What it changes

1 change to S. 601 · shown in the bill's text

Adds a section
  1. Adds SEC. 20__. VERDIGRIS RIVER BASIN WATER SUPPLY STORAGE CONTRACTS at the end of title II

    Adds a section

    In S. 601 · Reported to Senate

    (c) Report.--Not later than 1 year after the date of enactment of this Act, the Comptroller General of the United States shall submit to Congress a report based on the study under subsection (a) with the recommendations of the Comptroller General on whether the repairs carried out at dams on the Cumberland River should have been classified as repairs carried out under the National Dam Safety Program Act (33 U.S.C. 467 et seq.).

    Inserted: SEC. 20__. VERDIGRIS RIVER BASIN WATER SUPPLY STORAGE CONTRACTS.

    Inserted: Notwithstanding any other provision of law, any community entity that is a party to a contract in effect on the date of enactment of this Act for water supply storage on a nonhydropower lake within the Verdigris River Basin shall be required to pay not more than the contractual rate per acre-foot (as in effect on the date of enactment of this Act) in entering into a contract for new water supply storage in a nonhydropower lake within the Verdigris River Basin.

    Original wording

    At the end of title II, add the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 798. Mr. INHOFE submitted an amendment intended to be proposed by him to the bill S. 601, to provide for the conservation and development of water and related resources, to authorize the Secretary of the Army to construct various projects for improvements to rivers and harbors of the United States, and for other purposes; which was ordered to lie on the table; as follows:

At the end of title II, add the following:

SEC. 20__. VERDIGRIS RIVER BASIN WATER SUPPLY STORAGE CONTRACTS.

Notwithstanding any other provision of law, any community entity that is a party to a contract in effect on the date of enactment of this Act for water supply storage on a nonhydropower lake within the Verdigris River Basin shall be required to pay not more than the contractual rate per acre-foot (as in effect on the date of enactment of this Act) in entering into a contract for new water supply storage in a nonhydropower lake within the Verdigris River Basin.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

Floor Latest Action

Senate amendment submitted

May 7, 2013