S.Amdt. 783Senate112th Congress (2011-2013)

To include the statutorily required PAYGO language.

Submitted October 17, 2011

This amendment's own text couldn't be picked out of its Congressional Record passage, so the passage is shown in full.

PIPELINE TRANSPORTATION SAFETY IMPROVEMENT ACT OF 2011

  Mr. REID. Mr. President, I ask unanimous consent that the Senate
proceed to Calendar No. 96.
  The PRESIDING OFFICER. The clerk will report.
  The assistant legislative clerk read as follows:

       A bill (S. 275) to amend title 49, United States Code, to
     provide for enhanced safety and environmental protection in
     pipeline transportation, to provide for enhanced reliability
     in the transportation of the Nation's energy products by
     pipeline, and for other purposes.

  There being no objection, the Senate proceeded to consider the bill
which had been reported from the Committee on Commerce, Science, and
Transportation, with an amendment to strike all after the enacting
clause and insert in lieu thereof the following:

     SECTION 1. SHORT TITLE; AMENDMENT OF TITLE 49, UNITED STATES
                   CODE; TABLE OF CONTENTS.

       (a) Short Title.--This Act may be cited as the ``Pipeline
     Transportation Safety Improvement Act of 2011''.
       (b) Amendment of Title 49, United States Code.--Except as
     otherwise expressly provided, whenever in this Act an
     amendment or repeal is expressed in terms of an amendment to,
     or a repeal of, a section or other provision, the reference
     shall be considered to be made to a section or other
     provision of title 49, United States Code.
       (c) Table of Contents.--The table of contents for this Act
     is as follows:

Sec. 1. Short title; amendment of title 49, United States Code; table
              of contents.
Sec. 2. Civil penalties.
Sec. 3. Pipeline damage prevention.
Sec. 4. Offshore gathering pipelines.
Sec. 5. Automatic and remote-controlled shut-off valves.
Sec. 6. Excess flow valves.
Sec. 7. Integrity management.
Sec. 8. Public education and awareness.
Sec. 9. Cast iron gas pipelines.
Sec. 10. Leak detection.
Sec. 11. Incident notification.
Sec. 12. Transportation-related onshore facility response plan
              compliance.
Sec. 13. Pipeline infrastructure data collection.
Sec. 14. International cooperation and consultation.
Sec. 15. Gas and hazardous liquid gathering lines.
Sec. 16. Transportation-related oil flow lines.
Sec. 17. Alaska project coordination.
Sec. 18. Cost recovery for design reviews.
Sec. 19. Special permits.
Sec. 20. Biofuel pipelines.
Sec. 21. Carbon dioxide pipelines.
Sec. 22. Study of the transportation of tar sands crude oil.
Sec. 23. Study of non-petroleum hazardous liquids transported by
              pipeline.
Sec. 24. Clarifications.
Sec. 25. Additional resources.
Sec. 26. Maintenance of effort.
Sec. 27. Maximum allowable operating pressure.
Sec. 28. Administrative enforcement process.
Sec. 29. Authorization of appropriations.

     SEC. 2. CIVIL PENALTIES.

       (a) Penalty Considerations; Major Consequence Violations.--
     Section 60122 is amended--
       (1) by striking ``the ability to pay,'' in subsection
     (b)(1)(B);
       (2) by redesignating subsections (c) through (f) as
     subsections (d) through (g), respectively; and
       (3) by inserting after subsection (b) the following:
       ``(c) Penalties for Major Consequence Violations.--
       ``(1) In general.--A person that the Secretary of
     Transportation decides, after written notice and an
     opportunity for a hearing, has committed a major consequence
     violation of section 60114(b), 60114(d), or 60118(a) of this
     title or a regulation prescribed or order issued under this
     chapter is liable to the United States Government for a civil
     penalty of not more than $250,000 for each violation. A
     separate violation occurs for each day the violation
     continues. The maximum civil penalty under this paragraph for
     a related series of major consequence violations is
     $2,500,000.
       ``(2) Penalty considerations.--In determining the amount of
     a civil penalty for a major consequence violation under this
     subsection, the Secretary shall consider the factors
     prescribed in subsection (b).
       ``(3) Major consequence violation defined.--In this
     subsection, the term `major consequence violation' means a
     violation that contributed to an incident resulting in--
       ``(A) 1 or more deaths;
       ``(B) 1 or more injuries or illnesses requiring in-patient
     hospitalization; or
       ``(C) environmental harm exceeding $250,000 in estimated
     damage to the environment including property loss other than
     the value of natural gas or hazardous liquid lost, or damage
     to pipeline equipment.''.
       (b) Penalty for Obstruction of Inspections and
     Investigations.--Section 60118(e) is amended by adding at the
     end the following: ``The Secretary may impose a civil penalty
     under section 60122 of this title on a person who obstructs
     or prevents the Secretary from carrying out inspections or
     investigations under this chapter.''.
       (c) Administrative Penalty Caps Inapplicable.--Section
     60120(a)(1) is amended by adding at the end the following:
     ``The maximum amount of civil penalties for administrative
     enforcement actions under section 60122 of this title shall
     not apply to enforcement actions under this section.''.
       (d) Judicial Review of Administrative Enforcement Orders.--
     Section 60119(a) is amended--
       (1) by striking the subsection caption and inserting ``(a)
     Review of Regulations, Orders, and Other Final Agency
     Actions.--''; and
       (2) by striking ``about an application for a waiver under
     section 60118(c) or (d) of'' and inserting ``under''.

     SEC. 3. PIPELINE DAMAGE PREVENTION.

       (a) Minimum Standards for State One-call Notification
     Programs.--Section 6103(a) is amended to read as follows:
       ``(a) Minimum Standards.--
       ``(1) In general.--In order to qualify for a grant under
     section 6106, a State one-call notification program shall, at
     a minimum, provide for--
       ``(A) appropriate participation by all underground facility
     operators, including all government operators;
       ``(B) appropriate participation by all excavators,
     including all government and contract excavators; and
       ``(C) flexible and effective enforcement under State law
     with respect to participation in, and use of, one-call
     notification systems.
       ``(2) Exemptions prohibited.--A State one-call notification
     program may not exempt municipalities, State agencies, or
     their contractors from its one-call notification system
     requirements.''.
       (b) State Damage Prevention Programs.--Section 60134(a) is
     amended--
       (1) by striking ``and'' after the semicolon in paragraph
     (1);
       (2) by striking ``(b).'' in paragraph (2) and inserting
     ``(b); and''; and
       (3) by adding at the end the following:
       ``(3) does not provide any exemptions to municipalities,
     State agencies, or their contractors from its one-call
     notification system requirements.''.
       (c) Effective Date.--The amendments made by this section
     shall take effect 2 years after the date of enactment of this
     Act.

     SEC. 4. OFFSHORE GATHERING PIPELINES.

       Section 60102(k)(1) is amended by striking the last
     sentence and inserting ``Not later than 1 year after the date
     of enactment of the Pipeline Transportation Safety
     Improvement Act of 2011, the Secretary shall issue
     regulations, after notice and an opportunity for a hearing,
     subjecting offshore hazardous liquid gathering pipelines and
     hazardous liquid gathering pipelines located within the
     inlets of the Gulf of Mexico to the same standards and
     regulations as other hazardous liquid gathering pipelines.
     The regulations issued under this paragraph shall not apply
     to low-stress distribution pipelines.''.

     SEC. 5. AUTOMATIC AND REMOTE-CONTROLLED SHUT-OFF VALVES.

       Section 60102 is amended by adding at the end the
     following:
       ``(n) Automatic and Remote-controlled Shut-off Valves.--Not
     later than 2 years after the date of enactment of the
     Pipeline Transportation Safety Improvement Act of 2011, the
     Secretary shall by regulation, after notice and an
     opportunity for a hearing, require the use of automatic or
     remote-controlled shut-off valves, or equivalent technology,
     where economically, technically, and operationally feasible
     on transmission pipelines constructed or entirely replaced
     after the date on which the Secretary issues a final rule.''.

     SEC. 6. EXCESS FLOW VALVES.

       Section 60109(e)(3) is amended--
       (1) by redesignating subparagraph (B) as subparagraph (C);
     and
       (2) by inserting after subparagraph (A) the following:
       ``(B) Distribution branch services, multi-family
     facilities, and small commercial facilities.--Not later than
     2 years after the date of enactment of the Pipeline
     Transportation

[[Page S6614]]

     Safety Improvement Act of 2011, the Secretary shall prescribe
     regulations, after notice and an opportunity for hearing, to
     require the use of excess flow valves, where economically and
     technically feasible, on new or entirely replaced
     distribution branch services, multi-family facilities, and
     small commercial facilities.''.

     SEC. 7. INTEGRITY MANAGEMENT.

       (a) Evaluation.--Within 1 year after the date of enactment
     of this Act, the Secretary of Transportation shall evaluate--
       (1) whether integrity management system requirements, or
     elements thereof, should be expanded beyond high consequence
     areas (as defined under section 60109(a) of title 49, United
     States Code);
       (2) with respect to gas pipeline facilities, whether
     applying the integrity management program requirements to
     additional areas would mitigate the need for class location
     requirements, with an emphasis on class 3 and 4 facilities;
     and
       (3) whether data collected outside high consequence areas
     as part of gas transmission pipeline integrity management
     programs should be included as part of the records required
     to be maintained by operators.
       (b) Standards.--Not later than 1 year after completion of
     the evaluation, the Secretary shall prescribe such
     regulations, as appropriate, after notice and an opportunity
     for a hearing.
       (c) Data Reporting.--The Secretary shall collect any
     relevant data necessary to complete the evaluation required
     by subsection (a) and may collect such additional data
     pursuant to regulations promulgated under subsection (b) as
     may be necessary.
       (d) Seismicity.--In identifying high consequence areas
     under section 60109, the Secretary shall consider the
     seismicity of the area.

