       ``(B) no waiver granted prior to the date of enactment of
     this paragraph may be considered to waive the application of
     subsection (a).''.
                                 ______

Legislative Activity

Stay on top of the latest movement without scrolling through every action

Floor Latest Action

Senate amendment submitted

September 21, 2012