S.Amdt. 1056Senate118th Congress (2023-2025)
S.Amdt. 1056
Sponsored by
Sen. Roger F. Wicker (R-MS)
Submitted July 26, 2023
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
July 26, 2023
View full timeline
Floor
Senate amendment submitted
July 26, 2023
Floor
Senate amendment submitted
July 26, 2023
Text
Submitted
SA 1056. Mr. WICKER (for himself and Mr. Graham) submitted an amendment intended to be proposed by him to the bill S. 2226, to authorize appropriations for fiscal year 2024 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place in the funding tables, insert the following to raise the topline for implementation of the National Defense Strategy and for other purposes: -------------------------------------------------------------------------------------------------------------------------------------------------------- FY24 AMT ACCOUNT LINE PE SAG ($1000S) TITLE/STUB ENTRY UFR? -------------------------------------------------------------------------------------------------------------------------------------------------------- MSLS................................... 6 .......................... ........... $314.2 PrSM (Inc 1) production .............. increase. AMMO................................... 36 .......................... ........... $20.0 M795 155mm artillery .............. projectile production. RDA.................................... ........... 0604802A.................. ........... $20.0 Low-drag artillery .............. guidance kit (XM1210 LR PGK). MSLS................................... 20 .......................... ........... $20.0 SB600 production increase .............. PDW.................................... 78 .......................... ........... $10.9 Marinized SB600.......... .............. MSLS................................... 17 .......................... ........... $350.0 Additional 1 Patriot fire .............. unit. RDDW................................... ........... 0603881C.................. ........... $108.0 All Domain Missile .............. Warning and Missile Tracking Architecture (THAAD). MSLS................................... 10 .......................... ........... $36.0 JAGM capacity expansion.. .............. RDA.................................... ........... 02065778A................. ........... $67.0 GMLRS-ER capacity .............. expansion. RDA.................................... ........... 0604611A.................. ........... $29.1 Javelin RDTE for F-model .............. auto gate/fast launch. MSLS................................... 22 .......................... ........... $87.6 Stinger capacity .............. expansion--obsolescence. PANMC.................................. 15 .......................... ........... $350.0 Coyote production .............. increase. RDA.................................... ........... 1160402BB................. ........... $27.3 Palletized Field .............. Artillery Launcher. RDN.................................... ........... 0604227N.................. ........... $50.0 Harpoon--seeker .............. development obsolescence issues. WPN.................................... 23 .......................... ........... $20.0 Harpoon--additional test .............. equipment for production and missile recert. WPN.................................... 20 .......................... ........... $152.0 AARGM-ER production .............. increase. WPN.................................... 20 .......................... ........... $34.0 AARGM-ER special test .............. equipment. WPN.................................... 16 .......................... ........... $40.0 NSM production increase.. .............. WPN.................................... 7 .......................... ........... $180.0 SM-6 obsolescence .............. steering & control. WPN.................................... 7 .......................... ........... $30.0 SM-6 obsolescence Plate .............. 3A. WPN.................................... 4 .......................... ........... $20.0 Tomahawk BlkV throughput .............. expansion. PDW.................................... 33 .......................... ........... $63.0 SM-3 Block IIA capacity .............. expansion. PDW.................................... 33 .......................... ........... $140.0 SM-3 Block IIA .............. obsolescence. WPN.................................... 27 .......................... ........... $65.0 Mk48 Mod 7 AUR and .............. Technology Expansion Program. WPN.................................... 27 .......................... ........... $40.0 Mk48 Mod 7 further .............. obsolescence fixes. WPN.................................... 29 .......................... ........... $121.1 Mk54 Mod 1 kit........... .............. WPN.................................... 29 .......................... ........... $18.6 Mk54 HAAWC kit........... .............. WPN.................................... 31 .......................... ........... $10.0 Indian Head explosive .............. fill production expansion. RDN.................................... ........... 0604601N.................. ........... $10.0 Indian Head underwater .............. fill testing/quals completion. RDN.................................... ........... 0604601N.................. ........... $15.0 Hammerhead capability.... .............. RDN.................................... ........... 9999...................... ........... $60.0 Classified program....... .............. WPN.................................... 31 .......................... ........... $7.5 Mk68..................... .............. WPN.................................... 31 .......................... ........... $0.4 Mk68 obsolescence........ .............. RDN.................................... ........... 0603782N.................. ........... $10.0 ONR capability .............. acceleration. RDN.................................... 51 0603582N.................. ........... $19.6 PAC-3 MSE/Aegis .............. integration. MPAF................................... 16 .......................... ........... $217.3 GLSDB risk mitigation of .............. current GFE--sensor/ shooter. MPAF................................... 8 .......................... ........... $160.0 Joint Strike Missile .............. production increase and test equipment. MPAF................................... 12 .......................... ........... $20.0 AMRAAM AP................ .............. WPN.................................... 6 .......................... ........... $60.0 AIM-9X capacity expansion .............. WPN.................................... 6 .......................... ........... $130.0 AIM-9X production .............. increase (Navy). MPAF................................... 6 .......................... ........... $130.0 AIM-9X production .............. increase (AF). MPAF................................... 9 .......................... ........... $35.0 SDB II capacity expansion .............. to 2100. MPAF................................... 9 .......................... ........... $70.0 SDB II capacity expansion .............. to 3000. OPN.................................... 63 .......................... ........... $100.0 Phoenix Ghost CP200...... .............. WPN.................................... 22 .......................... ........... $38.0 ABL energetics expansion .............. (GMLRS, PrSM, PAC-3, etc). WPN.................................... 23 .......................... ........... $125.0 Expansion of solid rocket .............. motor industrial base. RDDW................................... ........... 0602000D8Z................ ........... $35.0 CL-20.................... .............. MPAF................................... 0708011F .......................... ........... $150.0 Defense Industrial Base .............. (DIB) Expansion for. Industrial Preparedness/ Pollution Prevention AFP- 44. RDDW................................... ........... 0605022D8Z................ ........... $15.0 Defense exportability .............. features. RDAF................................... ........... 0604183F.................. ........... $133.4 HACM acceleration........ .............. RDN.................................... ........... 0605518N.................. ........... $25.0 Mach-TB increase......... .............. RDDW................................... ........... 0603766E.................. ........... $120.0 Assault Breaker II 4x LOE .............. acceleration. RDSF................................... 9999 .......................... ........... $20.0 Classified space add..... .............. RDSF................................... ........... 1206310SF................. ........... $30.0 Narrowband antenna on- .............. orbit demonstration. RDSF................................... ........... 1206616SF................. ........... $70.0 Cislunar space domain .............. awareness. PSF.................................... 22 .......................... ........... $108.0 One additional space .............. launch. RDDW................................... ........... 0603133D8Z................ ........... $25.0 Foreign Comparative .............. Testing. RDDW................................... ........... 0604250D8Z................ ........... $46.0 Maintain SCO level of .............. effort. RDDW................................... ........... 0601101E.................. ........... $25.0 NSCAI generative AI...... .............. RDDW................................... ........... 0602303E.................. ........... $50.0 NSCAI generative AI...... .............. RDDW................................... ........... 0601101E.................. ........... $16.5 NSCAI AI for Cyber....... .............. RDDW................................... ........... 0602303E.................. ........... $42.9 NSCAI AI for Cyber....... .............. RDDW................................... ........... 0603760E.................. ........... $6.6 NSCAI AI for Cyber....... .............. OMDW................................... ........... .......................... DS1 $200.0 National Defense .............. Stockpile Transaction Fund increase. [[Page S3645]] RDDW................................... ........... 0901579D8Z................ ........... $(30.0) Transfer to pilot .............. program--Protecting Access to Critical Assets. RDDW................................... ........... 0901579D8Z................ ........... $30.0 Transfer from Office of .............. Strategic Capital for pilot program on Protecting Access to Critical Assets. RDDW................................... ........... 0604250D8Z................ ........... $25.0 Pele microreactor........ .............. RDA.................................... ........... 0603119A.................. ........... $2.8 Contested Logistics: .............. Autonomous Self Perception Combat Engineer Program (ASCEP). RDDW................................... ........... 0603896C.................. ........... $19.0 Ballistic Missile Defense .............. C2BMC (MD01). 4701................................... ........... 18-D-650.................. ........... $73.3 Tritium Finishing .............. Facility, SRS. 4701................................... ........... .......................... ........... $28.1 B83 Stockpile Systems.... .............. 4701................................... ........... .......................... ........... $341.8 Savannah River Pit .............. Production. MILCON................................. ........... .......................... ........... $695.0 FY25 UFRs (for display .............. purposes--text below). MILCON................................. ........... .......................... ........... $1,691.0 FY24 MILCON UFRs (for .............. display purposes--text below). OMA.................................... ........... .......................... 132 $1,652.0 Army FSRM to 100%........ .............. OMN.................................... ........... .......................... BSM1 $650.0 Navy FSRM to 100%........ .............. OMMC................................... ........... .......................... BSM1 $1,415.0 Marine Corps FSRM to 100% .............. OMARNG................................. ........... .......................... 011R $1,375.0 Air Force FSRM to 100%... .............. OMDW................................... ........... .......................... 4GTM $65.0 Defense Community .............. Infrastructure Program. OMAF................................... ........... .......................... 42A $2.0 Program increase for .............. operational energy. OMDW................................... UNDIS .......................... ........... $1,200.0 Fuel price increases .............. (FY23 + Fy24). SCN.................................... 10 .......................... ........... $928.0 DDG-51 prior-year CTC.... .............. SCN.................................... 11 .......................... ........... $300.0 Surface ship supplier .............. base. SCN.................................... 11 .......................... ........... $280.0 DDG-51 AP................ APN.................................... 62 .......................... ........... $132.0 F-35B/C engine spares.... .............. APN.................................... 6 .......................... ........... $250.0 FD2030--CH-53K +1 a/c.... .............. RDN.................................... ........... 0603207N.................. ........... $10.0 Task Force 59 long- .............. endurance USV experimentation. RDAF................................... ........... 0207138F.................. ........... $35.0 F-22 open system .............. architecture for CCA. OPAF................................... 9999 .......................... ........... $200.0 Classified program....... .............. OPAF................................... 9999 .......................... ........... $150.0 Classified program....... .............. RDN.................................... ........... 0604378N.................. ........... $22.5 Stratospheric balloon .............. research--JTRS. OPAF................................... 9999 .......................... ........... $40.0 Classified program....... .............. APN.................................... 56 .......................... ........... $72.6 NGJ +2 additional .............. shipsets. OMAF................................... ........... .......................... MULTIPLE $470.3 F-22 WSS (prevent .............. divestment). APAF................................... 11 .......................... ........... $240.0 MH-139A.................. .............. RDAF................................... ........... 0207110F.................. ........... $50.0 Next-Gen Advanced .............. Propulsion. APAF................................... 3 .......................... ........... $618.3 F-35A test jets (6 a/c).. .............. RDAF................................... ........... 0207253F.................. ........... $49.0 Compass Call RDTE sim.... .............. RDAF................................... ........... 0207133F.................. ........... $49.1 Advanced F-16 EW .............. protection/attack. APAF................................... ........... 26........................ ........... $130.5 Advanced F-16 EW .............. protection/attack. OPA.................................... 71 .......................... ........... $68.5 ENVG-B................... .............. OMDW................................... ........... .......................... 1FU1 $15.0 JTF-N.................... .............. RDDW................................... ........... 63375D8Z.................. ........... $30.0 Directed Energy Threat .............. Research. RDDW................................... ........... 33140D8Z.................. ........... 20.0 NSA Cyber Workforce Pilot .............. Program. OMARNG................................. ........... .......................... 153 $12.0 Army National Guard .............. Mission Assurance Program. RDDW................................... ........... 9999...................... ........... $17.0 All-domain Anomaly .............. Resolution Office. RDN.................................... ........... 0604558N.................. ........... $7.0 Advanced Submarine .............. Control Using Precision Maneuvering Unit. OMDW................................... ........... .......................... 012D $10.0 Southeast Asia Cyber .............. Pilot Expansion. OMARNG................................. ........... .......................... 121 $21.5 Exercise Northern Strike. .............. PMC.................................... 40 .......................... ........... $26.0 Low cost unmanned .............. aerospace vehicle (PAACK- P). OPA.................................... 86 .......................... ........... $77.0 IBCS--integration Army #1 acceleration for INDOPACOM. MSLS................................... 3 .......................... ........... $22.7 M-SHORAD Increment 1-- Army #2 expand capacity of existing batteries. OPA.................................... 60 .......................... ........... $81.2 Trojan SPIRIT............ Army #3 OMA.................................... ........... .......................... 121 $102.5 Expanding INDOPACOM Army #6 Campaigning Activities. AMMO................................... 36 .......................... ........... 21.5 Water intake pump Army #10 upgades, Radford AAP. RDA.................................... ........... 0604804A.................. ........... $21.2 Maneuver support vessel Army #11 (heavy). ACFT................................... 8 .......................... ........... $62.1 Black Hawk (HH-60M) Army #25 replacement--MEDEVAC. RDN.................................... ........... 0604038N.................. ........... $45.3 Maritime Targeting Cell Navy #1 Afloat (MTC-A) Development. RDN.................................... ........... 0604234N.................. ........... $249.3 Fund E-2D Theater Combat Navy #2 ID and HECTR. OPN.................................... 16 .......................... ........... $61.9 Fund ZEUS for DDG-1000 Navy #3 Class. RDN.................................... ........... 0204202N.................. ........... $124.5 Fund ZEUS for DDG-1000 Navy #3 Class. OMN.................................... ........... .......................... 1C1C $4.0 VIOLET................... Navy #4 OPN.................................... 78 .......................... ........... $1.2 VIOLET................... Navy #4 RDN.................................... ........... 