     SEC. 8. PUBLIC EDUCATION AND AWARENESS.

       (a) In General.--Chapter 601 is amended by adding at the
     end the following:

     ``Sec. 60138. Public education and awareness

       ``(a) In General.--Not later than 1 year after the date of
     enactment of the Pipeline Transportation Safety Improvement
     Act of 2011, the Secretary shall--
       ``(1) maintain a monthly updated summary of all completed
     and final natural gas and hazardous liquid pipeline
     inspections conducted by or reported to the Pipeline and
     Hazardous Materials Safety Administration that includes--
       ``(A) identification of the operator inspected;
       ``(B) the type of inspection;
       ``(C) the results of the inspection, including any
     deficiencies identified; and
       ``(D) any corrective actions required to be taken by the
     operator to remediate such deficiencies;
       ``(2) maintain--
       ``(A) a status indication of the review and approval of
     each gas emergency response plan pursuant to section
     60102(d)(5) of this title and of each hazardous liquid
     pipeline operator's response plan pursuant to part 194 of
     title 49, Code of Federal Regulations;
       ``(B) a comprehensive description of the requirements for
     such plans; and
       ``(C) a detailed summary of each approved plan written by
     the operator that includes the key elements of the plan, but
     which may exclude--
       ``(i) proprietary information;
       ``(ii) security-sensitive information, including as
     referenced in section 1520.5(a) of title 49, code of Federal
     Regulations;
       ``(iii) specific response resources and tactical resource
     deployment plans; and
       ``(iv) the specific amount and location of worst-case
     discharges, including the process by which an operator
     determines the worst discharge.
       ``(3) excluding any proprietary or security-sensitive
     information, as part of the National Pipeline Mapping System
     maintain a map of all currently designated high consequence
     areas in which pipelines are required to meet integrity
     management safety regulations and update the map annually;
     and
       ``(4) maintain a copy or, at a minimum, a detailed summary
     of any industry-developed or professional organization
     pipeline safety standards that have been incorporated by
     reference into regulations, to the extent consistent with
     fair use.
       ``(b) Public Availability.--The requirements of subsection
     (a) shall be considered to have been met if the information
     required to be made public is made available on the Pipeline
     and Hazardous Materials Safety Administration's public Web
     site.
       ``(c) Relationship to FOIA.--Nothing in this section shall
     be construed to require disclosure of information or records
     that are exempt from disclosure under section 552 of title
     5.''.
       (b) Clerical Amendment.--The table of contents for chapter
     601 is amended by inserting after the item relating to
     section 60137 the following new item:

``60138. Public education and awareness''.

     SEC. 9. CAST IRON GAS PIPELINES.

       (a) Survey Update.--Not later than one year after the
     enactment of this Act, the Secretary of Transportation shall
     conduct a follow-on survey to the survey conducted under
     section 60108(d) to determine--
       (1) the extent to which each operator has adopted a plan
     for the safe management and replacement of cast iron
     pipelines;
       (2) the elements of the plan, including the anticipated
     rate of replacement; and
       (3) the progress that has been made.
       (b) Survey Frequency.--Section 60108(d) is amended by
     adding at the end the following new paragraph:
       ``(4) The secretary shall conduct a follow-up survey to
     measure progress of plan implementation biannually.''.

     SEC. 10. LEAK DETECTION.

       (a) Leak Detection Study Update.--Not later than 1 year
     after the date of enactment of this Act, the Secretary of
     Transportation shall submit to the Committee on Commerce,
     Science, and Transportation of the Senate and the Committees
     on Transportation and Infrastructure and on Energy and
     Commerce of the House of Representatives an updated report on
     leak detection systems utilized by operators of hazardous
     liquid pipelines and transportation-related flow lines. The
     report shall include an analysis of the technical limitations
     of current leak detection systems, including the systems'
     ability to detect ruptures and small leaks that are ongoing
     or intermittent, and what can be done to foster development
     of better technologies.
       (b) Leak Detection Standards.--Not later than 1 year after
     completion of the report, the Secretary shall, as
     appropriate, based on the study in subsection (a), prescribe
     regulations, after notice and an opportunity for a hearing,
     requiring an operator of a hazardous liquid pipeline to use
     leak detection technologies, particularly in high consequence
     areas.

     SEC. 11. INCIDENT NOTIFICATION.

       Not later than 18 months after the date of enactment of
     this Act, the Secretary of Transportation shall--
       (1) prescribe regulations, after notice and an opportunity
     for a hearing, that establish time limits for accident and
     incident telephonic or electronic notification by pipeline
     operators to State and local government officials and
     emergency responders when a spill or rupture occurs; and
       (2) review procedures for pipeline operators and the
     National Response Center to provide thorough and coordinated
     notification to all relevant emergency response officials and
     revise such procedures as appropriate.

     SEC. 12. TRANSPORTATION-RELATED ONSHORE FACILITY RESPONSE
                   PLAN COMPLIANCE.

       (a) In General.--Subparagraphs (A) and (B) of section
     311(m)(2) of the Federal Water Pollution Control Act (33
     U.S.C. 1321(m)(2)) are each amended by striking
     ``Administrator or'' and inserting ``Administrator, the
     Secretary of Transportation, or''.
       (b) Conforming Amendment.--Section 311(b)(6)(A) of the
     Federal Water Pollution Control Act (33 U.S.C. 1321(b)(6)(A))
     is amended by striking ``operating or'' and inserting
     ``operating, the Secretary of Transportation, or''.

     SEC. 13. PIPELINE INFRASTRUCTURE DATA COLLECTION.

       (a) In General.--Section 60132(a) is amended--
       (1) by striking ``and gathering lines''; and
       (2) by adding at the end the following:
       ``(4) Any other geospatial, technical, or other related
     pipeline data, including design and material specifications,
     that the Secretary determines is necessary to carry out the
     purposes of this section. The Secretary shall give reasonable
     notice to operators that the data are being requested.''.
       (b) Disclosure Limited to FOIA Requirements.--Section 60132
     is amended by adding at the end the following:
       ``(d) Public Disclosure Limited.--The Secretary may not
     disclose information collected pursuant to subsection (a)
     except to the extent permitted by section 552 of title 5.''.

     SEC. 14. INTERNATIONAL COOPERATION AND CONSULTATION.

       Section 60117 is amended by adding at the end the
     following:
       ``(o) International Cooperation and Consultation.--
       ``(1) Information exchange and technical assistance.--If
     the Secretary determines that it would benefit the United
     States, subject to guidance from the Secretary of State, the
     Secretary may engage in activities supporting cooperative
     international efforts to share information about the risks to
     the public and the environment from pipelines and means of
     protecting against those risks. Such cooperation may include
     the exchange of information with domestic and appropriate
     international organizations to facilitate efforts to develop
     and improve safety standards and requirements for pipeline
     transportation in or affecting interstate or foreign
     commerce.
       ``(2) Consultation.--To the extent practicable, subject to
     guidance from the Secretary of State, the Secretary may
     consult with interested authorities in Canada, Mexico, and
     other interested authorities, as needed, to ensure that the
     respective pipeline safety standards and requirements
     prescribed by the Secretary and those prescribed by such
     authorities are consistent with the safe and reliable
     operation of cross-border pipelines.
       ``(3) Differences in international standards and
     requirements.--Nothing in this section requires that a
     standard or requirement prescribed by the Secretary under
     this chapter be identical to a standard or requirement
     adopted by an international authority.''.

     SEC. 15. GAS AND HAZARDOUS LIQUID GATHERING LINES.

       Not later than 2 years after the date of enactment of this
     Act, the Secretary of Transportation shall complete a review
     of all exemptions for gas and hazardous liquid gathering
     lines. Based on this review the Secretary shall submit a
     report to the Committee on Commerce, Science, and
     Transportation of the Senate and the Committees on
     Transportation and Infrastructure and on Energy and Commerce
     of the House of Representatives containing the Secretary's
     recommendations with respect to the modification or
     revocation of existing exemptions.

     SEC. 16. TRANSPORTATION-RELATED OIL FLOW LINES.

       Section 60102, as amended by section 5, is further amended
     by adding at the end the following:
       ``(o) Transportation-related Oil Flow Lines.--
       ``(1) Data collection.--The Secretary may collect
     geospatial, technical, or other pipeline

[[Page S6615]]

     data on transportation-related oil flow lines, including
     unregulated transportation-related oil flow lines.
       ``(2) Transportation-related oil flow line defined.--In
     this subsection, the term `transportation-related oil flow
     line' means a pipeline transporting oil off of the grounds of
     the well where it originated across areas not owned by the
     producer regardless of the extent to which the oil has been
     processed, if at all.
       ``(3) Limitation.--Nothing in this subsection authorizes
     the Secretary to prescribe standards for the movement of oil
     through production, refining, or manufacturing facilities, or
     through oil production flow lines located on the grounds of
     wells.''.

