What it does: Adds SEC. __. INSTALLATION RENEWABLE ENERGY PROJECT DATABASE wherever appropriateWhat it changes
1 change to S. 2262
Adds SEC. __. INSTALLATION RENEWABLE ENERGY PROJECT DATABASE wherever appropriate
Adds a sectionInserted: SEC. __. INSTALLATION RENEWABLE ENERGY PROJECT DATABASE.
Inserted: (a) Limitation.--Not later than 90 days after the date of the enactment of this Act, the Secretary of Defense shall establish a searchable database to uniformly report information regarding installation renewable energy projects undertaken since 2010.
Inserted: (b) Elements.--The database established under subsection (a) shall include, for each installation energy project--
Inserted: (1) the estimated project costs;
Inserted: (2) estimated power generation;
Inserted: (3) estimated total cost savings;
Inserted: (4) estimated payback period;
Inserted: (5) total project costs;
Inserted: (6) actual power generation;
Inserted: (7) actual cost savings to date;
Inserted: (8) current operational status; and
Inserted: (9) access to relevant business case documents, including the economic viability assessment.
Show 1 more inserted paragraphShow less
Inserted: (c) Updates.--The database established under subsection (a) shall be updated not less than quarterly.
The amendment doesn't say where this goes; the clerk decides.
Original wording
At the appropriate place, insert the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
SA 3004. Mr. COBURN submitted an amendment intended to be proposed by him to the bill S. 2262, to promote energy savings in residential buildings and industry, and for other purposes; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. __. INSTALLATION RENEWABLE ENERGY PROJECT DATABASE.
(a) Limitation.--Not later than 90 days after the date of the enactment of this Act, the Secretary of Defense shall establish a searchable database to uniformly report information regarding installation renewable energy projects undertaken since 2010.
(b) Elements.--The database established under subsection (a) shall include, for each installation energy project--
(1) the estimated project costs;
(2) estimated power generation;
(3) estimated total cost savings;
(4) estimated payback period;
(5) total project costs;
(6) actual power generation;
(7) actual cost savings to date;
(8) current operational status; and
(9) access to relevant business case documents, including the economic viability assessment.
(c) Updates.--The database established under subsection (a) shall be updated not less than quarterly.
Legislative Activity