H.Amdt. 481House113th Congress (2013-2015)

Amendment adds language which provides for expediting the completion of any on-going feasibility study for a project initiated prior to enactment and clarifies that the Corps of Engineers is authorized to move to preconstruction planning, engineering, and design activities immediately after completing a feasibility study; amends Section 107 to add a savings clause to ensure work carried out under an existing statute related to navigation that is repealed in H.R. 3080 can continue if initiated prior to enactment; adds language providing non-Federal interests the ability to carry out work at their own expense for a project where a final feasibility report has been completed but has not received authorization from Congress; requires the non-Federal interest to carry out work subject to any State or Federal permitting requirements and to carry out the project in accordance with the final feasibility report; amends Section 120 to request the Corps of Engineers to review the uses and economic feasibility of non-structural alternatives in their review of existing authorities for carrying out work after a storm event; amends Section 102 to add natural gas companies to the entities eligible to contribute funds to Corps of Engineers to expedite the processing of permits within the regulatory program of the Corps of Engineers. and makes other technical and conforming changes to the bill.

What it does: 7 changes: inserts text in 3 places, adds 2 sections, replaces text, strikes text
Sponsored by Bob GibbsRep. Bob Gibbs (R-OH)
Submitted October 23, 2013

Description

An amendment numbered 1 printed in House Report 113-251 to add a new section that provides for expediting the completion of any on-going feasibility study for a project initiated prior to enactment and clarifies that the Corps of Engineers is authorized to move to preconstruction planning, engineering, and design activities immediately after completing a feasibility study. Amends Section 107 of H.R. 3080 to add a savings clause to ensure work carried out under an existing statute related to navigation that is repealed in H.R. 3080 can continue if initiated prior to enactment. Adds a new section providing non-Federal interests the ability to carry out work at their own expense for a project where a final feasibility report has been completed but has not received authorization from Congress. Requires the non-Federal interest to carry out work subject to any State or Federal permitting requirements and to carry out the project in accordance with the final feasibility report. Amends Section 120 of H.R. 3080 to request the Corps of Engineers to review the uses and economic feasibility of non-structural alternatives in their review of existing authorities for carrying out work after a storm event. Amends Section 102 of H.R. 3080 to add natural gas companies to the entities eligible to contribute funds to Corps of Engineers to expedite.the processing of permits within the regulatory program of the Corps of Engineers. Makes other technical and conforming changes to H.R. 3080.

What it changes

7 changes to H.R. 3080 · 1 shown in the bill's text

Inserts text in 3 placesAdds 2 sectionsReplaces textStrikes text
  1. Change 1: Inserts “or natural gas company” after “company”

    InsertsPage 6, line 14Printed page

    …company[inserted: or natural gas company]…

    Original wording

    Page 6, line 14, after “company” insert “or natural gas company”.

  2. Change 2: Adds SEC. __. EXPEDITED COMPLETION OF REPORTS on page 33, line 20

    Adds a sectionPrinted page

    Inserted: SEC. __. EXPEDITED COMPLETION OF REPORTS.

    Inserted: The Secretary shall--

    Inserted: (1) expedite the completion of any on-going feasibility study for a project initiated before the date of enactment of this Act; and

    Inserted: (2) if the Secretary determines that the project is justified in a completed report, proceed directly to preconstruction planning, engineering, and design of the project in accordance with section 910 of the Water Resources Development Act of 1986 (100 Stat. 4189).

    Original wording

    Page 33, after line 20, insert the following:

  3. Change 3: Inserts new text on page 42, line 23

    Inserted: (g) Saving Provision.--Nothing in this section may be construed to affect any agreement entered into under section 204(f) of the Water Resources Development Act of 1986 (33 U.S.C. 2232(f)) before the date of enactment of this Act.

    Original wording

    Page 42, after line 23, add the following:

  4. Change 4: Adds SEC. __. CONTRIBUTIONS BY NON-FEDERAL INTERESTS PRIOR TO AUTHORIZATION OF FINAL FEASIBILITY REPORTS on page 46, line 23

    Adds a sectionPrinted page

    Inserted: SEC. __. CONTRIBUTIONS BY NON-FEDERAL INTERESTS PRIOR TO AUTHORIZATION OF FINAL FEASIBILITY REPORTS.