     SEC. 17. ALASKA PROJECT COORDINATION.

       (a) In General.--Chapter 601, as amended by section 8 of
     this Act, is further amended by adding at the end the
     following:

     ``Sec. 60139. Alaska project coordination

       ``The Secretary may provide technical assistance to the
     State of Alaska for the purpose of achieving coordinated and
     effective oversight of the construction, expansion, or
     operation of pipeline systems in Alaska. The assistance may
     include--
       ``(1) conducting coordinated inspections of pipeline
     systems subject to the respective authorities of the
     Department of Transportation and the State of Alaska;
       ``(2) consulting on the development and implementation of
     programs designed to manage the integrity risks associated
     with operating pipeline systems in the unique conditions of
     Alaska;
       ``(3) training inspection and enforcement personnel and
     consulting on the development and implementation of
     inspection protocols and training programs; and
       ``(4) entering into cooperative agreements, grants, or
     other transactions with the State of Alaska, the Joint
     Pipeline Office, other Federal agencies, and other public and
     private agencies to carry out the objectives of this
     section.''.
       (b) Clerical Amendment.--The table of contents for chapter
     601, as amended by section 8 of this Act, is further amended
     by inserting after the item relating to section 60138 the
     following new item:

``60139. Alaska project coordination''.

     SEC. 18. COST RECOVERY FOR DESIGN REVIEWS.

       Section 60117(n) is amended to read as follows:
       ``(n) Cost Recovery for Design Reviews.--
       ``(1) In general.--
       ``(A) Review costs.--For any project described in
     subparagraph (B), if the Secretary conducts facility design
     safety reviews in connection with a proposal to construct,
     expand, or operate a new gas or hazardous liquid pipeline or
     liquefied natural gas pipeline facility, including
     construction inspections and oversight, the Secretary may
     require the person or entity proposing the project to pay the
     costs incurred by the Secretary relating to such reviews. If
     the Secretary exercises the cost recovery authority described
     in this section, the Secretary shall prescribe a fee
     structure and assessment methodology that is based on the
     costs of providing these reviews and shall prescribe
     procedures to collect fees under this section. This authority
     is in addition to the authority provided in section 60301 of
     this title, but the Secretary may not collect fees under this
     section and section 60301 for the same design safety review.
       ``(B) Projects to which applicable.--Subparagraph (A)
     applies to any project that--
       ``(i) has design and construction costs totaling at least
     $3,400,000,000; or
       ``(ii) uses new or novel technologies or designs.
       ``(2) Notification.--For any new pipeline construction
     project in which the Secretary will conduct design reviews,
     the person or entity proposing the project shall notify the
     Secretary and provide the design specifications, construction
     plans and procedures, and related materials at least 120 days
     prior to the commencement of construction.
       ``(3) Deposit and use.--There is established a Pipeline
     Safety Design Review Fund in the Treasury of the United
     States. The Secretary shall deposit funds paid under this
     subsection into the Fund. Funds deposited under this section
     are authorized to be appropriated for the purposes set forth
     in this chapter. Fees authorized under this section shall be
     collected and available for obligation only to the extent and
     in the amount provided in advance in appropriations Acts.
       ``(4) No additional permitting authority.--Nothing in this
     subsection shall be construed as authorizing the Secretary to
     require a person to obtain a permit before beginning design
     and construction in connection with a project described in
     paragraph (1)(B).''.

     SEC. 19. SPECIAL PERMITS.

       Section 60118(c)(1) is amended to read as follows:
       ``(1) Issuance of waivers.--
       ``(A) In general.--On application of an owner or operator
     of a pipeline facility, the Secretary by order may waive
     compliance with any part of an applicable standard prescribed
     under this chapter with respect to the facility on terms the
     Secretary considers appropriate, if the Secretary determines
     that the waiver is not inconsistent with pipeline safety.
       ``(B) Considerations.--In determining whether to grant a
     waiver, the Secretary shall consider--
       ``(i) the fitness of the applicant to conduct the activity
     authorized by the waiver in a manner that is consistent with
     pipeline safety;
       ``(ii) the applicant's compliance history;
       ``(iii) the applicant's accident history; and
       ``(iv) any other information or data the Secretary
     considers relevant to making the determination.
       ``(C) Effective period.--A waiver of one or more pipeline
     operating requirements shall be reviewed by the Secretary 5
     years after its effective date. In reviewing a waiver, the
     Secretary shall consider any change in ownership or control
     of the pipeline, any change in the conditions around the
     pipeline, and other factors as appropriate. The Secretary may
     modify, suspend, or revoke a waiver after such review under
     subparagraph (E).
       ``(D) Public notice and hearing.--The Secretary may act on
     a waiver under this section only after public notice and an
     opportunity for a hearing, which may consist of publication
     of notice in the Federal Register that an application for a
     waiver has been filed and providing the public with the
     opportunity to review and comment on the application. If a
     waiver is granted, the Secretary shall state in the order and
     associated analysis the reasons for granting it.
       ``(E) Noncompliance and modification, suspension, or
     revocation.--After notice to a holder of a waiver and
     opportunity to show cause, the Secretary may modify, suspend,
     or revoke a waiver issued under this section for failure to
     comply with its terms or conditions, intervening changes in
     Federal law, a material change in circumstances affecting
     safety, including erroneous information in the application,
     or any other reason. If necessary to avoid a significant risk
     of harm to persons, property, or the environment, the
     Secretary may waive the show cause procedure and make the
     action immediately effective.''.

     SEC. 20. BIOFUEL PIPELINES.

       Section 60101(a)(4) is amended--
       (1) by striking ``and'' after the semicolon in subparagraph
     (A);
       (2) by redesignating subparagraph (B) as subparagraph (C);
     and
       (3) by inserting after subparagraph (A) the following:
       ``(B) non-petroleum fuels, including biofuels that are
     flammable, toxic, or corrosive or would be harmful to the
     environment if released in significant quantities; and''.

     SEC. 21. CARBON DIOXIDE PIPELINES.

       Section 60102(i) is amended to read as follows:
       ``(i) Pipelines Transporting Carbon Dioxide.--The Secretary
     shall prescribe minimum safety standards for the
     transportation of carbon dioxide by pipeline in either a
     liquid or gaseous state.''.

     SEC. 22. STUDY OF THE TRANSPORTATION OF TAR SANDS CRUDE OIL.

       Not later than 18 months after the date of enactment of
     this Act, the Secretary of Transportation shall complete a
     comprehensive review of hazardous liquid pipeline regulations
     to determine whether these regulations are sufficient to
     regulate pipelines used for the transportation of tar sands
     crude oil. In conducting this review, the Secretary shall
     conduct an analysis of whether any increase in risk of
     release exists for pipelines transporting tar sands crude
     oil. The Secretary shall report the results of this review to
     the Committee on Commerce, Science, and Transportation of the
     Senate and the Committees on Transportation and
     Infrastructure and on Energy and Commerce of the House of
     Representatives.

     SEC. 23. STUDY OF NON-PETROLEUM HAZARDOUS LIQUIDS TRANSPORTED
                   BY PIPELINE.

       The Secretary of Transportation may conduct an analysis of
     the transportation of non-petroleum hazardous liquids by
     pipeline for the purpose of identifying the extent to which
     pipelines are currently being used to transport non-petroleum
     hazardous liquids, such as chlorine, from chemical production
     facilities across land areas not owned by the producer that
     are accessible to the public. The analysis should identify
     the extent to which the safety of the lines is unregulated by
     the States and evaluate whether the transportation of such
     chemicals by pipeline across areas accessible to the public
     would present significant risks to public safety, property,
     or the environment in the absence of regulation. The results
     of the analysis shall be made available to the Committee on
     Commerce, Science, and Transportation of the Senate and the
     Committees on Transportation and Infrastructure and on Energy
     and Commerce of the House of Representatives.

     SEC. 24. CLARIFICATIONS.

       (a) Amendment of Procedures Clarification.--Section
     60108(a)(1) is amended by striking ``an intrastate'' and
     inserting ``a''.
       (b) Owner and Operator Clarification.--Section
     60102(a)(2)(A) is amended by striking ``owners and
     operators'' and inserting ``any or all of the owners or
     operators''.
       (c) One-call Enforcement Clarification.--Section 60114(f)
     is amended by adding at the end the following: ``This
     subsection does not apply to proceedings against persons who
     are pipeline operators.''.

     SEC. 25. ADDITIONAL RESOURCES.

       (a) In General.--To the extent funds are appropriated, the
     Secretary of Transportation shall increase the personnel of
     the Pipeline and Hazardous Materials Safety Administration by
     a total of 39 full-time employees to carry out the pipeline
     safety program and the administration of that program, of
     which at least--
       (1) 9 employees shall be added in fiscal year 2011;
       (2) 10 employees shall be added in fiscal year 2012;
       (3) 10 employees shall be added in fiscal year 2013; and
       (4) 10 employees shall be added in fiscal year 2014.
       (b) Functions.--In increasing the number of employees under
     subsection (a), the Secretary shall focus on hiring
     employees--
       (1) to conduct data collection, analysis, and reporting;
       (2) to develop, implement, and update information
     technology;

[[Page S6616]]

       (3) to conduct inspections of pipeline facilities to
     determine compliance with applicable regulations and
     standards;
       (4) to provide administrative, legal, and other support for
     pipeline enforcement activities; and
       (5) to support the overall pipeline safety mission of the
     Pipeline and Hazardous Materials Safety Administration,
     including training of pipeline enforcement personnel.

