H.Amdt. 711House115th Congress (2017-2019)

An amendment numbered 52 printed in Part A of House Report 115-711 to expedite the completion of a disposition study and requires the Secretary to report on the feasibility of preserving and uenhancing recreational opportunities and the health of the ecosystem of Upper St. Anthony Falls Lock and Dam.

What it does: 4 changes: replaces text in 2 places, strikes text in 2 places
Submitted June 6, 2018

What it changes

4 changes to H.R. 8 · 2 shown in the bill's text

Replaces text in 2 placesStrikes text in 2 places

We couldn't read part of this amendment. That part is shown as written below.

  1. Change 1: Replaces “the Secretary may not complete” through “of the Senate on--” with “the Secretary shall expedite completion of such study and shall produce a report on the U…”

    ReplacesPage 54, lines 5–9Printed page

    In H.R. 8 · Reported in House

    (d) Upper Mississippi River Protection.--Section 2010 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1270) is amended by adding at the end the following:

    "(d) Considerations.--In carrying out a disposition study with respect to the Upper St. Anthony Falls Lock and Dam, including a disposition study under section 216 of the Flood Control Act of 1970 (33 U.S.C. 549a), the Secretary [struck: may not complete ][inserted: shall expedite completion of ]such study [struck: until the Secretary considers, ]and [struck: issues ][inserted: shall produce ]a report [struck: to][inserted: on] the [struck: Committee on Transportation and Infrastructure of the House of Representatives and the Committee][inserted: Upper St. Anthony Falls Lock and Dam that is separate from any report] on [struck: Environment and Public Works of the Senate on][inserted: any other lock or dam included in such study that includes plans for]--

    "(1) the feasibility of carrying out modifications to the Upper St. Anthony Falls Lock and Dam to--

    Original wording

    Page 54, beginning on line 5, strike “the Secretary may not complete” and all that follows through “of the Senate on--” on line 9 and insert “the Secretary shall expedite completion of such study and shall produce a report on the Upper St. Anthony Falls Lock and Dam that is separate from any report on any other lock or dam included in such study that includes plans for--”.

  2. Change 2: Strikes “the feasibility of”

    StrikesPage 54, line 10Printed page

    Struck: the feasibility of

    Original wording

    Page 54, line 10, strike “the feasibility of”.

  3. Change 3: Strikes “and”

    StrikesPage 54, line 15Printed page

    Struck: and

    Original wording

    Page 54, line 15, strike “and”.

  4. Change 4: Replaces “the preservation of” with “a partial disposition of the Upper St. Anthony Falls Lock and Dam facility and surroundin…”

    ReplacesPage 54, line 16Printed page

    In H.R. 8 · Reported in House

    "(B) maintain the benefits to the natural ecosystem and human environment; and

    "(2) [struck: the preservation ][inserted: a partial disposition ]of [inserted: the Upper St. Anthony Falls Lock and Dam facility and surrounding real property that preserves ]any portion of the Upper St. Anthony Falls Lock and Dam necessary to maintain flood control.".

    TITLE III--DEAUTHORIZATIONS, MODIFICATIONS, AND RELATED PROVISIONS

    Original wording

    Page 54, line 16, strike “the preservation of” and insert “a partial disposition of the Upper St. Anthony Falls Lock and Dam facility and surrounding real property that preserves”.

Shown as written

Page 54, line 18, strike the first period and insert “; and” and strike the closing quotation marks and second period and insert the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

Page 54, beginning on line 5, strike “the Secretary may not complete” and all that follows through “of the Senate on--” on line 9 and insert “the Secretary shall expedite completion of such study and shall produce a report on the Upper St. Anthony Falls Lock and Dam that is separate from any report on any other lock or dam included in such study that includes plans for--”.

Page 54, line 10, strike “the feasibility of”.

Page 54, line 15, strike “and”.

Page 54, line 16, strike “the preservation of” and insert “a partial disposition of the Upper St. Anthony Falls Lock and Dam facility and surrounding real property that preserves”.

Page 54, line 18, strike the first period and insert “; and” and strike the closing quotation marks and second period and insert the following:

“(3) expediting the disposition described in this subsection (d).”.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

5 earlier actions
Floor Latest Action

House amendment offered

June 6, 2018

View full timeline
Floor

House amendment offered

June 6, 2018

Not Used

House amendment offered/reported by: Amendment (A051) offered by Mr. Paulsen.(consideration: CR H4841-4842; text: CR H4841)

June 6, 2018 • 6:33 PM

Not Used

Amendment agreed to Committee of the Whole

June 6, 2018 • 6:36 PM

Floor

House amendment agreed to: On agreeing to the Paulsen amendment (A051) Agreed to by voice vote.

June 6, 2018 • 6:36 PM

Floor

Amendment (A051) offered by Mr. Paulsen. (consideration: CR H4841-4842; text: CR H4841)

June 6, 2018 • 6:33 PM

Floor

On agreeing to the Paulsen amendment (A051) Agreed to by voice vote.

June 6, 2018 • 6:36 PM