    Inserted: (a) In General.--Subject to subsection (b), a non-Federal interest may carry out a project for which--

    Inserted: (1) a final feasibility report has been completed; and

    Inserted: (2) authority for the Secretary to carry out such project has not specifically been authorized by Congress.

    Inserted: (b) Conditions.--The non-Federal interest--

    Inserted: (1) shall, before carrying out the project, obtain any permit, approval, or authorization required pursuant to Federal or State law; and

    Inserted: (2) shall carry out the project in accordance with the plan, and subject to the conditions, described in the final feasibility report.

    Inserted: (c) Credit, Reimbursement, and Future Maintenance.--

    Inserted: (1) Eligibility for credit or reimbursement.--Subject to paragraph (4), and in accordance with section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d-5b), a non-Federal interest may be eligible for credit or reimbursement for the Federal share of any work carried out by the non-Federal interest under this section.

    Inserted: (2) Eligibility for maintenance of navigation projects.--Subject to paragraph (4), and in accordance with section 211(h) of the Water Resources Development of Act of 1996 (33 U.S.C. 701b-13(h), whenever a non-Federal interest constructs improvements to a harbor or inland harbor under this section, the Secretary shall be responsible for maintenance of such harbor.

    Inserted: (3) Limitation.--Any activities carried out under this section are authorized only to the extent specifically provided for in subsequent appropriations Acts.

    Inserted: (4) Implementation.--Paragraphs (1), (2), and (3) shall not apply unless--

    Show 3 more inserted paragraphs

    Inserted: (A) all laws and regulations that would apply to the Secretary if the Secretary were carrying out the project were applied by the non-Federal interest during construction of the project; and

    Inserted: (B) the project is subsequently specifically authorized by Congress.

    Inserted: (5) In-kind contributions.--Absent a specific subsequent authorization by Congress, the non-Federal interest shall not be reimbursed or receive credit for in-kind contributions.

    Original wording

    Page 46, after line 23, insert the following:

  5. Change 5: Inserts new text on page 75, line 12

    Inserted: (3) review and evaluate the historic and potential uses, and economic feasibility for the life of the project, of nonstructural alternatives, including natural features such as dunes, coastal wetlands, floodplains, marshes, and mangroves, to reduce the damage caused by floods, storm surges, winds, and other aspects of extreme weather events, and to increase the resiliency and long-term cost-effectiveness of water resources development projects;

    Original wording

    Page 75, after line 12, insert the following:

  6. Change 6: Replaces “section 102(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2212(a))” with “section 3(a)(6) of the Water Resources Development Act of 1988 (102 Stat. 4013)”

    ReplacesPage 128, line 13Printed page

    In H.R. 3080 · Reported in House

    (a) Olmsted Project Reform.--

    (1) In general.--Notwithstanding section [struck: 102][inserted: 3](a)[inserted: (6)] of the Water Resources Development Act of [struck: 1986][inserted: 1988] ([struck: 33 U.S.C][inserted: 102 Stat]. [struck: 2212(a][inserted: 4013])[struck: )], for each fiscal year beginning after the date of enactment of this Act, 25 percent of the cost of construction for the Olmsted Project shall be paid from amounts appropriated from the Inland Waterways Trust Fund.

    (2) Definition.--In this subsection the term "Olmsted Project" means the project for navigation, Lower Ohio River, Locks 52 and 53, Illinois and Kentucky, authorized by section 3(a)(6) of the Water Resources Development Act of 1988 (102 Stat. 4013).

    Original wording

    Page 128, beginning on line 13, strike “section 102(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2212(a))” and insert “section 3(a)(6) of the Water Resources Development Act of 1988 (102 Stat. 4013)”.

  7. Change 7: Strikes page 163, lines 1–8

    Removes page 163, lines 1–8 of the printed bill. See that page

    Original wording

    Page 163, strike lines 1 through 8.

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

Page 6, line 14, after “company” insert “or natural gas company”.

Page 33, after line 20, insert the following:

SEC. __. EXPEDITED COMPLETION OF REPORTS.