0101402N.................. ........... $20.4 VIOLET................... Navy #4 OMN.................................... ........... .......................... BSM1 $300.0 Dry Dock Repairs at PSNS Navy #5 Investment. Restoration and Modernization (RM). OMN.................................... ........... .......................... BSM1 $250.0 Targeted Facilities Navy #6 Sustainment, Restoration and. Modernization (FSRM) Investment. OMN.................................... ........... .......................... BSM1 $300.0 Targeted Facilities Navy #6 Sustainment, Restoration and. Modernization (FSRM) Investment. SCN.................................... 32 .......................... ........... $208.1 DDG-51 SEWIP Blk III (DDG Navy #7 136-137). SCN.................................... 3 .......................... ........... $170.0 CVN 75 and CVN 80 SEWIP Navy #8 Blk III. SCN.................................... 7 .......................... ........... $94.0 CVN 75 and CVN 80 SEWIP Navy #8 Blk III. APN.................................... 15 .......................... ........... $118.8 Navy Unique Fleet Navy #9 Essential Airlift Logistics KC-130J (+1 A/ C Reserve). APN.................................... 62 .......................... ........... $93.0 CH-53K Initial and USMC #2 Outfitting Spares. PMC.................................... 43 .......................... ........... $21.1 Project 7/11--Modular USMC #3 Operations Cells. APN.................................... 16 .......................... ........... $252.9 (+2) KC-130J Aircraft and USMC #4 Initial Spares. PMC.................................... 25 .......................... ........... $5.1 Distributed Common Ground/ USMC #5 Surface System-. Marine Corps (DCGS-MC) All-. Source SCI Workstations.. Family of Field Medical Equipment (FFME). PMC.................................... 50 .......................... ........... $11.0 Damage Control USMC #6 Resuscitation. (DCR) and Damage Control Surgery (DCS). Equipment Sets........... PMC.................................... 19 .......................... ........... $160.0 (+4) AN/TPS-80 G/ATOR USMC #7 Radar. [[Page S3646]] RDN.................................... ........... 0206313M.................. ........... $16.3 Satellite Communications USMC #8 Terminal, Network-on-. the-Move (NOTM).......... Digital Interoperability (DI)--Marine Agile. RDN.................................... ........... 0605217N.................. ........... $78.5 Network Gateway Link USMC #11 (MANGL) Roll-Up. PMC.................................... 54 .......................... ........... $21.0 Ultra-Light-Weight USMC #12 Camouflage Netting System (ULCANS). PMC.................................... 17 .......................... ........... $5.1 Joint All Domain Command USMC #13 and Control (JADC2) Testing, Evaluation and Engineering Environment. APN.................................... 68 .......................... ........... $122.4 (+4) F-35B Engine/Lift USMC #14 System USMC Spares. PMC.................................... 48 .......................... ........... $8.0 Demolition Equipment Set, USMC #19 Squad. Engineer/Explosive Hazard Defeat Systems. APN.................................... 68 .......................... ........... $67.5 (+3) UC-12W(ER) USMC #20 Beechcraft King Air 350ER with Cargo Door and Initial Spares. PMC.................................... 52 .......................... ........... $10.0 Multi-Terrain Loader-- USMC #21 Replacement. APAF................................... 52 .......................... ........... $596.2 Accelerate E-7 delivery.. AF #1 RDAF................................... ........... 0604007F.................. ........... $37.2 Accelerate E-7 delivery.. AF #1 OMAF................................... ........... .......................... 012C $0.7 (OI-3) Fund ISR Digital AF #4 Infrastructure. OMAF................................... ........... .......................... 012C $58.6 (OI-3) Fund ISR Digital AF #4 Infrastructure. RDAF................................... ........... 0207431F.................. ........... $1.2 (OI-3) Fund ISR Digital AF #4 Infrastructure. RDAF................................... ........... 0207431F.................. ........... $13.8 (OI-3) Fund ISR Digital AF #4 Infrastructure. RDAF................................... ........... 0207431F.................. $6.2 (OI-3) Fund AF #4.................... ISR Digital Infrastructure RDAF................................... ........... 0207431F.................. ........... $5.9 (OI-3) Fund ISR Digital AF #4 Infrastructure. RDAF................................... 66 .......................... ........... $15.9 (OI-3) Fund ISR Digital AF #4 Infrastructure. OPAF................................... ........... 0305208F.................. ........... $5.0 (OI-3) Fund ISR Digital AF #4 Infrastructure. RDAF................................... ........... .......................... ........... $10.6 (OI-3) Fund ISR Digital AF #4 Infrastructure. OMAF................................... ........... 9999...................... 011C $12.1 (OI-3) Fund ISR Digital USSF #3 Infrastructure. RDSF................................... ........... 9999...................... ........... $13.0 Classified Program D..... USSF #4 RDSF................................... ........... 9999...................... ........... $105.0 Classified Program E..... USSF #5 RDSF................................... ........... 9999...................... ........... $90.0 Classified Program F..... USSF #6 RDSF................................... 56 1203040SF................. ........... $43.0 DCO-S.................... USSF #7 RDDW................................... ........... 0604181C.................. ........... $298.0 Glide Phase Interceptor.. MDA #3 RDDW................................... ........... 0603891C.................. ........... 22.9 Classified Program A/ MDA #1 Novel countermeasure against hypersonic threats. RDDW................................... ........... 0603906C.................. ........... $15.0 Classified Program B..... MDA #2 RDDW................................... ........... 0603914C.................. ........... $34.7 Pacific Collector/Pacific MDA #7 Tracker Replacement. Planning & Engineering... RDDW................................... ........... 0603914C.................. ........... $315.3 Pacific Collector MDA #8 Replacement. RDDW................................... ........... 0603891C.................. ........... $32.2 Left Through Right of MDA #4 Launch Integration/ Antenna, software development & C2BMC integration. RDDW................................... ........... 0603890C.................. ........... $12.4 Electronic Attack/ MDA #6 Electronic Protection. RDDW................................... ........... 0603891C.................. ........... $27.3 Electronic Warfare for MDA #9 Missile Defense. OPN.................................... 126 .......................... ........... $36.9 Somalia presistent AFRICOM #1 presence. OMA.................................... ........... .......................... 411 $95.3 Contract ISR............. AFRICOM #2 OMA.................................... ........... .......................... 411 $2.1 Contract ISR............. AFRICOM #2 OMA.................................... ........... .......................... 411 $4.7 Contract ISR............. AFRICOM #2 RDA.................................... ........... 0603766A.................. ........... $14.7 Air Vigilance O&S........ CENTCOM #1 RDAF................................... ........... 0207247F.................. ........... $15.0 AF TENCAP Crestone CENTCOM #1 Database. OMAF................................... ........... .......................... 015F $16.0 GPN-CENT................. CENTCOM #2 OMAF................................... ........... .......................... 015F $8.0 Data analysis and AI CENTCOM #3 initiative. OMAF................................... ........... .......................... 015F $34.0 MSS licenses............. CENTCOM #3 OMAF................................... ........... .......................... 015F $30.0 Cloud transition......... CENTCOM #3 ........... 0303055F.................. 011Z $81.2 European Communications EUCOM #1 Infrastructure. ........... 0207522F.................. 012C $78.3 Air Based Air Defense.... EUCOM #2 RDDW................................... ........... 0604331D8Z................ ........... $174.0 Joint Fires Network (JFN) INDOPACOM #1 RDDW................................... ........... 0604102C.................. ........... $147.0 Guam Defense System...... INDOPACOM #2 OMAF................................... ........... .......................... 011C $90.0 INDOPACOM Campaigning.... INDOPACOM #5 OMMC................................... ........... .......................... 1A1A $8.0 INDOPACOM Campaigning.... INDOPACOM #5 OMN.................................... ........... .......................... 1CCM $36.0 INDOPACOM Campaigning.... INDOPACOM #5 OMN.................................... ........... .......................... 1CCM $49.0 Joint Training Team...... INDOPACOM #9 OMN.................................... ........... .......................... 1CCM $25.5 Joint Task Force INDOPACOM #10 Micronesia. RDDW................................... ........... 0604331D8Z................ ........... $10.0 Joint Experimentation and INDOPACOM #12 Innovation. OMN.................................... ........... .......................... 1CCM $9.0 Joint Experimentation and INDOPACOM #12 Innovation. OPN.................................... 43 .......................... ........... $117.0 Persistent Targeting for INDOPACOM #17 Undersea. OMN.................................... ........... .......................... 1CCM $9.0 Joint Task Force Indo- INDOPACOM #24 Pacific (JTF-IP). OMN.................................... ........... .......................... 1CCM $5.0 Headquarters Manpower INDOPACOM #26 Enhancements. OMDW................................... ........... .......................... 8PLI $69.9 Joint Training, Exercise INDOPACOM #27 and Evaluation Program. (JTEEP).................. RDAF................................... ........... 0604617F.................. ........... $4.5 Arctic capable prepo NORTHCOM #1 shelters. RDAF................................... ........... 0604617F.................. ........... $5.5 Arctic capable prepo NORTHCOM #1 shelters. OMAF................................... ........... .......................... 015C $5.2 Counter strategic NORTHCOM #2 competitors in Western Hemisphere. RDAF................................... ........... 0604617F.................. ........... $1.0 Arctic campaigning....... NORTHCOM #3 RDAF................................... ........... 0604617F.................. ........... $6.0 Arctic campaigning....... NORTHCOM #3 [[Page S3647]] RDAF................................... ........... 0102417F.................. ........... $55.0 OTH-R capability NORTHCOM #4 acceleration. RDAF................................... ........... 0102326F.................. ........... $9.8 Domain awareness tech dev NORTHCOM #5 RDAF................................... ........... 01002412F................. ........... $27.0 ARCHER................... NORTHCOM #6 OPAF................................... 22 .......................... ........... $211.5 3DELLR................... NORTHCOM #7 RDAF................................... ........... 0102326F.................. ........... $4.2 HDCS..................... NORTHCOM #8 RDAF................................... ........... 0102326F.................. ........... $33.2 ERSA..................... NORTHCOM #9 RDAF................................... ........... 0201130F.................. ........... $13.9 Core tech investment..... NORTHCOM #10 O&M, DW................................ ........... .......................... 1PL7 $31.1 Counter Uncrewed Aerial SOCOM Systems (CUAS) Group. 3 Defeat Acceleration.... PROC, DW............................... 75 .......................... ........... $9.3 Counter Uncrewed Aerial SOCOM Systems (CUAS) Group. 3 Defeat Acceleration.... OMMC................................... ........... .......................... 1A1A $9.9 Global Prepositioning SOUTHCOM #22 Network (GPN) Concept. RDSF................................... ........... 9999...................... ........... $143.0 SPACECOM classified SPACECOM #3 program. RDSF................................... ........... 9999...................... ........... $127.0 SPACECOM classified SPACECOM #5 program. RDSF................................... ........... 9999...................... ........... $68.0 SPACECOM classified SPACECOM #6 program. OMAF................................... ........... .......................... 015X $20.0 Space warfighting terrain SPACECOM #7 $ 24,969.4 ---------------- -------------------------------------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------------------------- FY 2024 Senate Senate Account State/Country Installation Project Title Request Change Authorized -------------------------------------------------------------------------------------------------------------------------------------------------------- MILITARY CONSTRUCTION ARMY Army............................... Alabama................. Anniston Army Depot.... OPEN STORAGE (P&D)..... 0 270 270 Army............................... Alabama................. Redstone Arsenal....... SUBSTATION............. 50,000 0 50,000 Army............................... Alaska.................. Fort Wainwright........ COST TO COMPLETE: 34,000 0 34,000 ENLISTED UNACCOMPANIED PERS HSG. Army............................... Alaska.................. Fort Wainwright........ SOLDER PERFORMANCE 0 7,900 7,900 READINESS CENTER (P&D). Army............................... Florida................. Eglin Air Force Base... BARRACKS............... 0 75,000 75,000 Army............................... Georgia................. Hunter Army Airfield... AIRCRAFT MAINTENANCE 0 9,900 9,900 HANGAR (P&D). Army............................... Georgia................. Fort Eisenhower........ CYBER INSTRUCTIONAL 163,000 -90,000 73,000 FACILITY (CLASSROOMS). Army............................... Germany................. Grafenwoehr............ AUTOMATED MULTIPURPOSE 10,400 0 10,400 MACHINE GUN RANGE. Army............................... Germany................. Hohenfels.............. SIMULATIONS CENTER..... 56,000 0 56,000 Army............................... Germany................. Pulaski Barracks....... CHILD DEVELOPMENT 0 25,000 25,000 CENTER. Army............................... Hawaii.................. Aliamanu Military WATER STORAGE TANK..... 20,000 0 20,000 Reservation. Army............................... Hawaii.................. Fort Shafter........... CLEARWELL AND BOOSTER 0 23,000 23,000 PUMP. Army............................... Hawaii.................. Helemano Military WELLS AND STORAGE TANK. 0 33,000 33,000 Reservation. Army............................... Hawaii.................. Schofield Barracks..... ELEVATED TANK AND 0 21,000 21,000 DISTRIBUTION LINE. Army............................... Hawaii.................. Schofield Barracks..... WATER STORAGE TANK..... 0 16,000 16,000 Army............................... Hawaii.................. Wheeler Army Airfield.. AIR TRAFFIC CONTROL 0 5,400 5,400 TOWER (P&D). Army............................... Indiana................. Crane Army Ammunition EARTH COVERED MAGAZINES 0 1,195 1,195 Plant. (P&D). Army............................... Illinois................ Rock Island Arsenal.... CHILD DEVELOPMENT 0 44,000 44,000 CENTER ADDITION. Army............................... Kansas.................. Fort Riley............. AIR TRAFFIC CONTROL 0 1,600 1,600 TOWER (P&D). Army............................... Kansas.................. Fort Riley............. AIRCRAFT MAINTENANCE 105,000 0 105,000 HANGER. Army............................... Kentucky................ Blue Grass Army Depot.. SMALL ARMS 0 3,300 3,300 MODERNIZATION (P&D). Army............................... Kentucky................ Fort Campbell.......... AIR TRAFFIC CONTROL 0 2,500 2,500 TOWER (P&D). Army............................... Kentucky................ Fort Campbell.......... MULTIPURPOSE TRAINING 38,000 0 38,000 RANGE. Army............................... Kentucky................ Fort Knox.............. MIDDLE SCHOOL ADDITION 0 6,600 6,600 (P&D). Army............................... Kwajalein............... Kwajalein Atoll........ COST TO COMPLETE: PIER. 0 15,000 15,000 Army............................... Louisiana............... Fort Johnson........... BARRACKS............... 0 106,000 106,000 Army............................... Louisiana............... Fort Johnson........... MULTIPURPOSE ATHLETIC 0 13,400 13,400 FIELD. Army............................... Maryland................ Fort Meade............. CHILD DEVELOPMENT 0 50,000 50,000 CENTER. Army............................... Massachusetts........... Soldier Systems Center BARRACKS ADDITION...... 18,500 0 18,500 Natick. Army............................... Michigan................ Detroit Arsenal........ GROUND TRANSPORT 72,000 0 72,000 EQUIPMENT BUILDING. Army............................... New Mexico.............. White Sands Missile J-DETC DIRECTED ENERGY 0 5,500 5,500 Range. FACILITY (P&D). Army............................... New York................ Fort Hamilton.......... CHILD DEVELOPMENT 0 25,000 25,000 CENTER. Army............................... New York................ Watervliet Arsenal..... TANK FARM (P&D)........ 0 160 160 Army............................... North Carolina.......... Fort Liberty........... AUTOMATED RECORD FIRE 19,500 0 19,500 RANGE. Army............................... North Carolina.......... Fort Liberty........... BARRACKS............... 50,000 0 50,000 Army............................... North Carolina.......... Fort Liberty........... BARRACKS (FACILITY 85,000 0 85,000 PROTOTYPING). Army............................... North Carolina.......... Fort Liberty........... CHILD DEVELOPMENT 0 39,000 39,000 CENTER. Army............................... Oklahoma................ McAlester Army WATER TREATMENT PLANT 0 1,194 1,194 Ammunition Plant. (P&D). Army............................... Pennsylvania............ Letterkenny Army Depot. ANECHOIC CHAMBER (P&D). 0 275 275 Army............................... Pennsylvania............ Letterkenny Army Depot. GUIDED MISSILE 89,000 0 89,000 MAINTENANCE BUILDING. Army............................... Pennsylvania............ Tobyhanna Army Depot... HELIPAD (P&D).......... 0 311 311 Army............................... Pennsylvania............ Tobyhanna Army Depot... RADAR MAINTENANCE SHOP 0 259 259 (P&D). Army............................... Poland.................. Various Locations...... PLANNING & DESIGN...... 0 25,710 25,710 Army............................... South Carolina.......... Fort Jackson........... CHILD DEVELOPMENT 0 41,000 41,000 CENTER. Army............................... South Carolina.......... Fort Jackson........... COST TO COMPLETE: 0 66,000 66,000 RECEPTION BARRACKS COMPLEX, PHASE 2. Army............................... Texas................... Fort Bliss............. RAIL YARD.............. 74,000 0 74,000 Army............................... Texas................... Fort Cavazos........... BARRACKS (P&D)......... 0 20,000 20,000 Army............................... Texas................... Fort Cavazos........... TACTICAL EQUIPMENT 0 5,800 5,800 MAINTENANCE FACILITIES (P&D). Army............................... Texas................... Red River Army Depot... COMPONENT REBUILD SHOP. 113,000 -66,600 46,400 Army............................... Texas................... Red River Army Depot... NON-DESTRUCTIVE TESTING 0 280 280 FACILITY (P&D). Army............................... Texas................... Red River Army Depot... STANDBY GENERATOR (P&D) 0 270 270 Army............................... Virginia................ Fort Belvoir........... EQUINE TRAINING 0 4,000 4,000 FACILITY (P&D). Army............................... Virginia................ Fort Belvoir........... EQUINE FACILITY........ 0 40,000 40,000 Army............................... Virginia................ Joint Base Myer- BARRACKS............... 0 177,000 177,000 Henderson Hall. Army............................... Washington.............. Joint Base Lewis- BARRACKS............... 