S.Amdt. 6378
What it does: Adds SEC. 1064. DIVERSION DAM AND PIPELINE, MISSISSIPPI RIVER AND COLUMBIA RIVER at the end of subtitle F of title XWhat it changes
1 change to S.Amdt. 5499 · shown in S.Amdt. 5499's text
Adds SEC. 1064. DIVERSION DAM AND PIPELINE, MISSISSIPPI RIVER AND COLUMBIA RIVER at the end of subtitle F of title X
Adds a sectionIn S.Amdt. 5499 as proposed
(2) in paragraph (3), by striking "180 days after" and inserting "one year after".
Inserted: SEC. 1064. DIVERSION DAM AND PIPELINE, MISSISSIPPI RIVER AND COLUMBIA RIVER.
Inserted: Notwithstanding section 715(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2265(a)), the Secretary of the Army, acting through the Assistant Secretary for Civil Works, and the Secretary of the Interior, acting through the Commissioner of Reclamation, shall carry out a technological and feasibility study on the transfer of water to the Colorado River Basin from--
Inserted: (1) the Columbia River Basin; and
Inserted: (2) the Mississippi River Basin, to prevent flood damage along the Mississippi River and its tributaries.
Original wording
At the end of subtitle F of title X, add the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
SA 6378. Ms. LUMMIS (for herself and Mr. Kelly) submitted an amendment intended to be proposed to amendment SA 5499 submitted by Mr. Reed (for himself and Mr. Inhofe) and intended to be proposed to the bill H.R. 7900, to authorize appropriations for fiscal year 2023 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows:
At the end of subtitle F of title X, add the following:
SEC. 1064. DIVERSION DAM AND PIPELINE, MISSISSIPPI RIVER AND COLUMBIA RIVER.
Notwithstanding section 715(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2265(a)), the Secretary of the Army, acting through the Assistant Secretary for Civil Works, and the Secretary of the Interior, acting through the Commissioner of Reclamation, shall carry out a technological and feasibility study on the transfer of water to the Colorado River Basin from--
(1) the Columbia River Basin; and
(2) the Mississippi River Basin, to prevent flood damage along the Mississippi River and its tributaries.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment submitted
September 29, 2022