S.Amdt. 3096Senate119th Congress (2025-2027)
S.Amdt. 3096
Sponsored by
Sen. Ted Cruz (R-TX)
Submitted July 29, 2025
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
July 29, 2025
Text
Submitted
SA 3096. Mr. CRUZ submitted an amendment intended to be proposed by him to the bill S. 2296, to authorize appropriations for fiscal year 2026 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the end of subtitle B of title I, add the following: SEC. 112. AUTHORIZATION TO INITIATE EARLY PRODUCTION OF FUTURE LONG RANGE ASSAULT AIRCRAFT. (a) Authorization.--The Secretary of the Army may enter into contracts, in advance of full-rate production, for the procurement of not more than 24 future long range assault aircraft as part of an accelerated low-rate early production effort. (b) Objectives.--In carrying out the early production effort described in subsection (a), the Secretary of the Army shall pursue the following objectives: (1) To expedite delivery of future long range assault aircraft operational capability to the warfighter. (2) To maintain momentum and learning continuity between test article completion and full production ramp-up. (3) To stabilize and retain the specialized workforce and industrial base supporting future long range assault aircraft, including critical suppliers and production facilities in Texas, Kansas, and other States. (4) To mitigate cost escalation risks and improve program affordability across the life cycle. (c) Considerations.--In executing the authority provided by subsection (a), the Secretary shall-- (1) prioritize program continuity, cost-efficiency, and workforce retention across the supply chain for tiltrotor aircraft; (2) ensure that aircraft procured as part of the early production effort described in subsection (a) incorporate lessons learned from test article evaluations; and (3) maintain flexibility in design to accommodate future upgrades through the modular open systems architecture and digital backbone. (d) Report to Congress.--Not later than 180 days after the date of the enactment of this Act, the Secretary of the Army shall submit to the congressional defense committees a report detailing-- (1) the implementation plan and timeline for the procurement and early production effort described in subsection (a); (2) the status of industrial base readiness and supply chain coordination; and (3) estimated long-term cost savings and operational benefits derived from such early production effort. ______