100,000 0 100,000 McChord. Army............................... Washington.............. Joint Base Lewis- VEHICLE MAINTENANCE 0 7,500 7,500 McChord. SHOP (P&D). Army............................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 50,000 50,000 FUND. Army............................... Worldwide Unspecified... Unspecified Worldwide HOST NATION SUPPORT.... 26,000 0 26,000 Locations. Army............................... Worldwide Unspecified... Unspecified Worldwide MINOR CONSTRUCTION..... 76,280 0 76,280 Locations. Army............................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 270,875 0 270,875 Locations. Subtotal Military 1,470,555 812,724 2,283,279 Construction, Army. -------------------------- NAVY Navy............................... Australia............... Royal Australian Air PDI: AIRCRAFT PARKING 134,624 0 134,624 Force Base Darwin. APRON (INC). Navy............................... California.............. Marine Corps Air Ground COMMUNICATIONS TOWERS.. 42,100 0 42,100 Combat Center Twentynine Palms. Navy............................... California.............. Marine Corps Base Camp FIRE/EMERGENCY RESPONSE 0 26,825 26,825 Pendleton. STATION (53 AREA) REPLACEMENT. Navy............................... California.............. Port Hueneme........... LABORATORY COMPOUND 110,000 -95,000 15,000 FACILITIES IMPROVEMENTS. Navy............................... Connecticut............. Naval Submarine Base SUBMARINE PIER 31 112,518 -75,800 36,718 New London. EXTENSION. Navy............................... Connecticut............. Naval Submarine Base WEAPONS MAGAZINE & 219,200 -200,000 19,200 New London. ORDNANCE OPERATIONS FAC.. Navy............................... District Of Columbia.... Marine Barracks BACHELOR ENLISTED 131,800 -115,000 16,800 Washington. QUARTERS & SUPPORT FACILITY. Navy............................... District of Columbia.... Naval Support Activity. ELECTROMAGNETIC & CYBER 0 40,000 40,000 COUNTERMEASURES LAB (P&D). Navy............................... Djibouti................ Camp Lemonnier......... ELECTRICAL POWER PLANT. 0 20,000 20,000 Navy............................... Florida................. Naval Air Station AHTS HANGAR............ 0 50,000 50,000 Whiting Field. Navy............................... Georgia................. Marine Corps Logistics CONSOLIDATED 0 63,970 63,970 Base Albany. COMMUNICATION FACILITY. Navy............................... Guam.................... Andersen Air Force Base PDI: CHILD DEVELOPMENT 105,220 -50,000 55,220 CENTER. Navy............................... Guam.................... Andersen Air Force Base PDI: JOINT CONSOL. 107,000 0 107,000 COMM. CENTER (INC). Navy............................... Guam.................... Joint Region Marianas.. PDI: JOINT 292,830 -261,500 31,330 COMMUNICATION UPGRADE (INC). [[Page S3648]] Navy............................... Guam.................... Joint Region Marianas.. PDI: MISSILE 174,540 -130,000 44,540 INTEGRATION TEST FACILITY. Navy............................... Guam.................... Naval Base Guam........ PDI: 9TH ESB TRAINING 23,380 0 23,380 COMPLEX. Navy............................... Guam.................... Naval Base Guam........ PDI: ARTILLERY BATTERY 137,550 -70,000 67,550 FACILITIES. Navy............................... Guam.................... Naval Base Guam........ PDI: CONSOLIDATED MEB 19,740 0 19,740 HQ/NCIS PHII. Navy............................... Guam.................... Naval Base Guam........ PDI: RECREATION CENTER. 34,740 0 34,740 Navy............................... Guam.................... Naval Base Guam........ PDI: RELIGIOUS MINISTRY 46,350 0 46,350 SERVICES FACILITY. Navy............................... Guam.................... Naval Base Guam........ PDI: SATELLITE 166,159 -110,000 56,159 COMMUNICATIONS FACILITY (INC). Navy............................... Guam.................... Naval Base Guam........ PDI: TRAINING CENTER... 89,640 0 89,640 Navy............................... Hawaii.................. Joint Base Pearl Harbor- DRY DOCK 3 REPLACEMENT 1,318,711 91,000 1,409,711 Hickam. (INC). Navy............................... Hawaii.................. Joint Base Pearl Harbor- WATERFRONT PRODUCTION 0 60,000 60,000 Hickam. FACILITY (P&D). Navy............................... Hawaii.................. Marine Corps Base WATER RECLAMATION 0 40,000 40,000 Kaneohe Bay. FACILITY COMPLIANCE UPGRADE. Navy............................... Italy................... Naval Air Station EDI: ORDNANCE MAGAZINES 77,072 0 77,072 Sigonella. Navy............................... Maine................... Portsmouth Naval MULTI-MISSION DRYDOCK 544,808 0 544,808 Shipyard. #1 EXTENSION (INC). Navy............................... Maryland................ Fort Meade............. CYBERSECURITY 186,480 -125,900 60,580 OPERATIONS FACILITY. Navy............................... Maryland................ Naval Air Station AIRCRAFT DEVELOPMENT 141,700 -79,700 62,000 Patuxent River. AND MAINTENANCE FACILITIES. Navy............................... North Carolina.......... Marine Corps Air 2D LAAD MAINTENANCE AND 0 50,000 50,000 Station Cherry Point. OPERATIONS FACILITIES. Navy............................... North Carolina.......... Marine Corps Air AIRCRAFT MAINTENANCE 19,529 0 19,529 Station Cherry Point. HANGAR (INC). Navy............................... North Carolina.......... Marine Corps Air MAINTENANCE FACILITY & 125,150 -85,000 40,150 Station Cherry Point. MARINE AIR GROUP HQS. Navy............................... North Carolina.......... Marine Corps Base Camp 10TH MARINES 0 20,000 20,000 Lejeune. MAINTENANCE & OPERATIONS COMPLEX. Navy............................... North Carolina.......... Marine Corps Base Camp AMPHIBIOUS COMBAT 0 31,890 31,890 Lejeune. VEHICLE SHELTERS. Navy............................... North Carolina.......... Marine Corps Base Camp CORROSION REPAIR 0 20,000 20,000 Lejeune. FACILITY REPLACEMENT. Navy............................... Pennsylvania............ Naval Surface Warfare AI MACHINERY CONTROL 0 88,200 88,200 Center Philadelphia DEVELOPMENT CENTER. Dam Neck Annex. Navy............................... Virginia................ ....................... MARITIME SURVEILLANCE 109,680 0 109,680 SYSTEM FACILITY. Navy............................... Virginia................ Joint Expeditionary CHILD DEVELOPMENT 35,000 0 35,000 Base Little Creek-- CENTER. Fort Story. Navy............................... Virginia................ Marine Corps Base WATER TREATMENT PLANT.. 127,120 -90,000 37,120 Quantico. Navy............................... Virginia................ Naval Station Norfolk.. CHILD DEVELOPMENT 43,600 0 43,600 CENTER. Navy............................... Virginia................ Naval Station Norfolk.. MQ-25 AIRCRAFT LAYDOWN 114,495 -103,000 11,495 FACILITIES. Navy............................... Virginia................ Naval Station Norfolk.. SUBMARINE PIER 3 (INC). 99,077 0 99,077 Navy............................... Virginia................ Naval Weapons Station WEAPONS MAGAZINES...... 221,920 -175,000 46,920 Yorktown. Navy............................... Virginia................ Norfolk Naval Shipyard. DRY DOCK SALTWATER 81,082 0 81,082 SYSTEM FOR CVN-78 (INC). Navy............................... Washington.............. Naval Base Kitsap...... ALTERNATE POWER 0 19,000 19,000 TRANSMISSION LINE. Navy............................... Washington.............. Naval Base Kitsap...... ARMORED FIGHTING 0 31,000 31,000 VEHICLE SUPPORT FACILITY. Navy............................... Washington.............. Naval Base Kitsap...... SHIPYARD ELECTRICAL 195,000 -180,000 15,000 BACKBONE. Navy............................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 75,000 75,000 FUND. Navy............................... Worldwide Unspecified... Unspecified Worldwide.. INDOPACOM PLANNING & 0 69,000 69,000 DESIGN. Navy............................... Worldwide Unspecified... Unspecified Worldwide.. MCON-D (UTILITIES 0 85,000 85,000 MILCON) (P&D). Navy............................... Worldwide Unspecified... Unspecified Worldwide.. SIOP (P&D)............. 0 50,000 50,000 Navy............................... Worldwide Unspecified... Unspecified Worldwide.. PLANNING & DESIGN...... 599,942 0 599,942 Navy............................... Worldwide Unspecified... Unspecified Worldwide.. UNSPECIFIED MINOR 34,430 30,000 64,430 CONSTRUCTION. Navy............................... Worldwide Unspecified... Unspecified Worldwide.. USMC PLANNING & DESIGN. 0 48,741 48,741 ........................ ....................... Subtotal Military 6,022,187 -936,274 5,085,913 Construction, Navy. AIR FORCE.......................... ........................ ....................... ....................... ........... ........... ........... Air Force.......................... Alaska.................. Eielson Air Force Base. CONSOLIDATED MUNITIONS 0 1,200 1,200 COMPLEX (P&D). Air Force.......................... Alaska.................. Eielson Air Force Base. JOINT PACIFIC ALASKA 0 1,100 1,100 RANGE COMPLEX (JPARC) OPS FACILITY (P&D). Air Force.......................... Alaska.................. Joint Base Elmendorf- EXTEND RUNWAY 16/34 107,500 0 107,500 Richardson. (INC 3). Air Force.......................... Alaska.................. Joint Base Elmendorf- PRECISION GUIDED 0 6,100 6,100 Richardson. MISSILE COMPLEX (P&D). Air Force.......................... Arizona................. Luke Air Force Base.... GILA BEND (P&D)........ 0 2,600 2,600 Air Force.......................... Australia............... Royal Australian Air PDI: SQUADRON 26,000 0 26,000 Force Base Darwin. OPERATIONS FACILITY. Air Force.......................... Australia............... Royal Australian Air PDI: AIRCRAFT 17,500 0 17,500 Force Base Tindal. MAINTENANCE SUPPORT FACILITY. Air Force.......................... Australia............... Royal Australian Air PDI: SQUADRON 20,000 0 20,000 Force Base Tindal. OPERATIONS FACILITY. Air Force.......................... Australia............... Royal Australian Air PDI: BOMBER APRON...... 93,000 0 93,000 Force Base Tindal. Air Force.......................... District of Columbia.... Joint Base Anacostia- LARGE VEHICLE 0 50,000 50,000 Bolling. INSPECTION STATION. Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL AIRCRAFT 25,000 0 25,000 CORROSION CONTROL. Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL AIRCRAFT 27,000 0 27,000 MAINTENANCE HANGAR. Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL APRON & 61,000 0 61,000 HYDRANT FUELING PITS. Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL FUEL SYSTEM 18,000 0 18,000 MAINTENANCE DOCK. Air Force.......................... Florida................. Patrick Space Force COMMERCIAL VEHICLE 15,000 0 15,000 Base. INSPECTION. Air Force.......................... Florida................. Patrick Space Force COST TO COMPLETE: 15,000 0 15,000 Base. CONSOLIDATED COMMUNICATIONS CENTER. Air Force.......................... Florida................. Patrick Space Force FINAL DENIAL BARRIERS, 12,000 0 12,000 Base. SOUTH GATE. Air Force.......................... Florida................. Tyndall Air Force Base. NATURAL DISASTER 0 252,000 252,000 RECOVERY. Air Force.......................... Georgia................. Robins Air Force Base.. BATTLE MANAGEMENT 115,000 0 115,000 COMBINED OPERATIONS COMPLEX. Air Force.......................... Guam.................... Joint Region Marianas.. PDI: NORTH AIRCRAFT 109,000 0 109,000 PARKING RAMP (INC). Air Force.......................... Japan................... Kadena Air Base........ PDI: HELO RESCUE OPS 46,000 0 46,000 MAINTENANCE HANGAR (INC 3). Air Force.......................... Japan................... Kadena Air Base........ PDI: THEATER A/C 42,000 0 42,000 CORROSION CONTROL CTR (INC). Air Force.......................... Louisiana............... Barksdale Air Force CHILD DEVELOPMENT 0 2,000 2,000 Base. CENTER (P&D). Air Force.......................... Louisiana............... Barksdale Air Force DORMITORY (P&D)........ 0 7,000 7,000 Base. Air Force.......................... Louisiana............... Barksdale Air Force WEAPONS GENERATION 112,000 0 112,000 Base. FACILITY (INC 3). Air Force.......................... Mariana Islands......... Tinian................. PDI: AIRFIELD 26,000 0 26,000 DEVELOPMENT, PHASE 1 (INC 3). Air Force.......................... Mariana Islands......... Tinian................. PDI: FUEL TANKS W/ 20,000 0 20,000 PIPELINE & HYDRANT (INC 3). Air Force.......................... Mariana Islands......... Tinian................. PDI: PARKING APRON (INC 32,000 0 32,000 3). Air Force.......................... Massachusetts........... Hanscom Air Force Base. CHILD DEVELOPMENT 37,000 0 37,000 CENTER. Air Force.......................... Massachusetts........... Hanscom Air Force Base. MIT-LINCOLN LAB (WEST 70,000 0 70,000 LAB CSL/MIF) (INC 4). Air Force.......................... Mississippi............. Columbus Air Force Base T-7A GROUND BASED 30,000 0 30,000 TRAINING SYSTEM FACILITY. Air Force.......................... Mississippi............. Columbus Air Force Base T-7A UNIT MAINTENANCE 9,500 0 9,500 TRAINING FACILITY. Air Force.......................... Mississippi............. Keesler Air Force Base. AIR TRAFFIC CONTROL 0 2,000 2,000 TOWER (P&D). Air Force.......................... Montana................. Malmstrom Air Force FIRE STATION BAY/ 0 10,300 10,300 Base. STORAGE AREA. Air Force.......................... Nebraska................ Offutt Air Force Base.. 55 CES MAINTENANCE/ 0 4,500 4,500 WAREHOUSE (P&D). Air Force.......................... Nebraska................ Offutt Air Force Base.. BASE OPERATIONS/ 0 5,000 5,000 MOBILITY CENTER (P&D). Air Force.......................... Nebraska................ Offutt Air Force Base.. LOGISTICS READINESS 0 3,500 3,500 SQUADRON TRANSPORTATION FACILITY (P&D). Air Force.......................... Nevada.................. Nellis Air Force Base.. F-35 COALITION HANGAR 0 5,500 5,500 (P&D). Air Force.......................... Nevada.................. Nellis Air Force Base.. F-35 DATA LAB SUPPORT 0 700 700 FACILITY (P&D). Air Force.......................... New Mexico.............. Cannon Air Force Base.. SATELLITE FIRE STATION 0 5,000 5,000 (P&D). Air Force.......................... New Mexico.............. Kirtland Air Force Base COST TO COMPLETE: 0 24,400 24,400 WYOMING GATE UPGRADE FOR ANTITERRORISM COMPLIANCE. Air Force.......................... Norway.................. Rygge Air Station...... EDI: DABS-FEV STORAGE.. 88,000 0 88,000 Air Force.......................... Norway.................. Rygge Air Station...... EDI: MUNITIONS STORAGE 31,000 0 31,000 AREA. Air Force.......................... Ohio.................... Wright-Patterson Air ACQUISITION MANAGEMENT 0 19,500 19,500 Force Base. COMPLEX PHASE V (P&D). Air Force.......................... Oklahoma................ Tinker Air Force Base.. KC-46 3-BAY DEPOT 78,000 0 78,000 MAINTENANCE HANGAR (INC 3). Air Force.......................... Oklahoma................ Vance Air Force Base... CONSOLIDATED 0 8,400 8,400 UNDERGRADUATE PILOT TRAINING CENTER (P&D). Air Force.......................... Philippines............. Cesar Basa Air Base.... PDI: TRANSIENT AIRCRAFT 35,000 0 35,000 PARKING APRON. Air Force.......................... South Dakota............ Ellsworth Air Force B-21 FUEL SYSTEM 75,000 0 75,000 Base. MAINTENANCE DOCK. Air Force.......................... South Dakota............ Ellsworth Air Force B-21 PHASE HANGAR...... 160,000 0 160,000 Base. Air Force.......................... South Dakota............ Ellsworth Air Force B-21 WEAPONS GENERATION 160,000 0 160,000 Base. FACILITY (INC). Air Force.......................... Spain................... Moron Air Base......... EDI: MUNITIONS STORAGE. 26,000 0 26,000 Air Force.......................... Texas................... Joint Base San Antonio- 91 CYBER OPERATIONS 0 48,000 48,000 Lackland. CENTER. Air Force.......................... Texas................... Joint Base San Antonio- BMT--CHAPEL FOR 0 122,000 122,000 Lackland. AMERICA'S AIRMEN. Air Force.......................... Texas................... Joint Base San Antonio- BMT--CLASSROOM/DINING 0 124,000 124,000 Lackland. FACILITY 4. Air Force.......................... Texas................... Joint Base San Antonio- CHILD DEVELOPMENT 20,000 0 20,000 Lackland. CENTER. Air Force.......................... United Kingdom.......... Royal Air Force COST TO COMPLETE: EDI 0 28,000 28,000 Fairford. DABS-FEV STORAGE. Air Force.......................... United Kingdom.......... Royal Air Force COST TO COMPLETE: EDI 0 20,000 20,000 Fairford. MUNITIONS HOLDING AREA. Air Force.......................... United Kingdom.......... Royal Air Force EDI: RADR STORAGE 47,000 0 47,000 Fairford. FACILITY. Air Force.......................... United Kingdom.......... Royal Air Force EDI: RADR STORAGE 28,000 0 28,000 Lakenheath. FACILITY. Air Force.......................... United Kingdom.......... Royal Air Force SURETY DORMITORY....... 50,000 0 50,000 Lakenheath. [[Page S3649]] Air Force.......................... Utah.................... Hill Air Force Base.... F-35 COMPOSITE REPAIR & 0 171,000 171,000 TRAINING FACILITY, PHASE 1. Air Force.......................... Utah.................... Hill Air Force Base.... F-35 MAINTENANCE 0 235,000 235,000 FACILITY, PHASE 1. Air Force.......................... Utah.................... Hill Air Force Base.... F-35 T-7A EAST CAMPUS 82,000 0 82,000 INFRASTRUCTURE. Air Force.......................... Virginia................ Langley Air Force Base. COST TO COMPLETE-- 0 84,000 84,000 DORMITORY. Air Force.......................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 50,000 50,000 FUND. Air Force.......................... Worldwide Unspecified... Unspecified Worldwide EDI: PLANNING & DESIGN. 5,648 0 5,648 Locations. Air Force.......................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 429,266 0 429,266 Locations. Air Force.......................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 64,900 0 64,900 Locations. MILITARY CONSTRUCTION. Air Force.......................... Wyoming................. F.E. Warren Air Force COST TO COMPLETE: 0 18,000 18,000 Base. CONSOLIDATED HELO/TRF OPS/AMU AND ALERT FACILITY. Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD INTEGRATED COMMAND 27,000 0 27,000 Base. CENTER (INC 2). Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD INTEGRATED 85,000 0 85,000 Base. TRAINING CENTER. Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD MISSILE HANDLING 28,000 0 28,000 Base. COMPLEX (INC 2). -------------------------- ........................ ....................... Subtotal Military 2,605,314 1,310,800 3,916,114 Construction, Air Force. DEFENSE-WIDE ........................ ....................... ....................... ........... ........... ........... Defense-Wide....................... Alabama................. Redstone Arsenal....... GROUND TEST FACILITY 147,975 -70,000 77,975 INFRASTRUCTURE. Defense-Wide....................... California.............. Marine Corps Air AMBULATORY CARE CENTER-- 103,000 -82,400 20,600 Station Miramar. DENTAL CLINIC ADD//ALT. Defense-Wide....................... California.............. Marine Corps Air ELECTRICAL 0 30,550 30,550 Station Miramar. INFRASTRUCTURE, ON- SITE GENERATION, AND MICROGRID IMPROVEMENTS. Defense-Wide....................... California.............. Monterey............... COST TO COMPLETE: COGEN 0 5,460 5,460 PLANT AT B236. Defense-Wide....................... California.............. Mountain View.......... INSTALL MICROGRID, 0 15,500 15,500 750KW PV, 750KWH BESS, & 800KW GENERATOR SYSTEM. Defense-Wide....................... California.............. Naval Base Coronado.... COST TO COMPLETE: ATC 0 11,400 11,400 OPERATIONS SUPPORT FACILITY. Defense-Wide....................... California.............. Naval Base Coronado.... SOF NAVAL SPECIAL 0 51,000 51,000 WARFARE COMMAND OPERATIONS SUPPORT FACILITY, PHASE 2. Defense-Wide....................... California.............. Naval Base San Diego... AMBULATORY CARE CENTER-- 101,644 -79,460 22,184 DENTAL CLINIC REPLMT. Defense-Wide....................... California.............. Naval Base San Diego... MICROGRID AND BACKUP 0 6,300 6,300 POWER. Defense-Wide....................... California.............. Naval Base Ventura COST TO COMPLETE: 0 16,840 16,840 County. GROUND MOUNTED SOLAR PV. Defense-Wide....................... California.............. Vandenberg Space Force MICROGRID WITH BACKUP 0 57,000 57,000 Base. POWER. Defense-Wide....................... Colorado................ Buckley Space Force REDUNDANT ELECTRICAL 0 9,000 9,000 Base. SUPPLY. Defense-Wide....................... Colorado................ Buckley Space Force REPLACEMENT WATER WELL. 0 5,700 5,700 Base. Defense-Wide....................... Cuba.................... Guantanamo Bay Naval AMBULATORY CARE CENTER 60,000 0 60,000 Station. (INC 1). Defense-Wide....................... Delaware................ Dover Air Force Base... ARMED SERVICES WHOLE 0 30,500 30,500 BLOOD PROCESSING LABORATORY. Defense-Wide....................... Diego Garcia............ Naval Support Facility MICROGRID ELECTRIC 0 16,820 16,820 Diego Garcia. DISTRIBUTION LINE UPGRADE. Defense-Wide....................... Djibouti................ Camp Lemonnier......... COST TO COMPLETE: 0 5,200 5,200 ENHANCE ENERGY SECURITY AND CONTROL SYSTEMS. Defense-Wide....................... Florida................. Naval Air Station POTABLE WATER 0 31,220 31,220 Whiting Field. DISTRIBUTION SYSTEM. Defense-Wide....................... Georgia................. Fort Benning........... COST TO COMPLETE: 5.2MW 0 27,351 27,351 MICROGRID & GENERATION PLANT. Defense-Wide....................... Georgia................. Kings Bay.............. COST TO COMPLETE: SCADA 0 2,700 2,700 MODERNIZATION. Defense-Wide....................... Georgia................. Naval Submarine Base COST TO COMPLETE: 0 25,190 25,190 Kings Bay. ELECTRICAL TRANSMISSION AND DISTRIBUTION IMPROVEMENTS (PHAS. Defense-Wide....................... Georgia................. Naval Submarine Base ELECTRICAL TRANSMISSION 0 49,500 49,500 Kings Bay. AND DISTRIBUTION IMPROVEMENTS, PHASE 2. Defense-Wide....................... Germany................. Baumholder............. HUMAN PERFORMANCE 0 16,700 16,700 TRAINING CENTER. Defense-Wide....................... Germany................. Baumholder............. SOF COMPANY OPERATIONS 41,000 0 41,000 FACILITY. Defense-Wide....................... Germany................. Baumholder............. SOF JOINT PARACHUTE 23,000 0 23,000 RIGGING FACILITY. Defense-Wide....................... Germany................. Kaiserslautern Air Base KAISERSLAUTERN MIDDLE 21,275 0 21,275 SCHOOL. Defense-Wide....................... Germany................. Ramstein Air Base...... RAMSTEIN MIDDLE SCHOOL. 181,764 0 181,764 Defense-Wide....................... Germany................. Rhine Ordnance Barracks MEDICAL CENTER 77,210 0 77,210 REPLACEMENT (INC 11). Defense-Wide....................... Germany................. Stuttgart.............. ROBINSON BARRACKS ELEM 8,000 0 8,000 SCHOOL REPLACEMENT. Defense-Wide....................... Hawaii.................. Joint Base Pearl Harbor- COST TO COMPLETE: FY20 0 7,476 7,476 Hickam. 500 KW PV COVERED PARKING EV CHARGING STATION. Defense-Wide....................... Hawaii.................. Joint Base Pearl Harbor- COST TO COMPLETE: 0 13,040 13,040 Hickam. PRIMARY ELECTRICAL DISTRIBUTION. Defense-Wide....................... Honduras................ Soto Cano Air Base..... FUEL FACILITIES........ 41,300 0 41,300 Defense-Wide....................... Italy................... Naples................. COST TO COMPLETE: SMART 0 7,610 7,610 GRID. Defense-Wide....................... Japan................... Fleet Activities KINNICK HIGH SCHOOL 70,000 0 70,000 Yokosuka. (INC). Defense-Wide....................... Japan................... Kadena Air Base........ PDI: SOF MAINTENANCE 88,900 0 88,900 HANGAR. Defense-Wide....................... Japan................... Kadena Air Base........ PDI: SOF COMPOSITE 11,400 0 11,400 MAINTENANCE FACILITY. Defense-Wide....................... Kansas.................. Forbes Field........... MICROGRID AND BACKUP 0 5,850 5,850 POWER. Defense-Wide....................... Kansas.................. Fort Riley............. COST TO COMPLETE: POWER 0 15,468 15,468 GENERATION AND MICROGRID. Defense-Wide....................... Korea................... K-16 Air Base.......... K-16 EMERGENCY BACKUP 0 5,650 5,650 POWER. Defense-Wide....................... Kuwait.................. Camp Arifjan........... COST TO COMPLETE: POWER 0 8,197 8,197 GENERATION AND MICROGRID. Defense-Wide....................... Kuwait.................. Camp Buehring.......... MICROGRID AND BACKUP 0 18,850 18,850 POWER. Defense-Wide....................... Louisiana............... Naval Air Station Joint COST TO COMPLETE: 0 6,453 6,453 Reserve Base New DISTRIBUTION Orleans. SWITCHGEAR. Defense-Wide....................... Maryland................ Bethesda Naval Hospital MEDICAL CENTER ADDITION/ 101,816 0 101,816 ALTERATION (INC 7). Defense-Wide....................... Maryland................ Fort Meade............. NSAW MISSION OPS AND 105,000 0 105,000 RECORDS CENTER (INC). Defense-Wide....................... Maryland................ Fort Meade............. NSAW RECAP BUILDING 4 315,000 0 315,000 (INC). Defense-Wide....................... Maryland................ Fort Meade............. NSAW RECAP BUILDING 5 65,000 0 65,000 (ECB 5) (INC). Defense-Wide....................... Maryland................ Joint Base Andrews..... HYDRANT FUELING SYSTEM. 38,300 0 38,300 Defense-Wide....................... Missouri................ Lake City Army MICROGRID AND BACKUP 0 80,100 80,100 Ammunition Plant. POWER. Defense-Wide....................... Montana................. Great Falls FUEL FACILITIES........ 30,000 0 30,000 International Airport. Defense-Wide....................... Nebraska................ Offutt Air Force Base.. DEFENSE POW/MIA 0 5,000 5,000 ACCOUNTABILITY AGENCY LABORATORY (P&D). Defense-Wide....................... Nebraska................ Offutt Air Force Base.. MICROGRID AND BACKUP 0 41,000 41,000 POWER. Defense-Wide....................... New Jersey.............. Sea Girt............... UNDERGROUND ELECTRICAL 0 44,000 44,000 DISTRIBUTION SYSTEM. Defense-Wide....................... North Carolina.......... Fort Liberty........... COST TO COMPLETE: FORT 0 1,418 1,418 LIBERTY EMERGENCY WATER SYSTEM. Defense-Wide....................... North Carolina.......... Fort Liberty (Camp MICROGRID AND BACKUP 0 10,500 10,500 Mackall). POWER. Defense-Wide....................... North Carolina.......... Marine Corps Base Camp MARINE RAIDER BATTALION 0 70,000 70,000 Lejeune. OPERATIONS FACILITY. Defense-Wide....................... Oklahoma................ Fort Sill.............. MICROGRID AND BACKUP 0 76,650 76,650 POWER. Defense-Wide....................... Pennsylvania............ Fort Indiantown Gap.... COST TO COMPLETE: 0 9,250 9,250 GEOTHERMAL AND SOLAR PV. Defense-Wide....................... Puerto Rico............. Fort Buchanan.......... MICROGRID AND BACKUP 0 56,000 56,000 POWER. Defense-Wide....................... Puerto Rico............. Juana Diaz............. COST TO COMPLETE: 0 7,680 7,680 MICROGRID CONTROLS, 690 KW PV, 275KW GEN, 570 KWH BESS. Defense-Wide....................... Puerto Rico............. Ramey.................. COST TO COMPLETE: 0 6,360 6,360 MICROGRID CONTROL SYSTEM, 460 KW PV, 275KW GEN, 660 KWH BES. Defense-Wide....................... Spain................... Naval Station Rota..... BULK TANK FARM, PHASE 1 80,000 0 80,000 Defense-Wide....................... Texas................... Fort Cavazos........... CENTRAL CHILLED WATER 0 32,000 32,000 PLANT. Defense-Wide....................... Texas................... Fort Cavazos........... COST TO COMPLETE: POWER 0 18,900 18,900 GENERATION AND MICROGRID. Defense-Wide....................... Texas................... Fort Cavazos........... MICROGRID AND BACKUP 0 18,250 18,250 POWER. Defense-Wide....................... Utah.................... Camp Williams.......... MICROGRID & WIND 0 20,100 20,100 TURBINE. Defense-Wide....................... Utah.................... Hill Air Force Base.... OPEN STORAGE........... 14,200 0 14,200 Defense-Wide....................... Virginia................ Fort Belvoir........... DIA HEADQUARTERS ANNEX. 185,000 -160,000 25,000 Defense-Wide....................... Virginia................ Hampton Roads.......... COST TO COMPLETE: 0 1,200 1,200 BACKUP POWER GENERATION. Defense-Wide....................... Virginia................ Joint Expeditionary SOF SDVT2 OPERATIONS 61,000 0 61,000 Base Little Creek-- SUPPORT FACILITY. Fort Story. Defense-Wide....................... Virginia................ Fort Belvoir (NGA COST TO COMPLETE: 0 550 550 Campus East). CHILLED WATER REDUNDANCY. Defense-Wide....................... Virginia................ Pentagon............... HVAC EFFICIENCY 0 2,250 2,250 UPGRADES. Defense-Wide....................... Virginia................ Pentagon............... SEC OPS AND PEDESTRIAN 30,600 0 30,600 ACCESS FACS. Defense-Wide....................... Washington.............. Joint Base Lewis- POWER GENERATION AND 0 49,850 49,850 McChord. MICROGRID. Defense-Wide....................... Washington.............. Joint Base Lewis- SOF CONSOLIDATED 62,000 0 62,000 McChord. RIGGING FACILITY. Defense-Wide....................... Washington.............. Manchester............. BULK STORAGE TANKS, 71,000 0 71,000 PHASE 2. Defense-Wide....................... Washington.............. Naval Base Kitsap...... MAIN SUBSTATION 0 31,520 31,520 REPLACEMENT AND MICROGRID. Defense-Wide....................... Washington.............. Naval Magazine Indian MICROGRID AND BACKUP 0 37,770 37,770 Island. POWER. Defense-Wide....................... Washington.............. Naval Undersea Warfare SOF COLD WATER TRAINING 0 37,000 37,000 Center Keyport. AUSTERE ENVIRONMENT FACILITY. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide.. INDOPACOM UNSPECIFIED 0 62,000 62,000 MINOR MILITARY CONSTRUCTION. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide ENERGY RESILIENCE AND 548,000 -548,000 0 Locations. CONSERV. INVEST. PROG.. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide ERCIP PLANNING & DESIGN 86,250 0 86,250 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide EXERCISE RELATED MINOR 11,107 0 11,107 Locations. CONSTRUCTION. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (DHA) 49,610 0 49,610 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 32,579 0 32,579 Locations. (Defense-Wide). Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 30,215 0 30,215 Locations. (CYBERCOM). Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 25,130 0 25,130 Locations. (SOCOM). [[Page S3650]] Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (DLA) 24,000 0 24,000 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 8,568 0 8,568 Locations. (DODEA). Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (NSA) 3,068 0 3,068 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (TJS) 2,000 0 2,000 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (MDA) 1,035 0 1,035 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (WHS) 590 0 590 Locations. Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 19,271 0 19,271 Locations. CONSTRUCTION (SOCOM). Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 3,000 0 3,000 Locations. CONSTRUCTION (DEFENSE- WIDE). Defense-Wide....................... Worldwide Unspecified... Various Worldwide UNSPECIFIED MINOR 4,875 0 4,875 Locations. CONSTRUCTION (DLA). Defense-Wide....................... Wyoming................. F.E. Warren Air Force MICROGRID AND BATTERY 0 25,000 25,000 Base. STORAGE. -------------------------- Subtotal Military 2,984,682 307,013 3,291,695 Construction, Defense- Wide. ARMY NATIONAL GUARD Army National Guard................ Alabama................. Fort McClellan......... COST TO COMPLETE: 0 7,000 7,000 ENLISTED BARRACKS, TT. Army National Guard................ Alabama................. Huntsville............. COST TO COMPLETE: 0 4,650 4,650 NATIONAL GUARD READINESS CENTER. Army National Guard................ Arizona................. Surprise Readiness NATIONAL GUARD 15,000 0 15,000 Center. READINESS CENTER. Army National Guard................ Arkansas................ Fort Chaffee........... COST TO COMPLETE: 0 610 610 NATIONAL GUARD READINESS CENTER. Army National Guard................ California.............. Bakersfield............ COST TO COMPLETE: 0 1,000 1,000 VEHICLE MAINTENANCE SHOP. Army National Guard................ California.............. Camp Roberts........... COST TO COMPLETE: 0 5,000 5,000 AUTOMATED MULTIPURPOSE MACHINE GUN (MPMG) RANGE. Army National Guard................ Colorado................ Peterson Space Force COST TO COMPLETE: 0 3,000 3,000 Base. NATIONAL GUARD READINESS CENTER. Army National Guard................ Connecticut............. Putnam................. COST TO COMPLETE: 0 6,125 6,125 NATIONAL GUARD READINESS CENTER. Army National Guard................ Florida................. Camp Blanding.......... MULTIPURPOSE MACHINE 0 11,000 11,000 GUN RANGE. Army National Guard................ Guam.................... Barrigada.............. COST TO COMPLETE: 0 6,900 6,900 NATIONAL GUARD READINESS CENTER. Army National Guard................ Idaho................... Jerome................. COST TO COMPLETE: 0 1,250 1,250 NATIONAL GUARD READINESS CENTER. Army National Guard................ Idaho................... Jerome County Regional NATIONAL GUARD VEHICLE 17,000 0 17,000 Site. MAINTENANCE SHOP. Army National Guard................ Illinois................ Bloomington............ COST TO COMPLETE: 0 5,250 5,250 NATIONAL GUARD VEHICLE MAINTENANCE SHOP. Army National Guard................ Illinois................ North Riverside Armory. NATIONAL GUARD VEHICLE 24,000 0 24,000 MAINTENANCE SHOP. Army National Guard................ Indiana................. Shelbyville............ COST TO COMPLETE: 0 5,000 5,000 NATIONAL GUARD READINESS CENTER ADD/ ALT. Army National Guard................ Kansas.................. Topeka................. COST TO COMPLETE: 0 5,856 5,856 NATIONAL GUARD/RESERVE CENTER BUILDING. Army National Guard................ Kentucky................ Burlington............. VEHICLE MAINTENANCE 0 16,400 16,400 SHOP. Army National Guard................ Kentucky................ Frankfort.............. COST TO COMPLETE: 0 2,000 2,000 NATIONAL GUARD/RESERVE CENTER BUILDING. Army National Guard................ Louisiana............... Camp Beauregard........ COLLECTIVE TRAINING 0 2,400 2,400 UNACCOMPANIED HOUSING OPEN-BAY (P&D). Army National Guard................ Louisiana............... Camp Beauregard........ COST TO COMPLETE: 0 2,000 2,000 NATIONAL GUARD READINESS CENTER. Army National Guard................ Louisiana............... Camp Minden............ COST TO COMPLETE: 0 3,718 3,718 COLLECTIVE TRAINING UNACCOMPANIED HOUSING, OPEN BAY. Army National Guard................ Maine................... Northern Maine Range AUTOMATED MULTIPURPOSE 0 2,800 2,800 Complex. MACHINE GUN RANGE (P&D). Army National Guard................ Maine................... Saco................... COST TO COMPLETE: 0 7,420 7,420 NATIONAL GUARD VEHICLE MAINTENANCE SHOP. Army National Guard................ Massachusetts........... Camp Edwards........... COST TO COMPLETE: 0 3,000 3,000 AUTOMATED MULTIPURPOSE MACHINE GUN (MPMG) RANGE. Army National Guard................ Mississippi............. Camp Shelby............ CAMP SHELBY JFTC 0 2,200 2,200 RAILHEAD EXPANSION (P&D). Army National Guard................ Mississippi............. Camp Shelby............ COST TO COMPLETE: 0 5,425 5,425 MANEUVER AREA TRAINING EQUIPMENT SITE ADDITION. Army National Guard................ Mississippi............. Southaven.............. NATIONAL GUARD 0 22,000 22,000 READINESS CENTER. Army National Guard................ Missouri................ Belle Fontaine......... NATIONAL GUARD 28,000 0 28,000 READINESS CENTER. Army National Guard................ Nebraska................ Bellevue............... COST TO COMPLETE: 0 9,090 9,090 NATIONAL GUARD READINESS CENTER. Army National Guard................ Nebraska................ Greenlief Training Site COLLECTIVE TRAINING 0 1,200 1,200 UNACCOMPANIED HOUSING OPEN-BAY (P&D). Army National Guard................ Nebraska................ Mead Training Site..... COST TO COMPLETE: 0 1,912 1,912 COLLECTIVE TRAINING UNACCOMPANIED HOUSING, OPEN BAY. Army National Guard................ Nebraska................ North Platte........... COST TO COMPLETE: 0 400 400 NATIONAL GUARD VEHICLE MAINTENANCE SHOP. Army National Guard................ New Hampshire........... Concord................ COST TO COMPLETE: 0 200 200 NATIONAL GUARD READINESS CENTER. Army National Guard................ New Hampshire........... Littleton.............. NATIONAL GUARD VEHICLE 23,000 0 23,000 MAINTENANCE SHOP ADD. Army National Guard................ New Jersey.............. Joint Base McGuire-Dix- COST TO COMPLETE: 0 605 605 Lakehurst. NATIONAL GUARD READINESS CENTER. Army National Guard................ New Mexico.............. Rio Rancho Training NATIONAL GUARD VEHICLE 11,000 0 11,000 Site. MAINTENANCE SHOP ADD. Army National Guard................ New York................ Lexington Avenue Armory NATIONAL GUARD 0 70,000 70,000 READINESS CENTER. Army National Guard................ North Carolina.......... Salisbury.............. ARMY AVIATION SUPPORT 0 2,200 2,200 FACILITIES (P&D). Army National Guard................ North Dakota............ Camp Grafton........... INSTITUTIONAL POST- 0 1,950 1,950 INITIAL MILITARY TRAINING, UNACCOMPANIED HOUSING (P&D). Army National Guard................ North Dakota............ Dickinson.............. COST TO COMPLETE: 0 5,425 5,425 NATIONAL GUARD READINESS CENTER. Army National Guard................ Ohio.................... Camp Perry Joint NATIONAL GUARD 19,200 0 19,200 Training Center. READINESS CENTER. Army National Guard................ Ohio.................... Columbus............... COST TO COMPLETE: 0 4,000 4,000 NATIONAL GUARD READINESS CENTER. Army National Guard................ Oklahoma................ Ardmore................ COST TO COMPLETE: 0 400 400 VEHICLE MAINTENANCE SHOP. Army National Guard................ Oregon.................. Washington County NATIONAL GUARD 26,000 0 26,000 Readiness Center. READINESS CENTER. Army National Guard................ Pennsylvania............ Hermitage Readiness NATIONAL GUARD 13,600 0 13,600 Center. READINESS CENTER. Army National Guard................ Pennsylvania............ Moon Township.......... COST TO COMPLETE: 0 3,100 3,100 COMBINED SUPPORT MAINTENANCE SHOP. Army National Guard................ Puerto Rico............. Fort Allen............. COST TO COMPLETE: 0 3,678 3,678 NATIONAL GUARD READINESS CENTER. Army National Guard................ Rhode Island............ Camp Fogarty Training COLLECTIVE TRAINING 0 1,990 1,990 Site. UNACCOMPANIED HOUSING OPEN-BAY (P&D). Army National Guard................ Rhode Island............ North Kingstown........ NATIONAL GUARD 0 30,000 30,000 READINESS CENTER. Army National Guard................ South Carolina.......... Aiken County Readiness NATIONAL GUARD 20,000 0 20,000 Center. READINESS CENTER. Army National Guard................ South Carolina.......... Joint Base Charleston.. COST TO COMPLETE: 0 4,373 4,373 NATIONAL GUARD READINESS CENTER. Army National Guard................ South Carolina.......... McCrady Training Center AUTOMATED MULTIPURPOSE 7,900 0 7,900 MACHINE GUN RANGE. Army National Guard................ South Dakota............ Sioux Falls............ COST TO COMPLETE: 0 5,250 5,250 NATIONAL GUARD READINESS CENTER. Army National Guard................ Tennessee............... Campbell Army Air Field ARMY AIR TRAFFIC 0 2,500 2,500 CONTROL TOWERS (P&D). Army National Guard................ Tennessee............... McMinnville............ COST TO COMPLETE: 0 500 500 NATIONAL GUARD READINESS CENTER. Army National Guard................ Texas................... Fort Cavazos........... GENERAL INSTRUCTION 0 2,685 2,685 BUILDING (P&D). Army National Guard................ Texas................... Fort Worth............. COST TO COMPLETE: 0 6,489 6,489 AIRCRAFT MAINTENANCE HANGAR ADD/ALT. Army National Guard................ Texas................... Fort Worth............. COST TO COMPLETE: 0 381 381 NATIONAL GUARD VEHICLE MAINTENANCE SHOP. Army National Guard................ Utah.................... Camp Williams.......... COLLECTIVE TRAINING 0 2,875 2,875 UNACCOMPANIED HOUSING, SENIOR NCO AND OFFICER (P&D). Army National Guard................ Vermont................. Bennington............. COST TO COMPLETE: 0 3,415 3,415 NATIONAL GUARD READINESS CENTER. Army National Guard................ Virgin Islands.......... St. Croix.............. COST TO COMPLETE: ARMY 0 4,200 4,200 AVIATION SUPPORT FACILITY. Army National Guard................ Virgin Islands.......... St. Croix.............. COST TO COMPLETE: READY 0 1,710 1,710 BUILDING. Army National Guard................ Virginia................ Sandston RC & FMS 1.... AIRCRAFT MAINTENANCE 20,000 0 20,000 HANGAR. Army National Guard................ Virginia................ Troutville............. COST TO COMPLETE: 0 2,415 2,415 COMBINED SUPPORT MAINTENANCE SHOP ADDITION. Army National Guard................ Virginia................ Troutville............. COST TO COMPLETE: 0 2,135 2,135 NATIONAL GUARD READINESS CENTER ADDITION. Army National Guard................ West Virginia........... Parkersburg............ NATIONAL GUARD 0 3,300 3,300 READINESS CENTER (P&D). Army National Guard................ Wisconsin............... Viroqua................ NATIONAL GUARD 18,200 0 18,200 READINESS CENTER. Army National Guard................ Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 34,286 0 34,286 Locations. Army National Guard................ Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 63,000 0 63,000 Locations. CONSTRUCTION. ........................ ....................... Subtotal Military 340,186 310,382 650,568 Construction, Army National Guard. ARMY RESERVE ........................ ....................... ....................... ........... ........... ........... Army Reserve....................... Alabama................. Birmingham............. ARMY RESERVE CENTER/ 57,000 0 57,000 AMSA/LAND. Army Reserve....................... Arizona................. San Tan Valley......... AREA MAINTENANCE 12,000 0 12,000 SUPPORT ACTIVITY. Army Reserve....................... California.............. Camp Pendleton......... COST TO COMPLETE: AREA 0 3,000 3,000 MAINTENANCE SUPPORT ACTIVITY. Army Reserve....................... California.............. Fort Hunter Liggett.... NETWORK ENTERPRISE 0 40,000 40,000 CENTER. Army Reserve....................... California.............. Parks Reserve Forces ADVANCED SKILLS 0 35,000 35,000 Training Area. TRAINING BARRACKS. Army Reserve....................... Georgia................. Marine Corps Logistics ARMY RESERVE CENTER.... 0 40,000 40,000 Base Albany. Army Reserve....................... Florida................. Perrine................ COST TO COMPLETE: ARMY 0 3,000 3,000 RESERVE CENTER. Army Reserve....................... Massachusetts........... Devens Reserve Forces COLLECTIVE TRAINING 0 39,000 39,000 Training Area. ENLISTED BARRACKS. Army Reserve....................... North Carolina.......... Asheville.............. COST TO COMPLETE: ARMY 0 12,000 12,000 RESERVE CENTER. Army Reserve....................... Ohio.................... Wright-Patterson Air COST TO COMPLETE: ARMY 0 5,000 5,000 Force Base. RESERVE CENTER. Army Reserve....................... Puerto Rico............. Fort Buchanan.......... ADVANCED SKILLS 0 39,000 39,000 TRAINING BARRACKS. Army Reserve....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 23,389 0 23,389 Locations. Army Reserve....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 14,687 0 14,687 Locations. CONSTRUCTION. -------------------------- ........................ ....................... Subtotal Military 107,076 216,000 323,076 Construction, Army Reserve. NAVY RESERVE & MARINE CORPS RESERVE ........................ ....................... ....................... ........... ........... ........... Navy Reserve & Marine Corps Reserve Michigan................ Battle Creek........... ORGANIC SUPPLY 24,549 0 24,549 FACILITIES. Navy Reserve & Marine Corps Reserve Virginia................ Marine Forces Reserve G/ATOR SUPPORT 12,400 0 12,400 Dam Neck Virginia FACILITIES. Beach. Navy Reserve & Marine Corps Reserve Worldwide Unspecified... Unspecified Worldwide MCNR PLANNING & DESIGN. 6,495 0 6,495 Locations. [[Page S3651]] Navy Reserve & Marine Corps Reserve Worldwide Unspecified... Unspecified Worldwide MCNR UNSPECIFIED MINOR 7,847 0 7,847 Locations. CONSTRUCTION. -------------------------- ........................ ....................... Subtotal Military 51,291 0 51,291 Construction, Navy Reserve & Marine Corps Reserve. AIR NATIONAL GUARD ........................ ....................... ....................... ........... ........... ........... Air National Guard................. Alabama................. Montgomery Regional F-35 ADAL SQ OPS BLDG 7,000 0 7,000 Airport. 1303. Air National Guard................. Alaska.................. Eielson Air Force Base. AMC STANDARD DUAL BAY 0 3,700 3,700 HANGAR (P&D). Air National Guard................. Alaska.................. Joint Base Elmendorf- ADAL ALERT CREW 0 7,000 7,000 Richardson. FACILITY HGR 18. Air National Guard................. Arizona................. Tucson International MCCA: AIRCRAFT 11,600 0 11,600 Airport. ARRESTING SYSTEM (NEW RWY). Air National Guard................. Arkansas................ Ebbing Air National 3-BAY HANGAR........... 0 54,000 54,000 Guard Base. Air National Guard................. Arkansas................ Ebbing Air National AIRCREW FLIGHT 0 9,300 9,300 Guard Base. EQUIPMENT/STEP. Air National Guard................. Arkansas................ Ebbing Air National SPECIAL ACCESS PROGRAM 0 12,700 12,700 Guard Base. FACILITY. Air National Guard................. Colorado................ Buckley Space Force AIRCRAFT CORROSION 12,000 0 12,000 Base. CONTROL. Air National Guard................. Georgia................. Savannah/Hilton Head DINING HALL AND 0 27,000 27,000 International Airport. SERVICES TRAINING FACILITY. Air National Guard................. Indiana................. Fort Wayne FIRE STATION........... 8,900 0 8,900 International Airport. Air National Guard................. Mississippi............. Field Air National COST TO COMPLETE: 172ND 0 8,000 8,000 Guard Base. AIRLIFT WING FIRE/ CRASH RESCUE STATION. Air National Guard................. Missouri................ Rosecrans Air National 139TH AIRLIFT WING 0 2,000 2,000 Guard Base. ENTRY CONTROL POINT (P&D). Air National Guard................. Missouri................ Rosecrans Air National ENTRY CONTROL POINT 0 2,000 2,000 Guard Base. (P&D). Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 22,000 0 22,000 Airport. COMPLEX, PHASE 1. Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 18,500 0 18,500 Airport. COMPLEX, PHASE 2. Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 0 20,000 20,000 Airport. COMPLEX, PHASE 3. Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 0 11,000 11,000 Airport. COMPLEX, PHASE 4. Air National Guard................. Pennsylvania............ Harrisburg ENTRY CONTROL FACILITY. 0 8,000 8,000 International Airport. Air National Guard................. Wisconsin............... Truax Field............ F-35: MM&I FAC, B701... 0 5,200 5,200 Air National Guard................. Wisconsin............... Volk Air National Guard FIRE/CRASH RESCUE 0 670 670 Base. STATION (P&D). Air National Guard................. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 35,600 0 35,600 Locations. Air National Guard................. Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 63,122 0 63,122 Locations. CONSTRUCTION. -------------------------- ........................ ....................... Subtotal Military 178,722 170,570 349,292 Construction, Air National Guard. AIR FORCE RESERVE ........................ ....................... ....................... ........... ........... ........... Air Force Reserve.................. Arizona................. Davis-Monthan Air Force GUARDIAN ANGEL POTFF 0 8,500 8,500 Base. FACILITY. Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 ADD/ALTER B1244 17,000 0 17,000 FUT/CARGO PALLET STORAGE. Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 ADD/ALTER B6000 8,500 0 8,500 SIMULATOR FACILITY. Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 TWO BAY 201,000 0 201,000 MAINTENANCE/FUEL HANGAR. Air Force Reserve.................. Guam.................... Joint Region Marianas.. AERIAL PORT FACILITY... 27,000 0 27,000 Air Force Reserve.................. Louisiana............... Barksdale Air Force 307 BW MEDICAL FACILITY 0 7,000 7,000 Base. ADDITION. Air Force Reserve.................. Ohio.................... Youngstown Air Reserve BASE FIRE STATION (P&D) 0 2,500 2,500 Station. Air Force Reserve.................. Texas................... Naval Air Station Joint LRS WAREHOUSE.......... 16,000 0 16,000 Reserve Base Fort Worth. Air Force Reserve.................. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 12,146 0 12,146 Locations. Air Force Reserve.................. Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 9,926 0 9,926 Locations. MILITARY CONSTRUCTION. -------------------------- ........................ ....................... Subtotal Military 291,572 18,000 309,572 Construction, Air Force Reserve. NATO SECURITY INVESTMENT PROGRAM ........................ ....................... ....................... ........... ........... ........... NATO............................... Worldwide Unspecified... NATO Security NATO SECURITY 293,434 0 293,434 Investment Program. INVESTMENT PROGRAM. ........................ ....................... Subtotal NATO Security 293,434 0 293,434 Investment Program. INDOPACIFIC COMBATANT COMMAND ........................ ....................... ....................... ........... ........... ........... MILCON, INDOPACOM.................. Worldwide Unspecified... Unspecified Worldwide INDOPACOM MILITARY 0 150,000 150,000 Locations. CONSTRUCTION PILOT PROGRAM. Subtotal Base 0 150,000 150,000 Realignment and Closure--Defense-Wide. TOTAL INDOPACIFIC 0 150,000 150,000 COMBATANT COMMAND. TOTAL MILITARY 14,345,019 2,359,215 16,704,234 CONSTRUCTION. FAMILY HOUSING FAMILY HOUSING CONSTRUCTION, ARMY Fam Hsg Con, Army.................. Georgia................. Fort Eisenhower........ FORT EISENHOWER MHPI 50,000 0 50,000 EQUITY INVESTMENT. Fam Hsg Con, Army.................. Germany................. Baumholder............. FAMILY HOUSING NEW 78,746 0 78,746 CONSTRUCTION. Fam Hsg Con, Army.................. Kwajalein............... Kwajalein Atoll........ FAMILY HOUSING 98,600 0 98,600 REPLACEMENT CONSTRUCTION. Fam Hsg Con, Army.................. Missouri................ Fort Leonard Wood...... FORT LEONARD WOOD MHPI 50,000 0 50,000 EQUITY INVESTMENT. Fam Hsg Con, Army.................. Worldwide Unspecified... Unspecified Worldwide FAMILY HOUSING P&D..... 27,549 0 27,549 Locations. -------------------------- Subtotal Family Housing 304,895 0 304,895 Construction, Army. FAMILY HOUSING O&M, ARMY Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 12,121 0 12,121 Locations. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 86,019 0 86,019 Locations. SUPPORT. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide LEASING................ 112,976 0 112,976 Locations. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 86,706 0 86,706 Locations. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 41,121 0 41,121 Locations. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 554 0 554 Locations. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide SERVICES............... 7,037 0 7,037 Locations. Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 38,951 0 38,951 Locations. -------------------------- Subtotal Family Housing 385,485 0 385,485 Operation And Maintenance, Army. FAMILY HOUSING CONSTRUCTION, NAVY & MARINE CORPS Fam Hsg Con, Navy & Marine Corps... Guam.................... Joint Region Marianas.. REPLACE ANDERSEN 121,906 0 121,906 HOUSING, PHASE 8. Fam Hsg Con, Navy & Marine Corps... Guam.................... Naval Support Activity REPLACE ANDERSEN 83,126 0 83,126 Andersen. HOUSING (AF), PHASE 7. Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide DESIGN, WASHINGTON DC.. 4,782 0 4,782 Locations. Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide IMPROVEMENTS, 57,740 0 57,740 Locations. WASHINGTON DC. Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide USMC DPRI/GUAM PLANNING 9,588 0 9,588 Locations. & DESIGN. -------------------------- Subtotal Family Housing 277,142 0 277,142 Construction, Navy & Marine Corps. FAMILY HOUSING O&M, NAVY & MARINE CORPS Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 17,744 0 17,744 Locations. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 65,655 0 65,655 Locations. SUPPORT. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide LEASING................ 60,214 0 60,214 Locations. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 101,356 0 101,356 Locations. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 61,896 0 61,896 Locations. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 419 0 419 Locations. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide SERVICES............... 13,250 0 13,250 Locations. Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 43,320 0 43,320 Locations. -------------------------- Subtotal Family Housing 363,854 0 363,854 Operation & Maintenance, Navy & Marine Corps. FAMILY HOUSING CONSTRUCTION, AIR FORCE Fam Hsg Con, Air Force............. Alabama................. Maxwell Air Force Base. MHPI RESTRUCTURE-AETC 65,000 0 65,000 GROUP II. [[Page S3652]] Fam Hsg Con, Air Force............. Colorado................ U.S. Air Force Academy. CONSTRUCTION 9,282 0 9,282 IMPROVEMENT--CARLTON HOUSE. Fam Hsg Con, Air Force............. Hawaii.................. Joint Base Pearl Harbor- MHPI RESTRUCTURE-JOINT 75,000 0 75,000 Hickam. BASE PEARL HARBOR- HICKAM. Fam Hsg Con, Air Force............. Mississippi............. Keesler Air Force Base. MHPI RESTRUCTURE- 80,000 0 80,000 SOUTHERN GROUP. Fam Hsg Con, Air Force............. Japan................... Yokota Air Base........ IMPROVE FAMILY HOUSING 0 27,000 27,000 PAIP 9, PHASE 1 (24 UNITS). Fam Hsg Con, Air Force............. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 7,815 0 7,815 Locations. -------------------------- Subtotal Family Housing 237,097 27,000 264,097 Construction, Air Force. FAMILY HOUSING O&M, AIR FORCE Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 12,884 11,000 23,884 Locations. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 31,803 0 31,803 Locations. SUPPORT. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide LEASING................ 5,143 0 5,143 Locations. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 135,410 -11,000 124,410 Locations. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 68,023 0 68,023 Locations. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 2,377 0 2,377 Locations. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide SERVICES............... 10,692 0 10,692 Locations. Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 48,054 0 48,054 Locations. -------------------------- Subtotal Family Housing 314,386 0 314,386 Operation And Maintenance, Air Force. FAMILY HOUSING O&M, DEFENSE-WIDE Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS (DIA)...... 673 0 673 Locations. Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS (NSA)...... 89 0 89 Locations. Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide LEASING (DIA).......... 32,042 0 32,042 Locations. Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide LEASING (NSA).......... 13,658 0 13,658 Locations. Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 35 0 35 Locations. Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide UTILITIES (DIA)........ 4,273 0 4,273 Locations. Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide UTILITIES (NSA)........ 15 0 15 Locations. -------------------------- Subtotal Family Housing 50,785 0 50,785 Operation And Maintenance, Defense- Wide. FAMILY HOUSING IMPROVEMENT FUND Family Housing Improvement Fund.... Worldwide Unspecified... Unspecified Worldwide ADMINISTRATIVE 6,611 0 6,611 Locations. EXPENSES--FHIF. -------------------------- Subtotal Family Housing 6,611 0 6,611 Improvement Fund. UNACCOMPANIED HOUSING IMPROVEMENT FUND Unaccompanied Housing Improvement Worldwide Unspecified ADMINISTRATIVE 496.................... 0 496 Fund. Unspecified Worldwide EXPENSES--UHIF. Locations. -------------------------- Subtotal Unaccompanied 496 0 496 Housing Improvement Fund. TOTAL FAMILY HOUSING... 1,940,751 27,000 1,967,751 DEFENSE BASE REALIGNMENT AND CLOSURE BASE REALIGNMENT AND CLOSURE, ARMY BRAC, Army......................... Worldwide Unspecified BASE REALIGNMENT AND 150,640................ 0 150,640 Unspecified Worldwide CLOSURE. Locations. -------------------------- Subtotal Base 150,640 0 150,640 Realignment and Closure--Army. BASE REALIGNMENT AND CLOSURE, NAVY BRAC, Navy......................... Worldwide Unspecified... Unspecified Worldwide BASE REALIGNMENT AND 108,818 0 108,818 Locations. CLOSURE. -------------------------- Subtotal Base 108,818 0 108,818 Realignment and Closure--Navy. BASE REALIGNMENT AND CLOSURE, AIR FORCE BRAC, Air Force.................... Worldwide Unspecified... Unspecified Worldwide BASE REALIGNMENT AND 123,990 0 Locations. CLOSURE. -------------------------- Subtotal Base 123,990 0 123,990 Realignment and Closure--Air Force. BASE REALIGNMENT AND CLOSURE, DEFENSE- WIDE BRAC, Defense-Wide................. Worldwide Unspecified... Unspecified Worldwide INT-4: DLA ACTIVITIES.. 