     SEC. 26. MAINTENANCE OF EFFORT.

       Section 60107(b) is amended to read as follows:
       ``(b) Payments.--After notifying and consulting with a
     State authority, the Secretary may withhold any part of a
     payment when the Secretary decides that the authority is not
     carrying out satisfactorily a safety program or not acting
     satisfactorily as an agent. The Secretary may pay an
     authority under this section only when the authority ensures
     the Secretary that it will provide the remaining costs of a
     safety program and that the total State amount spent for a
     safety program (excluding grants of the United States
     Government) will at least equal the average amount spent for
     gas and hazardous liquid safety programs for fiscal years
     2004 through 2006, except when the Secretary waives the
     requirements of this subsection. The Secretary shall grant
     such a waiver if a State can demonstrate an inability to
     maintain or increase the required funding share of its
     pipeline safety program at or above the level required by
     this subsection due to economic hardship in that State.''.

     SEC. 27. MAXIMUM ALLOWABLE OPERATING PRESSURE.

       (a) Establishment of Records.--
       (1) In general.--Not later than 6 months after the date of
     enactment of this Act, the Secretary of Transportation shall
     require pipeline operators to conduct a verification of
     records for all interstate and intrastate gas transmission
     lines in class 3 and class 4 locations and class 1 and class
     2 high consequence areas that accurately reflect the
     pipeline's physical and operational characteristics and
     confirm the established maximum allowable operating pressure
     of those pipelines.
       (2) Elements.--Verification of each record under paragraph
     (1) shall include such elements as the Secretary considers
     appropriate.
       (b) Reporting.--
       (1) Documentation of certain pipelines.--Not later than 18
     months after the date of enactment of this Act, pipeline
     operators shall submit to the Secretary documentation of all
     interstate and intrastate gas transmission pipelines in class
     3 and class 4 locations and class 1 and class 2 high
     consequence areas where the records required under subsection
     (a) are not sufficient to confirm the established maximum
     allowable operating pressure of those pipeline segments.
       (2) Exceedances of maximum allowable operating pressure.--
     All pipeline operators shall report any exceedance of the
     maximum allowable operating pressure for gas transmission
     pipelines that exceed the build-up allowed for operation of
     pressure-limiting or control devices to the Secretary not
     later than 5 working days after the exceedance occurs. Notice
     of exceedance by gas transmission pipelines shall be provided
     concurrently to appropriate State authorities.
       (c) Determination of Maximum Allowable Operating
     Pressure.--
       (1) In general.--For any transmission line reported in
     subsection (b), the Secretary shall require the operator of
     the transmission line to reconfirm a maximum allowable
     operational pressure as expeditiously as economically
     feasible.
       (2) Interim actions.--For cases described in paragraph (1),
     the Secretary will determine what actions are appropriate for
     a pipeline operator to take to maintain safety until a
     maximum allowable operating pressure is confirmed. In
     determining what actions an operator should take, the
     Secretary shall take into account consequences to public
     safety and the environment, impacts on pipeline system
     reliability and deliverability, and other factors, as
     appropriate.

     SEC. 28. ADMINISTRATIVE ENFORCEMENT PROCESS.

       (a) Issuance of Regulations.--
       (1) In general.--Not later than 2 years after the date of
     the enactment of this Act, the Secretary shall prescribe
     regulations--
       (A) requiring hearings under sections 60112, 60117, 60118,
     and 60122 to be convened before a presiding official;
       (B) providing the opportunity for any person requesting a
     hearing under sections 60112, 60117, 60118, and 60122 to
     arrange for a transcript of that hearing, at the expense of
     the requesting person; and
       (C) ensuring expedited review of any order issued pursuant
     to section 60112(e).
       (2) Presiding official.--The regulations prescribed under
     this subsection shall--
       (A) define the term ``presiding official'' to mean the
     person who conducts any hearing relating to civil penalty
     assessments, compliance orders, safety orders, or corrective
     action orders; and
       (B) require that the presiding official must be an attorney
     on the staff of the Deputy Chief Counsel that is not engaged
     in investigative or prosecutorial functions, including the
     preparation of notices of probable violations, orders
     relating to civil penalty assessments, compliance orders, or
     corrective action orders.
       (b) Standards of Judicial Review.--Section 60119(a) is
     amended by adding at the end the following new paragraph:
       ``(3) All judicial review of agency action under this
     section shall apply the standards of review established in
     section 706 of title 5.''.

     SEC. 29. AUTHORIZATION OF APPROPRIATIONS.

       (a) Gas and Hazardous Liquid.--
       (1) Section 60125(a)(1) is amended by striking
     subparagraphs (A) through (D) and inserting the following:
       ``(A) for fiscal year 2011, $92,206,000, of which
     $9,200,000 is for carrying out such section 12 and
     $36,958,000 is for making grants;
       ``(B) for fiscal year 2012, $96,144,000, of which
     $9,600,000 for carrying out such section 12 and $39,611,000
     is for making grants;
       ``(C) for fiscal year 2013, $99,876,000, of which
     $9,900,000 is for carrying out such section 12 and
     $41,148,000 is for making grants; and
       ``(D) for fiscal year 2014, $102,807,000, of which
     $10,200,000 is for carrying out such section 12 and
     $42,356,000 is for making grants.''.
       (2) Section 60125(a)(2) is amended by striking
     subparagraphs (A) through (D) and inserting the following:
       ``(A) for fiscal year 2011, $18,905,000, of which
     $7,562,000 is for carrying out such section 12 and $7,864,000
     is for making grants;
       ``(B) for fiscal year 2012, $19,661,000, of which
     $7,864,000 is for carrying out such section 12 and $7,864,000
     is for making grants;
       ``(C) for fiscal year 2013, $20,000,000, of which
     $8,000,000 is for carrying out such section 12 and $8,000,000
     is for making grants; and
       ``(D) for fiscal year 2014, $20,000,000, of which
     $8,000,000 is for carrying out such section 12 and $8,000,000
     is for making grants.''.
       (b) Emergency Response Grants.--Section 60125(b)(2) is
     amended by striking ``2007 through 2010'' and inserting
     ``2011 through 2014''.
       (c) One-call Notification Programs.--Section 6107 is
     amended--
       (1) by striking ``2007 through 2010.'' in subsection (a)
     and inserting ``2011 through 2014.'';
       (2) by striking ``2007 through 2010.'' in subsection (b)
     and inserting ``2011 through 2014.''; and
       (3) by striking subsection (c).
       (d) State Damage Prevention Programs.--Section 60134 is
     amended by adding at the end the following:
       ``(i) Authorization of Appropriations.--There are
     authorized to be appropriated to the Secretary to provide
     grants under this section $2,000,000 for each of fiscal years
     2011 through 2014. The funds shall remain available until
     expended.''.
       (e) Community Pipeline Safety Information Grants.--Section
     60130 is amended--
       (1) by striking ``$50,000'' in subsection (a)(1) and
     inserting ``$100,000''; and
       (2) by striking ``2003 through 2010.'' in subsection (d)
     and inserting ``2011 through 2014.''.
       (f) Pipeline Transportation Research and Development.--
     Section 12 of the Pipeline Safety Improvement Act of 2002 (49
     U.S.C. 60101 note) is amended--
       (1) by adding at the end of subsection (d) the following:
       ``(3) Ongoing pipeline transportation research and
     development.--After the initial 5-year program plan has been
     carried out by the participating agencies, the Secretary of
     Transportation shall prepare a research and development
     program plan every 5 years thereafter and shall transmit a
     report to Congress on the status and results-to-date of
     implementation of the program each year that funds are
     appropriated for carrying out the plan.''; and
       (2) by striking ``2003 through 2006.'' in subsection (f)
     and inserting ``2011 through 2014.''.

  Mr. REID. Mr. President, I ask unanimous consent the committee-
reported substitute be considered, the Rockefeller and Paul amendments
at the desk be agreed to, the substitute amendment be agreed to, and
the bill as amended be read a third time and passed, the motion to
reconsider be considered made and laid upon the table, with no
intervening action or debate, and any statements relating to this
matter be printed in the Record.
  The PRESIDING OFFICER. Without objection, it is so ordered.
  The amendment (No. 783) was agreed to, as follows:

     (Purpose: To include the statutorily required PAYGO language)

       On page 64, after line 18, add the following:

     SEC. 30. PAYGO COMPLIANCE.

       The budgetary effects of this Act, for the purpose of
     complying with the Statutory Pay-As-You-Go-Act of 2010, shall
     be determined by reference to the latest statement titled
     ``Budgetary Effects of PAYGO Legislation'' for this Act,
     submitted for printing in the Congressional Record by the
     Chairman of the Senate Budget Committee, provided that such
     statement has been submitted prior to the vote on passage.

  The amendment (No. 784) was agreed to.
  (The text of the amendment is printed in today's Record under ``Text
of Amendments.'')
  The committee amendment in the nature of a substitute, as amended,
was agreed to.
  The bill (S. 275), as amended, was ordered to be engrossed for a
third reading, was read the third time and passed, as follows:

                                 S. 275

       Be it enacted by the Senate and House of Representatives of
     the United States of America in Congress assembled,

     SECTION 1. SHORT TITLE; AMENDMENT OF TITLE 49, UNITED STATES
                   CODE; TABLE OF CONTENTS.