The Secretary shall--

(1) expedite the completion of any on-going feasibility study for a project initiated before the date of enactment of this Act; and

(2) if the Secretary determines that the project is justified in a completed report, proceed directly to preconstruction planning, engineering, and design of the project in accordance with section 910 of the Water Resources Development Act of 1986 (100 Stat. 4189).

Page 42, after line 23, add the following:

(g) Saving Provision.--Nothing in this section may be construed to affect any agreement entered into under section 204(f) of the Water Resources Development Act of 1986 (33 U.S.C. 2232(f)) before the date of enactment of this Act.

Page 46, after line 23, insert the following:

SEC. __. CONTRIBUTIONS BY NON-FEDERAL INTERESTS PRIOR TO AUTHORIZATION OF FINAL FEASIBILITY REPORTS.

(a) In General.--Subject to subsection (b), a non-Federal interest may carry out a project for which--

(1) a final feasibility report has been completed; and

(2) authority for the Secretary to carry out such project has not specifically been authorized by Congress.

(b) Conditions.--The non-Federal interest--

(1) shall, before carrying out the project, obtain any permit, approval, or authorization required pursuant to Federal or State law; and

(2) shall carry out the project in accordance with the plan, and subject to the conditions, described in the final feasibility report.

(c) Credit, Reimbursement, and Future Maintenance.--

(1) Eligibility for credit or reimbursement.--Subject to paragraph (4), and in accordance with section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d-5b), a non-Federal interest may be eligible for credit or reimbursement for the Federal share of any work carried out by the non-Federal interest under this section.

(2) Eligibility for maintenance of navigation projects.--Subject to paragraph (4), and in accordance with section 211(h) of the Water Resources Development of Act of 1996 (33 U.S.C. 701b-13(h), whenever a non-Federal interest constructs improvements to a harbor or inland harbor under this section, the Secretary shall be responsible for maintenance of such harbor.

(3) Limitation.--Any activities carried out under this section are authorized only to the extent specifically provided for in subsequent appropriations Acts.

(4) Implementation.--Paragraphs (1), (2), and (3) shall not apply unless--

(A) all laws and regulations that would apply to the Secretary if the Secretary were carrying out the project were applied by the non-Federal interest during construction of the project; and

(B) the project is subsequently specifically authorized by Congress.

(5) In-kind contributions.--Absent a specific subsequent authorization by Congress, the non-Federal interest shall not be reimbursed or receive credit for in-kind contributions.

Page 75, after line 12, insert the following:

(3) review and evaluate the historic and potential uses, and economic feasibility for the life of the project, of nonstructural alternatives, including natural features such as dunes, coastal wetlands, floodplains, marshes, and mangroves, to reduce the damage caused by floods, storm surges, winds, and other aspects of extreme weather events, and to increase the resiliency and long-term cost-effectiveness of water resources development projects;

Page 128, beginning on line 13, strike “section 102(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2212(a))” and insert “section 3(a)(6) of the Water Resources Development Act of 1988 (102 Stat. 4013)”.

Page 163, strike lines 1 through 8.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

7 earlier actions
Floor Latest Action

House amendment offered

October 23, 2013

View full timeline
Floor

House amendment offered

October 23, 2013

Not Used

House amendment offered/reported by: Amendment (A001) offered by Mr. Gibbs.(consideration: CR H6738-6740; text: CR H6738-6739)

October 23, 2013 • 3:46 PM

Not Used

House amendment offered/reported by: Amendment (A001) offered by Mr. Gibbs.(consideration: CR H6738-6740; text: CR H6738-6739)

October 23, 2013 • 3:46 PM

Not Used

Amendment agreed to Committee of the Whole

October 23, 2013 • 3:55 PM

Floor

House amendment agreed to: On agreeing to the Gibbs amendment (A001) Agreed to by voice vote.

October 23, 2013 • 3:55 PM

Floor

House amendment agreed to: On agreeing to the Gibbs amendment (A001) Agreed to by voice vote.

October 23, 2013 • 3:55 PM

Floor

Amendment (A001) offered by Mr. Gibbs. (consideration: CR H6738-6740; text: CR H6738-6739)

October 23, 2013 • 3:46 PM

Floor

On agreeing to the Gibbs amendment (A001) Agreed to by voice vote.

October 23, 2013 • 3:55 PM