5,726 0 5,726 Locations. -------------------------- Subtotal Base 5,726 0 5,726 Realignment and Closure--Defense-Wide. TOTAL DEFENSE BASE 389,174 0 389,174 REALIGNMENT AND CLOSURE. TOTAL MILITARY 16,674,944 2,386,215 19,061,159 CONSTRUCTION, FAMILY HOUSING, AND BRAC. -------------------------------------------------------------------------------------------------------------------------------------------------------- TITLE XXI--ARMY MILITARY CONSTRUCTION SEC. 2101. AUTHORIZED ARMY CONSTRUCTION AND LAND ACQUISITION PROJECTS. (a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table: Army: Inside the United States ---------------------------------------------------------------------------------------------------------------- State Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Alabama........................................ Redstone Arsenal.............................. $50,000,000 Florida........................................ Eglin Air Force Base.......................... $75,000,000 Georgia........................................ Fort Eisenhower............................... $163,000,000 Hawaii......................................... Aliamanu Military Reservation................. $20,000,000 Fort Shafter.................................. $23,000,000 Helemano Military Reservation................. $33,000,000 Schofield Barracks............................ $37,000,000 Illinois....................................... Rock Island Arsenal........................... $44,000,000 Kansas......................................... Fort Riley.................................... $105,000,000 Kentucky....................................... Fort Campbell................................. $38,000,000 Louisiana...................................... Fort Johnson.................................. $119,400,000 Maryland....................................... Fort Meade.................................... $50,000,000 Massachusetts.................................. Soldier Systems Center Natick................. $18,500,000 Michigan....................................... Detroit Arsenal............................... $72,000,000 New York....................................... Fort Hamilton................................. $25,000,000 North Carolina................................. Fort Liberty.................................. $193,500,000 Pennsylvania................................... Letterkenny Army Depot........................ $89,000,000 [[Page S3653]] South Carolina................................. Fort Jackson.................................. $41,000,000 Texas.......................................... Fort Bliss.................................... $74,000,000 Red River Army Depot.......................... $113,000,000 Virginia....................................... Fort Belvoir.................................. $40,000,000 Joint Base Myer - Henderson Hall.............. $177,000,000 Washington..................................... Joint Base Lewis - McChord.................... $100,000,000 ---------------------------------------------------------------------------------------------------------------- (b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table: Army: Outside the United States ---------------------------------------------------------------------------------------------------------------- Country Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Germany........................................ Grafenwoehr................................... $10,400,000 Hohenfels..................................... $56,000,000 Pulaski Barracks.............................. $25,000,000 ---------------------------------------------------------------------------------------------------------------- (c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Army may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code: Army Prototype Project ---------------------------------------------------------------------------------------------------------------- State Installation Amount ---------------------------------------------------------------------------------------------------------------- North Carolina................................. Fort Liberty.................................. $85,000,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2102. FAMILY HOUSING. (a) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table: Army: Family Housing ---------------------------------------------------------------------------------------------------------------- Country Installation or Location Units Amount ---------------------------------------------------------------------------------------------------------------- Germany................................ Baumholder................. Family Housing New $78,746,000 Construction............ Kwajalein.............................. Kwajalein Atoll............ Family Housing $98,600,000 Replacement Construction ---------------------------------------------------------------------------------------------------------------- (b) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may improve existing military family housing units in an amount not to exceed $100,000,000. (c) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $27,549,000. SEC. 2103. AUTHORIZATION OF APPROPRIATIONS, ARMY. (a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Army as specified in the funding table in section 4601. (b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2101 of this Act may not exceed the total amount authorized to be appropriated under subsection (a), as specified in the funding table in section 4601. SEC. 2104. EXTENSION OF AUTHORITY TO USE CASH PAYMENTS IN SPECIAL ACCOUNT FROM LAND CONVEYANCE, NATICK SOLDIER SYSTEMS CENTER, MASSACHUSETTS. Section 2844(c)(2)(C) of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1865) is amended by striking ``October 1, 2025'' and inserting ``October 1, 2027''. SEC. 2105. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2018 PROJECT AT KUNSAN AIR BASE, KOREA. (a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in subsection (b), as provided in section 2101(b) of that Act (131 Stat. 1819) and extended and modified by subsections (a) and (b) of section 2106 of the Military Construction Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (b) Table.--The table referred to in subsection (a) is as follows: [[Page S3654]] Army: Extension of 2018 Project Authorization ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Korea................................. Kunsan Air Base........... Unmanned Aerial Vehicle $53,000,000 Hangar.................. ---------------------------------------------------------------------------------------------------------------- SEC. 2106. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2019 PROJECTS. (a) Army Construction and Land Acquisition.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2101 of that Act (132 Stat. 2241), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Army: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original State/Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Korea................................. Camp Tango................ Command and Control $17,500,000 Facility................ Maryland.............................. Fort Meade................ Cantonment Area Roads.... $16,500,000 ---------------------------------------------------------------------------------------------------------------- (b) Overseas Contingency Operations.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2901 of that Act (132 Stat. 2286), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Army: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Bulgaria.............................. Nevo Selo FOS............. EDI: Ammunition Holding $5,200,000 Area.................... Romania............................... Mihail Kogalniceanu FOS... EDI: Explosives & Ammo $21,651,000 Load/Unload Apron....... ---------------------------------------------------------------------------------------------------------------- SEC. 2107. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2021 PROJECTS. (a) Army Construction and Land Acquisition.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2101(a) of that Act (134 Stat. 4295), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Army: Extension of 2021 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original State Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Arizona............................... Yuma Proving Ground....... Ready Building........... $14,000,000 Georgia............................... Fort Gillem............... Forensic Lab............. $71,000,000 Louisiana............................. Fort Johnson.............. Information Systems $25,000,000 Facility................ ---------------------------------------------------------------------------------------------------------------- (b) Child Development Center, Georgia.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorization under section 2865 of that Act (10 U.S.C. 2802 note) for the project described in paragraph (2) in Fort Eisenhower, Georgia, shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Project described.--The project described in this paragraph is the following: Army: Extension of 2021 Project Authorization ---------------------------------------------------------------------------------------------------------------- Original State Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Georgia............................... Fort Eisenhower........... Child Development Center. $21,000,000 ---------------------------------------------------------------------------------------------------------------- TITLE XXII--NAVY MILITARY CONSTRUCTION SEC. 2201. AUTHORIZED NAVY CONSTRUCTION AND LAND ACQUISITION PROJECTS. (a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table: [[Page S3655]] Navy: Inside the United States ---------------------------------------------------------------------------------------------------------------- State Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- California.................................. Marine Corps Air Ground Combat Center Twentynine $42,100,000 Palms........................................... Marine Corps Base Camp Pendleton................. $26,825,000 Port Hueneme..................................... $110,000,000 Connecticut................................. Naval Submarine Base New London.................. $331,718,000 District of Columbia........................ Marine Barracks Washington....................... $131,800,000 Florida..................................... Naval Air Station Whiting Field.................. $141,500,000 Georgia..................................... Marine Corps Logistics Base Albany............... $63,970,000 Guam........................................ Andersen Air Force Base.......................... $497,620,000 Joint Region Marianas............................ $174,540,000 Naval Base Guam.................................. $946,500,000 Hawaii...................................... Marine Corps Base Kaneohe Bay.................... $227,350,000 Maryland.................................... Fort Meade....................................... $186,480,000 Naval Air Station Patuxent River................. $141,700,000 North Carolina.............................. Marine Corps Air Station Cherry Point............ $270,150,000 Marine Corps Base Camp Lejeune................... $215,670,000 Pennsylvania................................ Naval Surface Warfare Center Philadelphia........ $88,200,000 Virginia.................................... Dam Neck Annex................................... $109,680,000 Joint Expeditionary Base Little Creek - Fort $35,000,000 Story. Marine Corps Base Quantico....................... $127,120,000 Naval Station Norfolk............................ $158,095,000 Naval Weapons Station Yorktown................... $221,920,000 Washington.................................. Naval Base Kitsap................................ $245,000,000 ---------------------------------------------------------------------------------------------------------------- (b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table: Navy: Outside the United States ---------------------------------------------------------------------------------------------------------------- Country Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Djibouti.................................... Camp Lemonnier................................... $106,600,000 Italy....................................... Naval Air Station Sigonella...................... $77,072,000 ---------------------------------------------------------------------------------------------------------------- (c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Navy may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code: Navy Prototype Project ---------------------------------------------------------------------------------------------------------------- State Installation Amount ---------------------------------------------------------------------------------------------------------------- Virginia.................................... Joint Expeditionary Base Little Creek - Fort $35,000,000 Story........................................... ---------------------------------------------------------------------------------------------------------------- SEC. 2202. FAMILY HOUSING. (a) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table: Navy: Family Housing ---------------------------------------------------------------------------------------------------------------- Installation or Country Location Units Amount ---------------------------------------------------------------------------------------------------------------- Guam................................. Joint Region Marianas.. Replace Andersen $121,906,000 Housing Ph 8.......... Mariana Islands........ Replace Andersen $83,126,000 Housing (AF) PH7. ---------------------------------------------------------------------------------------------------------------- (b) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may improve existing military family housing units in an amount not to exceed $57,740,000. (c) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $14,370,000. SEC. 2203. AUTHORIZATION OF APPROPRIATIONS, NAVY. (a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Navy, as specified in the funding table in section 4601. (b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2201 of this Act may not exceed the total amount authorized to be appropriated under subsection (a), as specified in the funding table in section 4601. SEC. 2204. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2019 PROJECTS. (a) Navy Construction and Land Acquisition Projects.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2201 of that Act (132 Stat. 2243), shall remain in effect [[Page S3656]] until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Navy: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State/Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Bahrain.............................. SW Asia................ Fleet Maintenance $26,340,000 Facility & TOC. North Carolina....................... Marine Corps Base Camp 2nd Radio BN Complex, $51,300,000 Lejeune. Phase 2. South Carolina....................... Marine Corps Air Recycling/Hazardous $9,517,000 Station Beaufort. Waste Facility. Washington........................... Bangor................. Pier and Maintenance $88,960,000 Facility. ---------------------------------------------------------------------------------------------------------------- (b) Laurel Bay Fire Station, South Carolina.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorization under section 2810 of that Act (132 Stat. 2266) for the project described in paragraph (2) shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Project described.--The project described in this paragraph is the following:: Navy: Extension of 2019 Project Authorization ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State Location Project Amount ---------------------------------------------------------------------------------------------------------------- South Carolina....................... Marine Corps Air Laurel Bay Fire Station $10,750,000 Station Beaufort. ---------------------------------------------------------------------------------------------------------------- (c) Overseas Contingency Operations.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorization set forth in the table in paragraph (2), as provided in section 2902 of that Act (132 Stat. 2286), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Navy: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Greece............................... Naval Support Activity EDI: Joint Mobility $41,650,000 Souda Bay. Processing Center. ---------------------------------------------------------------------------------------------------------------- SEC. 2205. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2021 PROJECTS. (a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in subsection (b), as provided in section 2201 of that Act (134 Stat. 4297), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (b) Table.--The table referred to in subsection (a) is as follows: Navy: Extension of 2021 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State/Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- California........................... Twentynine Palms....... Wastewater Treatment $76,500,000 Plant. Guam................................. Joint Region Marianas.. Joint Communication $166,000,000 Upgrade. Maine................................ NCTAMS LANT Detachment Perimeter Security..... $26,100,000 Cutler. Nevada............................... Fallon................. Range Training Complex, $29,040,000 Phase I. ---------------------------------------------------------------------------------------------------------------- TITLE XXIII--AIR FORCE MILITARY CONSTRUCTION SEC. 2301. AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS. (a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table: Air Force: Inside the United States ---------------------------------------------------------------------------------------------------------------- State Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- District of Columbia.......................... Joint Base Anacostia - Bolling.................. $50,000,000 Florida....................................... MacDill Air Force Base.......................... $131,000,000 Patrick Space Force Base........................ $27,000,000 Tyndall Air Force Base.......................... $252,000,000 Georgia....................................... Robins Air Force Base........................... $115,000,000 Guam.......................................... Joint Region Marianas........................... $411,000,000 Massachusetts................................. Hanscom Air Force Base.......................... $37,000,000 Mississippi................................... Columbus Air Force Base......................... $39,500,000 Montana....................................... Malmstrom Air Force Base........................ $10,300,000 South Dakota.................................. Ellsworth Air Force Base........................ $235,000,000 [[Page S3657]] Texas......................................... Joint Base San Antonio - Lackland............... $314,000,000 Utah.......................................... Hill Air Force Base............................. $488,000,000 Wyoming....................................... F.E. Warren Air Force Base...................... $85,000,000 ---------------------------------------------------------------------------------------------------------------- (b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table: Air Force: Outside the United States ---------------------------------------------------------------------------------------------------------------- Country Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Australia..................................... Royal Australian Air Force Base Darwin.......... $26,000,000 Royal Australian Air Force Base Tindal.......... $130,500,000 Norway........................................ Rygge Air Station............................... $119,000,000 Philippines................................... Cesar Basa Air Base............................. $35,000,000 Spain......................................... Moron Air Base.................................. $26,000,000 United Kingdom................................ Royal Air Force Fairford........................ $47,000,000 Royal Air Force Lakenheath...................... $78,000,000 ---------------------------------------------------------------------------------------------------------------- (c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Air Force may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code: Air Force Prototype Project ---------------------------------------------------------------------------------------------------------------- State Installation Amount ---------------------------------------------------------------------------------------------------------------- Massachusetts................................. Hanscom Air Force Base.......................... $37,000,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2302. FAMILY HOUSING. (a) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may improve existing military family housing units in an amount not to exceed $249,928,200. (b) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $7,815,000. (c) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may construct or acquire family housing units (including land acquisition and supporting facilities) at the installation and in the amount set forth in the following table: Air Force: Family Housing ---------------------------------------------------------------------------------------------------------------- Country Installation Amount ---------------------------------------------------------------------------------------------------------------- Japan......................................... Yokota Air Base................................. $27,000,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2303. AUTHORIZATION OF APPROPRIATIONS, AIR FORCE. (a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Air Force, as specified in the funding table in section 4601. (b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2301 of this Act may not exceed the total amount authorized to be appropriated under subsection (a), as specified in the funding table in section 4601. SEC. 2304. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2017 PROJECTS. (a) Air Force Construction and Land Acquisition Projects.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2017 (division B of Public Law 114-328; 130 Stat. 2688), the authorizations set forth in the table in paragraph (2), as provided in section 2301(b) of that Act (130 Stat. 2697) and extended by section 2304 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117-181; 135 Stat. 2169), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2017 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Germany............................... Ramstein Air Base......... 37 AS Squadron Operations/ $13,437,000 Aircraft Maintenance Unit.................... Spangdahlem Air Base...... Upgrade Hardened Aircraft $2,700,000 Shelters for F/A-22..... Japan................................. Yokota Air Force Base..... C-130J Corrosion Control $23,777,000 Hangar.................. ---------------------------------------------------------------------------------------------------------------- [[Page S3658]] (b) Overseas Contingency Operations.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2017 (division B of Public Law 114-328; 130 Stat. 2688), the authorization set forth in the table in paragraph (2), as provided in section 2902 of that Act (130 Stat. 2743) and extended by section 2304 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117-181; 135 Stat. 2169), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2017 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Germany............................... Spangdahlem Air Base...... F/A-22 Low Observable/ $12,000,000 Composite Repair Facility................ ---------------------------------------------------------------------------------------------------------------- SEC. 2305. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2018 PROJECTS. (a) Air Force Construction and Land Acquisition Projects.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in paragraph (2), as provided in section 2301(a) of that Act (131 Stat. 1825) and extended by section 2304(a) of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2018 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original State Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Florida............................... Tyndall Air Force Base.... Fire Station............. $17,000,000 ---------------------------------------------------------------------------------------------------------------- (b) Overseas Contingency Operations.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1817), the authorizations set forth in the table in paragraph (2), as provided in section 2903 of that Act (131 Stat. 1876) and extended by section 2304(b) of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2018 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Hungary............................... Kecskemet Air Base........ ERI: Airfield Upgrades... $12,900,000 Kecskemet Air Base........ ERI: Construct Parallel $30,000,000 Taxiway................. Kecskemet Air Base........ ERI: Increase POL Storage $12,500,000 Capacity................ Luxembourg............................ Sanem..................... ERI: ECAOS Deployable $67,400,000 Airbase System Storage.. Slovakia.............................. Malacky................... ERI: Airfield Upgrades... $4,000,000 Malacky................... ERI: Increase POL Storage $20,000,000 Capacity................ ---------------------------------------------------------------------------------------------------------------- SEC. 2306. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2019 PROJECTS. (a) Air Force Construction and Land Acquisition Projects.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2301 of that Act (132 Stat. 2246), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original State/Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Mariana Islands....................... Tinian.................... APR-Cargo Pad with $46,000,000 Taxiway Extension....... Tinian.................... APR-Maintenance Support $4,700,000 Facility................ Maryland.............................. Joint Base Andrews........ Child Development Center. $13,000,000 Joint Base Andrews........ PAR Relocate Haz Cargo $37,000,000 Pad and EOD Range....... New Mexico............................ Holloman Air Force Base... MQ-9 FTU Ops Facility.... $85,000,000 Kirtland Air Force Base... Wyoming Gate Upgrade for $7,000,000 Anti-Terrorism Compliance.............. United Kingdom........................ Royal Air Force Lakenheath F-35 ADAL Conventional $9,204,000 Munitions MX............ Utah.................................. Hill Air Force Base....... Composite Aircraft $26,000,000 Antenna Calibration Fac. ---------------------------------------------------------------------------------------------------------------- (b) Overseas Contingency Operations.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2903 of that Act (132 Stat. 2287), shall remain in effect [[Page S3659]] until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Slovakia.............................. Malacky................... EDI: Regional Munitions $59,000,000 Storage Area............ United Kingdom........................ RAF Fairford.............. EDI: Construct DABS-FEV $87,000,000 Storage................. RAF Fairford.............. EDI: Munitions Holding $19,000,000 Area.................... ---------------------------------------------------------------------------------------------------------------- SEC. 2307. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2021 PROJECTS. (a) Air Force Construction and Land Acquisition Project.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorization set forth in the table in paragraph (2), as provided in section 2301 of that Act (134 Stat. 4299), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2021 Project Authorization ---------------------------------------------------------------------------------------------------------------- Original State Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Virginia.............................. Joint Base Langley - Access Control Point Main $19,500,00 Eustis................... Gate with Lang Acq...... ---------------------------------------------------------------------------------------------------------------- (b) Overseas Contingency Operations.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2902 of that Act (134 Stat. 4373), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Air Force: Extension of 2021 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Original Country Installation or Location Project Authorized Amount ---------------------------------------------------------------------------------------------------------------- Germany............................... Ramstein.................. EDI: Rapid Airfield $36,345,000 Damage Repair Storage... Spangdahlem Air Base...... EDI: Rapid Airfield $25,824,000 Damage Repair Storage... ---------------------------------------------------------------------------------------------------------------- TITLE XXIV--DEFENSE AGENCIES MILITARY CONSTRUCTION SEC. 2401. AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS. (a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of Defense may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table: Defense Agencies: Inside the United States ---------------------------------------------------------------------------------------------------------------- State Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Alabama..................................... Redstone Arsenal.............................. $147,975,000 California.................................. Marine Corps Air Station Miramar.............. $103,000,000 Naval Base Coronado........................... $51,000,000 Naval Base San Diego.......................... $101,644,000 Delaware.................................... Dover Air Force Base.......................... $30,500,000 Maryland.................................... Fort Meade.................................... $885,000,000 Joint Base Andrews............................ $38,300,000 Montana..................................... Great Falls International Airport............. $30,000,000 North Carolina.............................. Marine Corps Base Camp Lejeune................ $70,000,000 Utah........................................ Hill Air Force Base........................... $14,200,000 Virginia.................................... Fort Belvoir.................................. $185,000,000 Joint Expeditionary Base Little Creek - Fort $61,000,000 Story. Pentagon...................................... $30,600,000 Washington.................................. Joint Base Lewis - McChord.................... $62,000,000 Manchester.................................... $71,000,000 Naval Undersea Warfare Center Keyport......... $37,000,000 ---------------------------------------------------------------------------------------------------------------- (b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of Defense may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table: [[Page S3660]] Defense Agencies: Outside the United States ---------------------------------------------------------------------------------------------------------------- Country Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Cuba......................................... Guantanamo Bay Naval Station.................. $257,000,000 Germany...................................... Baumholder.................................... $57,700,000 Ramstein Air Base............................. $181,764,000 Honduras..................................... Soto Cano Air Base............................ $41,300,000 Japan........................................ Kadena Air Base............................... $100,300,000 Spain........................................ Naval Station Rota............................ $80,000,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2402. AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS. (a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for energy conservation projects as specified in the funding table in section 4601, the Secretary of Defense may carry out energy conservation projects under chapter 173 of title 10, United States Code, for the installations or locations inside the United States, and in the amounts, set forth in the following table: ERCIP Projects: Inside the United States ---------------------------------------------------------------------------------------------------------------- State Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- California.................................. Marine Corps Air Station Miramar.............. $30,550,000 Mountain View................................. $15,500,000 Naval Base San Diego.......................... $6,300,000 Vandenberg Space Force Base................... $57,000,000 Colorado.................................... Buckley Space Force Base...................... $14,700,000 Florida..................................... Naval Air Station Whiting Field............... $31,220,000 Georgia..................................... Naval Submarine Base Kings Bay................ $49,500,000 Kansas...................................... Forbes Field.................................. $5,850,000 Missouri.................................... Lake City Army Ammunition Plant............... $80,100,000 Nebraska.................................... Offutt Air Force Base......................... $41,000,000 New Jersey.................................. Sea Girt...................................... $44,000,000 North Carolina.............................. Fort Liberty (Camp Mackall)................... $10,500,000 Oklahoma.................................... Fort Sill..................................... $76,650,000 Puerto Rico................................. Fort Buchanan................................. $56,000,000 Texas....................................... Fort Cavazos.................................. $50,250,000 Utah........................................ Camp Williams................................. $20,100,000 Virginia.................................... Pentagon...................................... $2,250,000 Washington.................................. Joint Base Lewis - McChord.................... $49,850,000 Naval Base Kitsap............................. $31,520,000 Naval Magazine Indian Island.................. $37,770,000 Wyoming..................................... F.E. Warren Air Force Base.................... $25,000,000 ---------------------------------------------------------------------------------------------------------------- (b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for energy conservation projects as specified in the funding table in section 4601, the Secretary of Defense may carry out energy conservation projects under chapter 173 of title 10, United States Code, for the installations or locations outside the United States, and in the amounts, set forth in the following table: ERCIP Projects: Outside the United States ---------------------------------------------------------------------------------------------------------------- Country Installation or Location Amount ---------------------------------------------------------------------------------------------------------------- Diego Garcia................................. Naval Support Facility Diego Garcia........... $16,820,000 Korea........................................ K-16 Air Base................................. $5,650,000 Kuwait....................................... Camp Buehring................................. $18,850,000 ---------------------------------------------------------------------------------------------------------------- (c) Improvement of Conveyed Utility Systems.--In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table: Improvement of Conveyed Utility Systems ---------------------------------------------------------------------------------------------------------------- State Installation or Location Project ---------------------------------------------------------------------------------------------------------------- Nebraska..................................... Offutt Air Force Base......................... Microgrid and Backup Power North Carolina............................... Fort Liberty (Camp Mackall)................... Microgrid and Backup Power Texas........................................ Fort Cavazos.................................. Microgrid and Backup Power Washington................................... Joint Base Lewis - McChord.................... Power Generation and Microgrid ---------------------------------------------------------------------------------------------------------------- [[Page S3661]] SEC. 2403. AUTHORIZATION OF APPROPRIATIONS, DEFENSE AGENCIES. (a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of Defense (other than the military departments), as specified in the funding table in section 4601. (b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2401 of this Act may not exceed the total amount authorized to be appropriated under subsection (a), as specified in the funding table in section 4601. SEC. 2404. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2018 PROJECTS. (a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1817), the authorizations set forth in the table in subsection (b), as provided in section 2401(b) of that Act (131 Stat. 1829) and extended by section 2404 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (b) Table.--The table referred to in subsection (a) is as follows: Defense Agencies: Extension of 2018 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Japan................................ Iwakuni................ Construct Bulk Storage $30,800,000 Tanks PH 1............ Puerto Rico.......................... Punta Borinquen........ Ramey Unit School $61,071,000 Replacement........... ---------------------------------------------------------------------------------------------------------------- SEC. 2405. EXTENSION AND MODIFICATION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2019 PROJECTS. (a) Extension.-- (1) In general.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2401(b) of that Act (132 Stat. 2249), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Defense Agencies: Extension of 2019 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Germany.............................. Baumholder............. SOF Joint Parachute $11,504,000 Rigging Facility...... Japan................................ Camp McTureous......... Betchel Elementary $94,851,000 School................ Iwakuni................ Fuel Pier............. $33,200,000 ---------------------------------------------------------------------------------------------------------------- (b) Modification of Authority to Carry Out Fiscal Year 2019 Project in Baumholder, Germany.-- (1) Modification of project authority.--In the case of the authorization contained in the table in section 2401(b) of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2249) for Baumholder, Germany, for construction of a SOF Joint Parachute Rigging Facility, the Secretary of Defense may construct a 3,200 square meter facility. (2) Modification of project amounts.-- (A) Division b table.--The authorization table in section 2401(b) of the Military Construction Defense Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2249), as extended pursuant to subsection (a), is amended in the item relating to Baumholder, Germany, by striking ``$11,504,000'' and inserting ``$23,000,000'' to reflect the project modification made by paragraph (1). (B) Division d table.--The funding table in section 4601 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115-232; 132 Stat. 2406) is amended in the item relating to Defense-wide, Baumholder, Germany, SOF Joint Parachute Rigging Facility, by striking ``$11,504'' in the Conference Authorized column and inserting ``$23,000'' to reflect the project modification made by paragraph (1). SEC. 2406. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2021 PROJECTS. (a) Defense Agencies Construction and Land Acquisition Project.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorization set forth in the table in paragraph (2), as provided in section 2401(b) of that Act (134 Stat. 4305), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in paragraph (1) is as follows: Defense Agencies: Extension of 2021 Project Authorization ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Japan................................ Def Fuel Support Point Fuel Wharf............. $49,500,000 Tsurumi............... ---------------------------------------------------------------------------------------------------------------- (b) Energy Resilience and Conservation Investment Program Projects.-- (1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2402 of that Act (134 Stat. 4306), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (2) Table.--The table referred to in subsection (a) is as follows: ERCIP Projects: Extension of 2021 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State/Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Arkansas............................. Ebbing Air National PV Arrays and Battery $2,600,000 Guard Base............ Storage............... California........................... Marine Corps Air Ground Install 10 Mw Battery $11,646,000 Combat Center Energy Storage for Twentynine Palms...... Various Buildings..... [[Page S3662]] Military Ocean Terminal Military Ocean Terminal $29,000,000 Concord............... Concord Microgrid..... Naval Support Activity Cogeneration Plant at $10,540,000 Monterey.............. B236.................. Italy................................ Naval Support Activity Smart Grid............. $3,490,000 Naples................ Nevada............................... Creech Air Force Base.. Central Standby $32,000,000 Generators............ Virginia............................. Naval Medical Center Retro Air Handling $611,000 Portsmouth............ Units From Constant Volume; Reheat to Variable Air Volume... ---------------------------------------------------------------------------------------------------------------- SEC. 2407. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS. In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table: Improvement of Conveyed Utility Systems ---------------------------------------------------------------------------------------------------------------- State Installation or Location Project ---------------------------------------------------------------------------------------------------------------- Alabama...................................... Fort Novosel.................................. Construct a 10 MW RICE Generator Plant and Micro- Grid Controls Georgia...................................... Fort Moore.................................... Construct 4.8MW Generation and Microgrid Fort Stewart................................. Construct a 10 MW Generation Plant, with Microgrid Controls New York..................................... Fort Drum..................................... Well Field Expansion Project North Carolina............................... Fort Liberty.................................. Construct 10 MW Microgrid Utilizing Existing and New Generators Fort Liberty.................................. Fort Liberty Emergency Water System ---------------------------------------------------------------------------------------------------------------- SEC. 2408. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS. In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table: Improvement of Conveyed Utility Systems ---------------------------------------------------------------------------------------------------------------- State Installation or Location Project ---------------------------------------------------------------------------------------------------------------- Georgia...................................... Fort Stewart - Hunter Army Airfield........... Power Generation and Microgrid Kansas....................................... Fort Riley.................................... Power Generation and Microgrid Texas........................................ Fort Cavazos.................................. Power Generation and Microgrid ---------------------------------------------------------------------------------------------------------------- TITLE XXVI--GUARD AND RESERVE FORCES FACILITIES SEC. 2601. AUTHORIZED ARMY NATIONAL GUARD CONSTRUCTION AND LAND ACQUISITION PROJECTS. Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the Army National Guard locations inside the United States, and in the amounts, set forth in the following table: [[Page S3663]] Army National Guard ---------------------------------------------------------------------------------------------------------------- State Location Amount ---------------------------------------------------------------------------------------------------------------- Arizona..................................... Surprise Readiness Center........................ $15,000,000 Florida..................................... Camp Blanding.................................... $11,000,000 Idaho....................................... Jerome County Regional Site...................... $17,000,000 Illinois.................................... North Riverside Armory........................... $24,000,000 Kentucky Burlington....................................... $16,400,000 Mississippi Southaven........................................ $22,000,000 Missouri.................................... Belle Fontaine................................... $28,000,000 New Hampshire............................... Littleton........................................ $23,000,000 New Mexico.................................. Rio Rancho Training Site......................... $11,000,000 New York.................................... Lexington Avenue Armory.......................... $90,000,000 Ohio........................................ Camp Perry Joint Training Center................. $19,200,000 Oregon Washington County Readiness Center............... $26,000,000 Pennsylvania................................ Hermitage Readiness Center....................... $13,600,000 Rhode Island................................ North Kingstown.................................. $30,000,000 South Carolina.............................. Aiken County Readiness Center.................... $20,000,000 McCrady Training Center.......................... $7,900,000 Virginia.................................... Sandston RC & FMS 1.............................. $20,000,000 Wisconsin................................... Viroqua.......................................... $18,200,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2602. AUTHORIZED ARMY RESERVE CONSTRUCTION AND LAND ACQUISITION PROJECTS. Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the Army Reserve locations inside the United States, and in the amounts, set forth in the following table: Army Reserve ---------------------------------------------------------------------------------------------------------------- State Location Amount ---------------------------------------------------------------------------------------------------------------- Alabama..................................... Birmingham....................................... $57,000,000 Arizona..................................... San Tan Valley................................... $12,000,000 California.................................. Fort Hunter Liggett.............................. $40,000,000 Parks Reserve Forces Training Area............... $35,000,000 Georgia..................................... Marine Corps Logistics Base Albany.............. $40,000,000 Massachusetts............................... Devens Reserve Forces Training Area............. $39,000,000 Puerto Rico................................. Fort Buchanan.................................... $39,000,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2603. AUTHORIZED NAVY RESERVE AND MARINE CORPS RESERVE CONSTRUCTION AND LAND ACQUISITION PROJECTS. Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the Navy Reserve and Marine Corps Reserve locations inside the United States, and in the amounts, set forth in the following table: Navy Reserve and Marine Corps Reserve ---------------------------------------------------------------------------------------------------------------- State Location Amount ---------------------------------------------------------------------------------------------------------------- Michigan.................................... Battle Creek..................................... $24,549,000 Virginia.................................... Marine Forces Reserve Dam Neck Virginia Beach.... $12,400,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2604. AUTHORIZED AIR NATIONAL GUARD CONSTRUCTION AND LAND ACQUISITION PROJECTS. Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the Air National Guard locations inside the United States, and in the amounts, set forth in the following table: Air National Guard ---------------------------------------------------------------------------------------------------------------- State Location Amount ---------------------------------------------------------------------------------------------------------------- Alabama..................................... Montgomery Regional Airport...................... $7,000,000 Alaska...................................... Joint Base Elmendorf - Richardson................ $7,000,000 Arizona..................................... Tucson International Airport..................... $11,600,000 Arkansas.................................... Ebbing Air National Guard Base................... $76,000,000 Colorado.................................... Buckley Space Force Base......................... $12,000,000 Georgia..................................... Savannah/Hilton Head International Airport....... $27,000,000 Indiana..................................... Fort Wayne International Airport................. $8,900,000 Oregon...................................... Portland International Airport................... $71,500,000 Pennsylvania................................ Harrisburg International Airport................. $8,000,000 Wisconsin................................... Truax Field...................................... $5,200,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2605. AUTHORIZED AIR FORCE RESERVE CONSTRUCTION AND LAND ACQUISITION PROJECTS. Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the Air Force Reserve locations inside the United States, and in the amounts, set forth in the following table: [[Page S3664]] Air Force Reserve ---------------------------------------------------------------------------------------------------------------- State Location Amount ---------------------------------------------------------------------------------------------------------------- Arizona..................................... Davis - Monthan Air Force Base................... $8,500,000 California.................................. March Air Reserve Base........................... $226,500,000 Guam........................................ Joint Region Marianas............................ $27,000,000 Louisiana................................... Barksdale Air Force Base......................... $7,000,000 Texas....................................... Naval Air Station Joint Reserve Base Fort Worth.. $16,000,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2606. AUTHORIZATION OF APPROPRIATIONS, NATIONAL GUARD AND RESERVE. Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for the costs of acquisition, architectural and engineering services, and construction of facilities for the Guard and Reserve Forces, and for contributions therefor, under chapter 1803 of title 10, United States Code (including the cost of acquisition of land for those facilities), as specified in the funding table in section 4601. SEC. 2607. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2018 PROJECT AT HULMAN REGIONAL AIRPORT, INDIANA. (a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in subsection (b), as provided in section 2604 of that Act (131 Stat. 1836) and extended by section 2608 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (b) Table.--The table referred to in subsection (a) is as follows: National Guard and Reserve: Extension of 2018 Project Authorization ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State Location Project Amount ---------------------------------------------------------------------------------------------------------------- Indiana.............................. Hulman Regional Airport Construct Small Arms $8,000,000 Range................. ---------------------------------------------------------------------------------------------------------------- SEC. 2608. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2019 PROJECT AT FRANCIS S. GABRESKI AIRPORT, NEW YORK. (a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2240), the authorization set forth in the table in subsection (b), as provided in section 2604 of that Act (132 Stat. 2255), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (b) Table.--The table referred to in subsection (a) is as follows: National Guard and Reserve: Extension of 2019 Project Authorization ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State Location Project Amount ---------------------------------------------------------------------------------------------------------------- New York............................. Francis S. Gabreski Security Forces/Comm. $20,000,000 Airport............... Training Facility..... ---------------------------------------------------------------------------------------------------------------- SEC. 2609. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2021 PROJECTS. (a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021 (division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in subsection (b), as provided in sections 2601, 2602, and 2604 of that Act (134 Stat. 4312, 4313, 4314), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later. (b) Table.--The table referred to in subsection (a) is as follows: National Guard and Reserve: Extension of 2021 Project Authorizations ---------------------------------------------------------------------------------------------------------------- Installation or Original Authorized State/Country Location Project Amount ---------------------------------------------------------------------------------------------------------------- Arkansas............................. Fort Chaffee........... National Guard $15,000,000 Readiness Center...... California........................... Bakersfield............ National Guard Vehicle $9,300,000 Maintenance Shop...... Colorado............................. Peterson Space Force National Guard $15,000,000 Base.................. Readiness Center...... Guam................................. Joint Region Marianas.. Space Control Facility $20,000,000 #5.................... Ohio................................. Columbus............... National Guard $15,000,000 Readiness Center...... Massachusetts........................ Devens Reserve Forces Automated Multipurpose $8,700,000 Training Area......... Machine Gun Range..... North Carolina....................... Asheville.............. Army Reserve Center/ $24,000,000 Land.................. Puerto Rico.......................... Fort Allen............. National Guard $37,000,000 Readiness Center...... South Carolina....................... Joint Base Charleston. National Guard $15,000,000 Readiness Center...... Texas................................ Fort Worth............. Aircraft Maintenance $6,000,000 Hangar Addition/Alt... Joint Base San Antonio. F-16 Mission Training $10,800,000 Center................ Virgin Islands....................... St. Croix.............. Army Aviation Support $28,000,000 Facility (AASF)....... ....................... CST Ready Building..... $11,400,000 ---------------------------------------------------------------------------------------------------------------- SEC. 2610. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2022 PROJECT AT NICKELL MEMORIAL ARMORY, KANSAS. (a) Transfer Authority.--From amounts appropriated for ``Military Construction, Army National Guard'' pursuant to the authorization of appropriations in section 2606 and available as specified in the funding table in section 4601 of the National Defense Authorization Act for Fiscal Year 2022 (Public Law 117-81, 135 Stat. 2315), the Secretary of Defense may transfer not more than $420,000 to an appropriation for ``Military Construction, Air National Guard'' for use for studying, planning, designing, and architect and engineer services for a sensitive compartmented information facility project at Nickell Memorial Armory, Kansas. (b) Merger of Amounts Transferred.--Any amount transferred under subsection (a) shall be merged with and available for the same purposes, and for the same time period, as the ``Military Construction, Air National Guard'' appropriation to which transferred. (c) Authority.--Using amounts transferred pursuant to subsection (a), the Secretary of the Air Force may carry out study, planning, design, and architect and engineer services activities for a sensitive compartmented information facility project at Nickell Memorial Armory, Kansas. SEC. 2611. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2023 PROJECT AT CAMP PENDLETON, CALIFORNIA. In the case of the authorization contained in the table in section 2602 of the Military [[Page S3665]] Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263) and specified in the funding table in section 4601 of the James M. Inhofe National Defense Authorization Act for Fiscal Year 2023 (Public Law 117-263) for Camp Pendleton, California, for construction of an Area Maintenance Support Activity, the Secretary of the Army may construct a 15,000 square foot facility. ______