       (a) Short Title.--This Act may be cited as the ``Pipeline
     Transportation Safety Improvement Act of 2011''.
       (b) Amendment of Title 49, United States Code.--Except as
     otherwise expressly provided, whenever in this Act an
     amendment

[[Page S6617]]

     or repeal is expressed in terms of an amendment to, or a
     repeal of, a section or other provision, the reference shall
     be considered to be made to a section or other provision of
     title 49, United States Code.
       (c) Table of Contents.--The table of contents for this Act
     is as follows:

Sec. 1. Short title; amendment of title 49, United States Code; table
              of contents.
Sec. 2. Civil penalties.
Sec. 3. Pipeline damage prevention.
Sec. 4. Offshore gathering pipelines.
Sec. 5. Automatic and remote-controlled shut-off valves.
Sec. 6. Excess flow valves.
Sec. 7. Integrity management.
Sec. 8. Public education and awareness.
Sec. 9. Cast iron gas pipelines.
Sec. 10. Leak detection.
Sec. 11. Incident notification.
Sec. 12. Transportation-related onshore facility response plan
              compliance.
Sec. 13. Pipeline infrastructure data collection.
Sec. 14. International cooperation and consultation.
Sec. 15. Gas and hazardous liquid gathering lines.
Sec. 16. Transportation-related oil flow lines.
Sec. 17. Alaska project coordination.
Sec. 18. Cost recovery for design reviews.
Sec. 19. Special permits.
Sec. 20. Biofuel pipelines.
Sec. 21. Carbon dioxide pipelines.
Sec. 22. Study of the transportation of tar sands crude oil.
Sec. 23. Study of non-petroleum hazardous liquids transported by
              pipeline.
Sec. 24. Clarifications.
Sec. 25. Additional resources.
Sec. 26. Maintenance of effort.
Sec. 27. Maximum allowable operating pressure.
Sec. 28. Administrative enforcement process.
Sec. 29. Authorization of appropriations.
Sec. 30. PAYGO compliance.

     SEC. 2. CIVIL PENALTIES.

       (a) Penalty Considerations; Major Consequence Violations.--
     Section 60122 is amended--
       (1) by striking ``the ability to pay,'' in subsection
     (b)(1)(B);
       (2) by redesignating subsections (c) through (f) as
     subsections (d) through (g), respectively; and
       (3) by inserting after subsection (b) the following:
       ``(c) Penalties for Major Consequence Violations.--
       ``(1) In general.--A person that the Secretary of
     Transportation decides, after written notice and an
     opportunity for a hearing, has committed a major consequence
     violation of section 60114(b), 60114(d), or 60118(a) of this
     title or a regulation prescribed or order issued under this
     chapter is liable to the United States Government for a civil
     penalty of not more than $250,000 for each violation. A
     separate violation occurs for each day the violation
     continues. The maximum civil penalty under this paragraph for
     a related series of major consequence violations is
     $2,500,000.
       ``(2) Penalty considerations.--In determining the amount of
     a civil penalty for a major consequence violation under this
     subsection, the Secretary shall consider the factors
     prescribed in subsection (b).
       ``(3) Major consequence violation defined.--In this
     subsection, the term `major consequence violation' means a
     violation that contributed to an incident resulting in--
       ``(A) 1 or more deaths;
       ``(B) 1 or more injuries or illnesses requiring in-patient
     hospitalization; or
       ``(C) environmental harm exceeding $250,000 in estimated
     damage to the environment including property loss other than
     the value of natural gas or hazardous liquid lost, or damage
     to pipeline equipment.''.
       (b) Penalty for Obstruction of Inspections and
     Investigations.--Section 60118(e) is amended by adding at the
     end the following: ``The Secretary may impose a civil penalty
     under section 60122 of this title on a person who obstructs
     or prevents the Secretary from carrying out inspections or
     investigations under this chapter.''.
       (c) Administrative Penalty Caps Inapplicable.--Section
     60120(a)(1) is amended by adding at the end the following:
     ``The maximum amount of civil penalties for administrative
     enforcement actions under section 60122 of this title shall
     not apply to enforcement actions under this section.''.
       (d) Judicial Review of Administrative Enforcement Orders.--
     Section 60119(a) is amended--
       (1) by striking the subsection caption and inserting ``(a)
     Review of Regulations, Orders, and Other Final Agency
     Actions.--''; and
       (2) by striking ``about an application for a waiver under
     section 60118(c) or (d) of'' and inserting ``under''.

     SEC. 3. PIPELINE DAMAGE PREVENTION.

       (a) Minimum Standards for State One-call Notification
     Programs.--Section 6103(a) is amended to read as follows:
       ``(a) Minimum Standards.--
       ``(1) In general.--In order to qualify for a grant under
     section 6106, a State one-call notification program shall, at
     a minimum, provide for--
       ``(A) appropriate participation by all underground facility
     operators, including all government operators;
       ``(B) appropriate participation by all excavators,
     including all government and contract excavators; and
       ``(C) flexible and effective enforcement under State law
     with respect to participation in, and use of, one-call
     notification systems.
       ``(2) Exemptions prohibited.--A State one-call notification
     program may not exempt municipalities, State agencies, or
     their contractors from its one-call notification system
     requirements.''.
       (b) State Damage Prevention Programs.--Section 60134(a) is
     amended--
       (1) by striking ``and'' after the semicolon in paragraph
     (1);
       (2) by striking ``(b).'' in paragraph (2) and inserting
     ``(b); and''; and
       (3) by adding at the end the following:
       ``(3) does not provide any exemptions to municipalities,
     State agencies, or their contractors from its one-call
     notification system requirements.''.
       (c) Effective Date.--The amendments made by this section
     shall take effect 2 years after the date of enactment of this
     Act.

     SEC. 4. OFFSHORE GATHERING PIPELINES.

       Section 60102(k)(1) is amended by striking the last
     sentence and inserting ``Not later than 1 year after the date
     of enactment of the Pipeline Transportation Safety
     Improvement Act of 2011, the Secretary shall issue
     regulations, after notice and an opportunity for a hearing,
     subjecting offshore hazardous liquid gathering pipelines and
     hazardous liquid gathering pipelines located within the
     inlets of the Gulf of Mexico to the same standards and
     regulations as other hazardous liquid gathering pipelines.
     The regulations issued under this paragraph shall not apply
     to low-stress distribution pipelines.''.

     SEC. 5. AUTOMATIC AND REMOTE-CONTROLLED SHUT-OFF VALVES.

       Section 60102 is amended by adding at the end the
     following:
       ``(n) Automatic and Remote-controlled Shut-off Valves.--Not
     later than 2 years after the date of enactment of the
     Pipeline Transportation Safety Improvement Act of 2011, the
     Secretary shall by regulation, after notice and an
     opportunity for a hearing, require the use of automatic or
     remote-controlled shut-off valves, or equivalent technology,
     where economically, technically, and operationally feasible
     on transmission pipelines constructed or entirely replaced
     after the date on which the Secretary issues a final rule.''.

     SEC. 6. EXCESS FLOW VALVES.

       Section 60109(e)(3) is amended--
       (1) by redesignating subparagraph (B) as subparagraph (C);
     and
       (2) by inserting after subparagraph (A) the following:
       ``(B) Distribution branch services, multi-family
     facilities, and small commercial facilities.--Not later than
     2 years after the date of enactment of the Pipeline
     Transportation Safety Improvement Act of 2011, the Secretary
     shall prescribe regulations, after notice and an opportunity
     for hearing, to require the use of excess flow valves, where
     economically and technically feasible, on new or entirely
     replaced distribution branch services, multi-family
     facilities, and small commercial facilities.''.

     SEC. 7. INTEGRITY MANAGEMENT.

       (a) Evaluation.--Within 1 year after the date of enactment
     of this Act, the Secretary of Transportation shall evaluate--
       (1) whether integrity management system requirements, or
     elements thereof, should be expanded beyond high consequence
     areas (as defined under section 60109(a) of title 49, United
     States Code);
       (2) with respect to gas pipeline facilities, whether
     applying the integrity management program requirements to
     additional areas would mitigate the need for class location
     requirements, with an emphasis on class 3 and 4 facilities;
     and
       (3) whether data collected outside high consequence areas
     as part of gas transmission pipeline integrity management
     programs should be included as part of the records required
     to be maintained by operators.
       (b) Standards.--Not later than 1 year after completion of
     the evaluation, the Secretary shall prescribe such
     regulations, as appropriate, after notice and an opportunity
     for a hearing.
       (c) Data Reporting.--The Secretary shall collect any
     relevant data necessary to complete the evaluation required
     by subsection (a) and may collect such additional data
     pursuant to regulations promulgated under subsection (b) as
     may be necessary.
       (d) Seismicity.--In identifying high consequence areas
     under section 60109, the Secretary shall consider the
     seismicity of the area.

     SEC. 8. PUBLIC EDUCATION AND AWARENESS.

