S.Amdt. 3036
Text
Submitted
SA 3036. Mr. TOOMEY (for himself and Mr. Casey) submitted an amendment intended to be proposed by him to the bill S. 2262, to promote energy savings in residential buildings and industry, and for other purposes; which was ordered to lie on the table; as follows:
At the beginning of title V, insert the following:
SEC. 5____. ELECTRIC GENERATING UNIT COMPLIANCE DELAY FOR CERTAIN EPA RULES.
(a) Definition of Coal Refuse.--
(1) In general.--In this section, the term “coal refuse” means any waste coal, rock, shale, slurry, culm, gob, boney, slate, clay and related materials, associated with or near a coal seam, that are--
(A) brought aboveground or otherwise removed from a coal mine in the process of mining coal; or
(B) separated from coal during cleaning or preparation operations.
(2) Inclusions.--The term “coal refuse” includes underground development waste, coal processing waste, and excess spoil.
(b) Compliance Delay.--An electric generating unit that uses coal refuse as the primary feedstock of the electric generating unit shall be exempt from the rule of the Environmental Protection Agency entitled “National Emission Standards for Hazardous Air Pollutants From Coal- and Oil-Fired Electric Utility Steam Generating Units and Standards of Performance for Fossil-Fuel-Fired Electric Utility, Industrial-Commercial-Institutional, and Small Industrial-Commercial-Institutional Steam Generating Units” (77 Fed. Reg. 9304 (February 16, 2012)) until December 31, 2017.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment submitted
May 7, 2014