What it changes

1 change to S.Amdt. 5499 · shown in S.Amdt. 5499's text

Adds a section
  1. Adds SEC. 848. REPORT ON INDUSTRIAL BASE CAPACITY TO SUPPORT PLANNED OVERHEAD PERSISTENT INFRARED ENTERPRISE ARCHITECTURE PROGRAMS at the end of subtitle C of title VIII

    Adds a section

    In S.Amdt. 5499 as proposed

    "222d. Annual report on industrial base constraints for munitions.

    Inserted: SEC. 848. REPORT ON INDUSTRIAL BASE CAPACITY TO SUPPORT PLANNED OVERHEAD PERSISTENT INFRARED ENTERPRISE ARCHITECTURE PROGRAMS.

    Inserted: (a) In General.--Not later than 180 days after the date of the enactment of this Act, the Under Secretary of Defense for Acquisition and Sustainment shall submit to the congressional defense committees a report assessing the industrial base capacity to support planned overhead persistent infrared enterprise architecture programs, including--

    Inserted: (1) Next Generation OPIR Block 0; and

    Inserted: (2) Resilient Missile Warning Missile Tracking.

    Inserted: (b) Form.--The report required under subsection (a) shall be submitted in unclassified form, but may include a classified annex.

    Original wording

    At the end of subtitle C of title VIII, add the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 6044. Mrs. FISCHER submitted an amendment intended to be proposed to amendment SA 5499 submitted by Mr. Reed (for himself and Mr. Inhofe) and intended to be proposed to the bill H.R. 7900, to authorize appropriations for fiscal year 2023 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows:

At the end of subtitle C of title VIII, add the following:

SEC. 848. REPORT ON INDUSTRIAL BASE CAPACITY TO SUPPORT PLANNED OVERHEAD PERSISTENT INFRARED ENTERPRISE ARCHITECTURE PROGRAMS.

(a) In General.--Not later than 180 days after the date of the enactment of this Act, the Under Secretary of Defense for Acquisition and Sustainment shall submit to the congressional defense committees a report assessing the industrial base capacity to support planned overhead persistent infrared enterprise architecture programs, including--

(1) Next Generation OPIR Block 0; and

(2) Resilient Missile Warning Missile Tracking.

(b) Form.--The report required under subsection (a) shall be submitted in unclassified form, but may include a classified annex.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

Floor Latest Action

Senate amendment submitted

September 29, 2022