       (a) In General.--Chapter 601 is amended by adding at the
     end the following:

     ``Sec. 60138. Public education and awareness

       ``(a) In General.--Not later than 1 year after the date of
     enactment of the Pipeline Transportation Safety Improvement
     Act of 2011, the Secretary shall--
       ``(1) maintain a monthly updated summary of all completed
     and final natural gas and hazardous liquid pipeline
     inspections conducted by or reported to the Pipeline and
     Hazardous Materials Safety Administration that includes--
       ``(A) identification of the operator inspected;
       ``(B) the type of inspection;
       ``(C) the results of the inspection, including any
     deficiencies identified; and

[[Page S6618]]

       ``(D) any corrective actions required to be taken by the
     operator to remediate such deficiencies;
       ``(2) maintain--
       ``(A) a status indication of the review and approval of
     each gas emergency response plan pursuant to section
     60102(d)(5) of this title and of each hazardous liquid
     pipeline operator's response plan pursuant to part 194 of
     title 49, Code of Federal Regulations;
       ``(B) a comprehensive description of the requirements for
     such plans; and
       ``(C) a detailed summary of each approved plan written by
     the operator that includes the key elements of the plan, but
     which may exclude--
       ``(i) proprietary information;
       ``(ii) security-sensitive information, including as
     referenced in section 1520.5(a) of title 49, code of Federal
     Regulations;
       ``(iii) specific response resources and tactical resource
     deployment plans; and
       ``(iv) the specific amount and location of worst-case
     discharges, including the process by which an operator
     determines the worst discharge.
       ``(3) excluding any proprietary or security-sensitive
     information, as part of the National Pipeline Mapping System
     maintain a map of all currently designated high consequence
     areas in which pipelines are required to meet integrity
     management safety regulations and update the map annually;
     and
       ``(4) maintain a copy or, at a minimum, a detailed summary
     of any industry-developed or professional organization
     pipeline safety standards that have been incorporated by
     reference into regulations, to the extent consistent with
     fair use.
       ``(b) Public Availability.--The requirements of subsection
     (a) shall be considered to have been met if the information
     required to be made public is made available on the Pipeline
     and Hazardous Materials Safety Administration's public Web
     site.
       ``(c) Relationship to FOIA.--Nothing in this section shall
     be construed to require disclosure of information or records
     that are exempt from disclosure under section 552 of title
     5.''.
       (b) Clerical Amendment.--The table of contents for chapter
     601 is amended by inserting after the item relating to
     section 60137 the following new item:

``60138. Public education and awareness''.

     SEC. 9. CAST IRON GAS PIPELINES.

       (a) Survey Update.--Not later than one year after the
     enactment of this Act, the Secretary of Transportation shall
     conduct a follow-on survey to the survey conducted under
     section 60108(d) to determine--
       (1) the extent to which each operator has adopted a plan
     for the safe management and replacement of cast iron
     pipelines;
       (2) the elements of the plan, including the anticipated
     rate of replacement; and
       (3) the progress that has been made.
       (b) Survey Frequency.--Section 60108(d) is amended by
     adding at the end the following new paragraph:
       ``(4) The secretary shall conduct a follow-up survey to
     measure progress of plan implementation biannually.''.

     SEC. 10. LEAK DETECTION.

       (a) Leak Detection Study Update.--Not later than 1 year
     after the date of enactment of this Act, the Secretary of
     Transportation shall submit to the Committee on Commerce,
     Science, and Transportation of the Senate and the Committees
     on Transportation and Infrastructure and on Energy and
     Commerce of the House of Representatives an updated report on
     leak detection systems utilized by operators of hazardous
     liquid pipelines and transportation-related flow lines. The
     report shall include an analysis of the technical limitations
     of current leak detection systems, including the systems'
     ability to detect ruptures and small leaks that are ongoing
     or intermittent, and what can be done to foster development
     of better technologies.
       (b) Leak Detection Standards.--Not later than 1 year after
     completion of the report, the Secretary shall, as
     appropriate, based on the study in subsection (a), prescribe
     regulations, after notice and an opportunity for a hearing,
     requiring an operator of a hazardous liquid pipeline to use
     leak detection technologies, particularly in high consequence
     areas.

     SEC. 11. INCIDENT NOTIFICATION.

       Not later than 18 months after the date of enactment of
     this Act, the Secretary of Transportation shall--
       (1) prescribe regulations, after notice and an opportunity
     for a hearing, that establish time limits for accident and
     incident telephonic or electronic notification by pipeline
     operators to State and local government officials and
     emergency responders when a spill or rupture occurs; and
       (2) review procedures for pipeline operators and the
     National Response Center to provide thorough and coordinated
     notification to all relevant emergency response officials and
     revise such procedures as appropriate.

     SEC. 12. TRANSPORTATION-RELATED ONSHORE FACILITY RESPONSE
                   PLAN COMPLIANCE.

       (a) In General.--Subparagraphs (A) and (B) of section
     311(m)(2) of the Federal Water Pollution Control Act (33
     U.S.C. 1321(m)(2)) are each amended by striking
     ``Administrator or'' and inserting ``Administrator, the
     Secretary of Transportation, or''.
       (b) Conforming Amendment.--Section 311(b)(6)(A) of the
     Federal Water Pollution Control Act (33 U.S.C. 1321(b)(6)(A))
     is amended by striking ``operating or'' and inserting
     ``operating, the Secretary of Transportation, or''.

     SEC. 13. PIPELINE INFRASTRUCTURE DATA COLLECTION.

       (a) In General.--Section 60132(a) is amended--
       (1) by striking ``and gathering lines''; and
       (2) by adding at the end the following:
       ``(4) Any other geospatial, technical, or other related
     pipeline data, including design and material specifications,
     that the Secretary determines is necessary to carry out the
     purposes of this section. The Secretary shall give reasonable
     notice to operators that the data are being requested.''.
       (b) Disclosure Limited to FOIA Requirements.--Section 60132
     is amended by adding at the end the following:
       ``(d) Public Disclosure Limited.--The Secretary may not
     disclose information collected pursuant to subsection (a)
     except to the extent permitted by section 552 of title 5.''.

     SEC. 14. INTERNATIONAL COOPERATION AND CONSULTATION.

       Section 60117 is amended by adding at the end the
     following:
       ``(o) International Cooperation and Consultation.--
       ``(1) Information exchange and technical assistance.--If
     the Secretary determines that it would benefit the United
     States, subject to guidance from the Secretary of State, the
     Secretary may engage in activities supporting cooperative
     international efforts to share information about the risks to
     the public and the environment from pipelines and means of
     protecting against those risks. Such cooperation may include
     the exchange of information with domestic and appropriate
     international organizations to facilitate efforts to develop
     and improve safety standards and requirements for pipeline
     transportation in or affecting interstate or foreign
     commerce.
       ``(2) Consultation.--To the extent practicable, subject to
     guidance from the Secretary of State, the Secretary may
     consult with interested authorities in Canada, Mexico, and
     other interested authorities, as needed, to ensure that the
     respective pipeline safety standards and requirements
     prescribed by the Secretary and those prescribed by such
     authorities are consistent with the safe and reliable
     operation of cross-border pipelines.
       ``(3) Differences in international standards and
     requirements.--Nothing in this section requires that a
     standard or requirement prescribed by the Secretary under
     this chapter be identical to a standard or requirement
     adopted by an international authority.''.

     SEC. 15. GAS AND HAZARDOUS LIQUID GATHERING LINES.

       Not later than 2 years after the date of enactment of this
     Act, the Secretary of Transportation shall complete a review
     of all exemptions for gas and hazardous liquid gathering
     lines. Based on this review the Secretary shall submit a
     report to the Committee on Commerce, Science, and
     Transportation of the Senate and the Committees on
     Transportation and Infrastructure and on Energy and Commerce
     of the House of Representatives containing the Secretary's
     recommendations with respect to the modification or
     revocation of existing exemptions.

     SEC. 16. TRANSPORTATION-RELATED OIL FLOW LINES.

       Section 60102, as amended by section 5, is further amended
     by adding at the end the following:
       ``(o) Transportation-related Oil Flow Lines.--
       ``(1) Data collection.--The Secretary may collect
     geospatial, technical, or other pipeline data on
     transportation-related oil flow lines, including unregulated
     transportation-related oil flow lines.
       ``(2) Transportation-related oil flow line defined.--In
     this subsection, the term `transportation-related oil flow
     line' means a pipeline transporting oil off of the grounds of
     the well where it originated across areas not owned by the
     producer regardless of the extent to which the oil has been
     processed, if at all.
       ``(3) Limitation.--Nothing in this subsection authorizes
     the Secretary to prescribe standards for the movement of oil
     through production, refining, or manufacturing facilities, or
     through oil production flow lines located on the grounds of
     wells.''.

     SEC. 17. ALASKA PROJECT COORDINATION.

       (a) In General.--Chapter 601, as amended by section 8 of
     this Act, is further amended by adding at the end the
     following:

     ``Sec. 60139. Alaska project coordination

       ``The Secretary may provide technical assistance to the
     State of Alaska for the purpose of achieving coordinated and
     effective oversight of the construction, expansion, or
     operation of pipeline systems in Alaska. The assistance may
     include--
       ``(1) conducting coordinated inspections of pipeline
     systems subject to the respective authorities of the
     Department of Transportation and the State of Alaska;
       ``(2) consulting on the development and implementation of
     programs designed to manage the integrity risks associated
     with operating pipeline systems in the unique conditions of
     Alaska;
       ``(3) training inspection and enforcement personnel and
     consulting on the development and implementation of
     inspection protocols and training programs; and
       ``(4) entering into cooperative agreements, grants, or
     other transactions with the State

[[Page S6619]]

     of Alaska, the Joint Pipeline Office, other Federal agencies,
     and other public and private agencies to carry out the
     objectives of this section.''.
       (b) Clerical Amendment.--The table of contents for chapter
     601, as amended by section 8 of this Act, is further amended
     by inserting after the item relating to section 60138 the
     following new item:

``60139. Alaska project coordination''.

