S.Amdt. 2582Senate118th Congress (2023-2025)
S.Amdt. 2582
Sponsored by
Sen. Markwayne Mullin (R-OK)
Submitted July 11, 2024
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
July 11, 2024
Text
Submitted
SA 2582. Mr. MULLIN submitted an amendment intended to be proposed by him to the bill S. 4638, to authorize appropriations for fiscal year 2025 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place in title XXVIII, insert the following: SEC. 28__. PLAN AND COST ESTIMATE TO COMPLETE BORDER BARRIER ON SOUTHWEST BORDER OF UNITED STATES. (a) In General.--Subject to the availability of appropriations, the Commanding General of the Army Corps of Engineers, in consultation with the heads of other Federal agencies, as appropriate, shall submit to the congressional defense committees and the Committee on Environment and Public Works of the Senate, not later than March 30, 2025, a plan and cost estimate for completing the construction of a physical barrier along the southwest border of the United States within a two-year period. (b) Elements.--The plan and cost estimate required under subsection (a) shall include the following: (1) An assessment of existing barriers along the southwest border of the United States, including the length of existing barriers that have fallen into disrepair and would require replacement. (2) An estimate of the length of new construction that would be required to complete the construction of a physical barrier along the southwest border of the United States, factoring in the assessment under paragraph (1). (3) An assessment of advisability of physical barrier construction due to natural terrain features, land ownership status, land preservation considerations, at risk species, and other considerations as determined appropriate by the Commanding General of the Army Corps of Engineers. (4) A detailed map of new construction, including planned locations for gates and other access points along the physical barrier. (5) A detailed map of the land that may be impacted by pre- construction activities, construction activities, post- construction cleanup, and other construction-related activities, including a clear identification of impacted public land, private land, tribal land, and Indigenous and other cultural sites. (6) An assessment of any land preservation considerations, including an assessment of site restoration, environmental mitigation, habitat mitigation, and other mitigation as determined appropriate for land assessed under paragraphs (1) and (3), as well as an identification of any impact to farm or ranch land, and military bases and ranges. (7) A detailed consultation plan for State, local, and Tribal community engagement and stakeholder engagement, including specifics on Tribal consultation, to be completed within one year. (8) A detailed identification of the materials required to complete the construction described in subsection (a), including any electrical, lighting, sensors, and other fixtures, and the estimated cost of those materials. (9) An estimated number of personnel that would be required to complete the construction of a physical barrier within two years and an estimated cost of such labor. (10) An assessment of any additional construction that would be advisable to support a physical barrier along the southwest border of the United States, such as access roads or watch towers, and an estimated cost of such construction. (11) An assessment of any monitoring, sensing, and other technologies that would be advisable for securing the southwest border of the United States and an estimated cost of those technologies. (12) An assessment of the requirements for maintaining the physical barrier along the southwest border of the United States, including replacement of panels and anticipated repair requirements, and an estimated annual cost of such maintenance. (c) Exclusion.--The plan and cost estimate required under subsection (a) shall exclude any land for which a State has requested excess materials for construction projects pursuant to section 2890 of the National Defense Authorization Act for Fiscal Year 2024 (Public Law 118-31). (d) Increase.--The amount specified in E-10, line 470 for the Office of the Secretary of Defense is hereby increased by $5,000,000, with the amount of such increase to be used to carry out the plan and cost estimate required under subsection (a). (e) Offset.--The amount specified in D-10, line 1 of the Airland Mark is hereby decreased by $5,000,000. [[Page S4926]] ______