     SEC. 18. COST RECOVERY FOR DESIGN REVIEWS.

       Section 60117(n) is amended to read as follows:
       ``(n) Cost Recovery for Design Reviews.--
       ``(1) In general.--
       ``(A) Review costs.--For any project described in
     subparagraph (B), if the Secretary conducts facility design
     safety reviews in connection with a proposal to construct,
     expand, or operate a new gas or hazardous liquid pipeline or
     liquefied natural gas pipeline facility, including
     construction inspections and oversight, the Secretary may
     require the person or entity proposing the project to pay the
     costs incurred by the Secretary relating to such reviews. If
     the Secretary exercises the cost recovery authority described
     in this section, the Secretary shall prescribe a fee
     structure and assessment methodology that is based on the
     costs of providing these reviews and shall prescribe
     procedures to collect fees under this section. This authority
     is in addition to the authority provided in section 60301 of
     this title, but the Secretary may not collect fees under this
     section and section 60301 for the same design safety review.
       ``(B) Projects to which applicable.--Subparagraph (A)
     applies to any project that--
       ``(i) has design and construction costs totaling at least
     $3,400,000,000; or
       ``(ii) uses new or novel technologies or designs.
       ``(2) Notification.--For any new pipeline construction
     project in which the Secretary will conduct design reviews,
     the person or entity proposing the project shall notify the
     Secretary and provide the design specifications, construction
     plans and procedures, and related materials at least 120 days
     prior to the commencement of construction.
       ``(3) Deposit and use.--There is established a Pipeline
     Safety Design Review Fund in the Treasury of the United
     States. The Secretary shall deposit funds paid under this
     subsection into the Fund. Funds deposited under this section
     are authorized to be appropriated for the purposes set forth
     in this chapter. Fees authorized under this section shall be
     collected and available for obligation only to the extent and
     in the amount provided in advance in appropriations Acts.
       ``(4) No additional permitting authority.--Nothing in this
     subsection shall be construed as authorizing the Secretary to
     require a person to obtain a permit before beginning design
     and construction in connection with a project described in
     paragraph (1)(B).''.

     SEC. 19. SPECIAL PERMITS.

       Section 60118(c)(1) is amended to read as follows:
       ``(1) Issuance of waivers.--
       ``(A) In general.--On application of an owner or operator
     of a pipeline facility, the Secretary by order may waive
     compliance with any part of an applicable standard prescribed
     under this chapter with respect to the facility on terms the
     Secretary considers appropriate, if the Secretary determines
     that the waiver is not inconsistent with pipeline safety.
       ``(B) Considerations.--In determining whether to grant a
     waiver, the Secretary shall consider--
       ``(i) the fitness of the applicant to conduct the activity
     authorized by the waiver in a manner that is consistent with
     pipeline safety;
       ``(ii) the applicant's compliance history;
       ``(iii) the applicant's accident history; and
       ``(iv) any other information or data the Secretary
     considers relevant to making the determination.
       ``(C) Effective period.--A waiver of one or more pipeline
     operating requirements shall be reviewed by the Secretary 5
     years after its effective date. In reviewing a waiver, the
     Secretary shall consider any change in ownership or control
     of the pipeline, any change in the conditions around the
     pipeline, and other factors as appropriate. The Secretary may
     modify, suspend, or revoke a waiver after such review under
     subparagraph (E).
       ``(D) Public notice and hearing.--The Secretary may act on
     a waiver under this section only after public notice and an
     opportunity for a hearing, which may consist of publication
     of notice in the Federal Register that an application for a
     waiver has been filed and providing the public with the
     opportunity to review and comment on the application. If a
     waiver is granted, the Secretary shall state in the order and
     associated analysis the reasons for granting it.
       ``(E) Noncompliance and modification, suspension, or
     revocation.--After notice to a holder of a waiver and
     opportunity to show cause, the Secretary may modify, suspend,
     or revoke a waiver issued under this section for failure to
     comply with its terms or conditions, intervening changes in
     Federal law, a material change in circumstances affecting
     safety, including erroneous information in the application,
     or any other reason. If necessary to avoid a significant risk
     of harm to persons, property, or the environment, the
     Secretary may waive the show cause procedure and make the
     action immediately effective.''.

     SEC. 20. BIOFUEL PIPELINES.

       Section 60101(a)(4) is amended--
       (1) by striking ``and'' after the semicolon in subparagraph
     (A);
       (2) by redesignating subparagraph (B) as subparagraph (C);
     and
       (3) by inserting after subparagraph (A) the following:
       ``(B) non-petroleum fuels, including biofuels that are
     flammable, toxic, or corrosive or would be harmful to the
     environment if released in significant quantities; and''.

     SEC. 21. CARBON DIOXIDE PIPELINES.

       Section 60102(i) is amended to read as follows:
       ``(i) Pipelines Transporting Carbon Dioxide.--The Secretary
     shall prescribe minimum safety standards for the
     transportation of carbon dioxide by pipeline in either a
     liquid or gaseous state.''.

     SEC. 22. STUDY OF THE TRANSPORTATION OF TAR SANDS CRUDE OIL.

       Not later than 18 months after the date of enactment of
     this Act, the Secretary of Transportation shall complete a
     comprehensive review of hazardous liquid pipeline regulations
     to determine whether these regulations are sufficient to
     regulate pipelines used for the transportation of tar sands
     crude oil. In conducting this review, the Secretary shall
     conduct an analysis of whether any increase in risk of
     release exists for pipelines transporting tar sands crude
     oil. The Secretary shall report the results of this review to
     the Committee on Commerce, Science, and Transportation of the
     Senate and the Committees on Transportation and
     Infrastructure and on Energy and Commerce of the House of
     Representatives.

     SEC. 23. STUDY OF NON-PETROLEUM HAZARDOUS LIQUIDS TRANSPORTED
                   BY PIPELINE.

       The Secretary of Transportation may conduct an analysis of
     the transportation of non-petroleum hazardous liquids by
     pipeline for the purpose of identifying the extent to which
     pipelines are currently being used to transport non-petroleum
     hazardous liquids, such as chlorine, from chemical production
     facilities across land areas not owned by the producer that
     are accessible to the public. The analysis should identify
     the extent to which the safety of the lines is unregulated by
     the States and evaluate whether the transportation of such
     chemicals by pipeline across areas accessible to the public
     would present significant risks to public safety, property,
     or the environment in the absence of regulation. The results
     of the analysis shall be made available to the Committee on
     Commerce, Science, and Transportation of the Senate and the
     Committees on Transportation and Infrastructure and on Energy
     and Commerce of the House of Representatives.

     SEC. 24. CLARIFICATIONS.

       (a) Amendment of Procedures Clarification.--Section
     60108(a)(1) is amended by striking ``an intrastate'' and
     inserting ``a''.
       (b) Owner and Operator Clarification.--Section
     60102(a)(2)(A) is amended by striking ``owners and
     operators'' and inserting ``any or all of the owners or
     operators''.
       (c) One-call Enforcement Clarification.--Section 60114(f)
     is amended by adding at the end the following: ``This
     subsection does not apply to proceedings against persons who
     are pipeline operators.''.

     SEC. 25. ADDITIONAL RESOURCES.

       (a) In General.--To the extent funds are appropriated, the
     Secretary of Transportation shall increase the personnel of
     the Pipeline and Hazardous Materials Safety Administration by
     a total of 39 full-time employees to carry out the pipeline
     safety program and the administration of that program, of
     which at least--
       (1) 9 employees shall be added in fiscal year 2012;
       (2) 10 employees shall be added in fiscal year 2013;
       (3) 10 employees shall be added in fiscal year 2014; and
       (4) 10 employees shall be added in fiscal year 2015.
       (b) Functions.--In increasing the number of employees under
     subsection (a), the Secretary shall focus on hiring
     employees--
       (1) to conduct data collection, analysis, and reporting;
       (2) to develop, implement, and update information
     technology;
       (3) to conduct inspections of pipeline facilities to
     determine compliance with applicable regulations and
     standards;
       (4) to provide administrative, legal, and other support for
     pipeline enforcement activities; and
       (5) to support the overall pipeline safety mission of the
     Pipeline and Hazardous Materials Safety Administration,
     including training of pipeline enforcement personnel.

     SEC. 26. MAINTENANCE OF EFFORT.

       Section 60107(b) is amended to read as follows:
       ``(b) Payments.--After notifying and consulting with a
     State authority, the Secretary may withhold any part of a
     payment when the Secretary decides that the authority is not
     carrying out satisfactorily a safety program or not acting
     satisfactorily as an agent. The Secretary may pay an
     authority under this section only when the authority ensures
     the Secretary that it will provide the remaining costs of a
     safety program and that the total State amount spent for a
     safety program (excluding grants of the United States
     Government) will at least equal the average amount spent for
     gas and hazardous liquid safety programs for fiscal years
     2004 through 2006, except when the Secretary waives the
     requirements of this subsection.

[[Page S6620]]

     The Secretary shall grant such a waiver if a State can
     demonstrate an inability to maintain or increase the required
     funding share of its pipeline safety program at or above the
     level required by this subsection due to economic hardship in
     that State.''.

     SEC. 27. MAXIMUM ALLOWABLE OPERATING PRESSURE.

       (a) Establishment of Records.--
       (1) In general.--Not later than 6 months after the date of
     enactment of this Act, the Secretary of Transportation shall
     require pipeline operators to conduct a verification of
     records for all interstate and intrastate gas transmission
     lines in class 3 and class 4 locations and class 1 and class
     2 high consequence areas that accurately reflect the
     pipeline's physical and operational characteristics and
     confirm the established maximum allowable operating pressure
     of those pipelines.
       (2) Elements.--Verification of each record under paragraph
     (1) shall include such elements as the Secretary considers
     appropriate.
       (b) Reporting.--
       (1) Documentation of certain pipelines.--Not later than 18
     months after the date of enactment of this Act, pipeline
     operators shall submit to the Secretary documentation of all
     interstate and intrastate gas transmission pipelines in class
     3 and class 4 locations and class 1 and class 2 high
     consequence areas where the records required under subsection
     (a) are not sufficient to confirm the established maximum
     allowable operating pressure of those pipeline segments.
       (2) Exceedances of maximum allowable operating pressure.--
     All pipeline operators shall report any exceedance of the
     maximum allowable operating pressure for gas transmission
     pipelines that exceed the build-up allowed for operation of
     pressure-limiting or control devices to the Secretary not
     later than 5 working days after the exceedance occurs. Notice
     of exceedance by gas transmission pipelines shall be provided
     concurrently to appropriate State authorities.
       (c) Determination of Maximum Allowable Operating
     Pressure.--
       (1) In general.--For any transmission line reported in
     subsection (b), the Secretary shall require the operator of
     the transmission line to reconfirm a maximum allowable
     operational pressure as expeditiously as economically
     feasible.
       (2) Interim actions.--For cases described in paragraph (1),
     the Secretary will determine what actions are appropriate for
     a pipeline operator to take to maintain safety until a
     maximum allowable operating pressure is confirmed. In
     determining what actions an operator should take, the
     Secretary shall take into account consequences to public
     safety and the environment, impacts on pipeline system
     reliability and deliverability, and other factors, as
     appropriate.
       (d) Testing Regulations.--The Secretary shall, not later
     than 18 months after the date of the enactment of this Act,
     prescribe regulations for conducting tests to confirm the
     material strength of previously untested natural gas
     transmission pipelines located in areas identified pursuant
     to section 60109(a) of title 49, United States Code, and
     operating at a pressure greater than 30 percent of specified
     minimum yield strength. The Secretary shall consider safety
     testing methodologies including, at a minimum, pressure
     testing or other alternative methods, including in-line
     inspections, determined by the Secretary to be of equal or
     greater effectiveness. The Secretary, in consultation with
     the Chairman of the Federal Energy Regulatory Commission and
     State regulators, as appropriate, shall establish timeframes
     for the completion of such testing that take into account
     consequences to public safety and the environment and that
     minimize costs and service disruptions.

     SEC. 28. ADMINISTRATIVE ENFORCEMENT PROCESS.

       (a) Issuance of Regulations.--
       (1) In general.--Not later than 2 years after the date of
     the enactment of this Act, the Secretary shall prescribe
     regulations--
       (A) requiring hearings under sections 60112, 60117, 60118,
     and 60122 to be convened before a presiding official;
       (B) providing the opportunity for any person requesting a
     hearing under sections 60112, 60117, 60118, and 60122 to
     arrange for a transcript of that hearing, at the expense of
     the requesting person; and
       (C) ensuring expedited review of any order issued pursuant
     to section 60112(e).
       (2) Presiding official.--The regulations prescribed under
     this subsection shall--
       (A) define the term ``presiding official'' to mean the
     person who conducts any hearing relating to civil penalty
     assessments, compliance orders, safety orders, or corrective
     action orders; and
       (B) require that the presiding official must be an attorney
     on the staff of the Deputy Chief Counsel that is not engaged
     in investigative or prosecutorial functions, including the
     preparation of notices of probable violations, orders
     relating to civil penalty assessments, compliance orders, or
     corrective action orders.
       (b) Standards of Judicial Review.--Section 60119(a) is
     amended by adding at the end the following new paragraph:
       ``(3) All judicial review of agency action under this
     section shall apply the standards of review established in
     section 706 of title 5.''.

     SEC. 29. AUTHORIZATION OF APPROPRIATIONS.

       (a) Gas and Hazardous Liquid.--
       (1) Section 60125(a)(1) is amended by striking
     subparagraphs (A) through (D) and inserting the following:
       ``(A) for fiscal year 2012, $92,206,000, of which
     $9,200,000 is for carrying out such section 12 and
     $36,958,000 is for making grants;
       ``(B) for fiscal year 2013, $96,144,000, of which
     $9,600,000 for carrying out such section 12 and $39,611,000
     is for making grants;
       ``(C) for fiscal year 2014, $99,876,000, of which
     $9,900,000 is for carrying out such section 12 and
     $41,148,000 is for making grants; and
       ``(D) for fiscal year 2015, $102,807,000, of which
     $10,200,000 is for carrying out such section 12 and
     $42,356,000 is for making grants.''.
       (2) Section 60125(a)(2) is amended by striking
     subparagraphs (A) through (D) and inserting the following:
       ``(A) for fiscal year 2012, $18,905,000, of which
     $7,562,000 is for carrying out such section 12 and $7,864,000
     is for making grants;
       ``(B) for fiscal year 2013, $19,661,000, of which
     $7,864,000 is for carrying out such section 12 and $7,864,000
     is for making grants;
       ``(C) for fiscal year 2014, $20,000,000, of which
     $8,000,000 is for carrying out such section 12 and $8,000,000
     is for making grants; and
       ``(D) for fiscal year 2015, $20,000,000, of which
     $8,000,000 is for carrying out such section 12 and $8,000,000
     is for making grants.''.
       (b) Emergency Response Grants.--Section 60125(b)(2) is
     amended by striking ``2007 through 2010'' and inserting
     ``2012 through 2015''.
       (c) One-call Notification Programs.--Section 6107 is
     amended--
       (1) by striking ``2007 through 2010.'' in subsection (a)
     and inserting ``2012 through 2015.'';
       (2) by striking ``2007 through 2010.'' in subsection (b)
     and inserting ``2012 through 2015.''; and
       (3) by striking subsection (c).
       (d) State Damage Prevention Programs.--Section 60134 is
     amended by adding at the end the following:
       ``(i) Authorization of Appropriations.--There are
     authorized to be appropriated to the Secretary to provide
     grants under this section $2,000,000 for each of fiscal years
     2012 through 2015. The funds shall remain available until
     expended.''.
       (e) Community Pipeline Safety Information Grants.--Section
     60130 is amended--
       (1) by striking ``$50,000'' in subsection (a)(1) and
     inserting ``$100,000''; and
       (2) by striking ``2003 through 2010.'' in subsection (d)
     and inserting ``2012 through 2015.''.
       (f) Pipeline Transportation Research and Development.--
     Section 12 of the Pipeline Safety Improvement Act of 2002 (49
     U.S.C. 60101 note) is amended--
       (1) by adding at the end of subsection (d) the following:
       ``(3) Ongoing pipeline transportation research and
     development.--After the initial 5-year program plan has been
     carried out by the participating agencies, the Secretary of
     Transportation shall prepare a research and development
     program plan every 5 years thereafter and shall transmit a
     report to Congress on the status and results-to-date of
     implementation of the program each year that funds are
     appropriated for carrying out the plan.''; and
       (2) by striking ``2003 through 2006.'' in subsection (f)
     and inserting ``2012 through 2015.''.

     SEC. 30. PAYGO COMPLIANCE.

       The budgetary effects of this Act, for the purpose of
     complying with the Statutory Pay-As-You-Go-Act of 2010, shall
     be determined by reference to the latest statement titled
     ``Budgetary Effects of PAYGO Legislation'' for this Act,
     submitted for printing in the Congressional Record by the
     Chairman of the Senate Budget Committee, provided that such
     statement has been submitted prior to the vote on passage.

                          ____________________

Legislative Activity

Stay on top of the latest movement without scrolling through every action

4 earlier actions
Floor Latest Action

Senate amendment agreed to: Amendment SA 783 agreed to in Senate by Unanimous Consent.

October 17, 2011

View full timeline
Floor

Senate amendment agreed to: Amendment SA 783 agreed to in Senate by Unanimous Consent.

October 17, 2011

Floor

Senate amendment proposed (on the floor): Amendment SA 783 proposed by Senator Reid for Senator Rockefeller.

October 17, 2011

Floor

Senate amendment submitted

October 17, 2011

Floor

Amendment SA 783 proposed by Senator Reid for Senator Rockefeller. (consideration: CR S6616; text: CR S6616) To include the statutorily required PAYGO language.

October 17, 2011

Floor

Amendment SA 783 agreed to in Senate by Unanimous Consent.

October 17, 2011