S.Amdt. 3166Senate119th Congress (2025-2027)
S.Amdt. 3166
Sponsored by
Sen. Mark R. Warner (D-VA)
Submitted July 30, 2025
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
July 30, 2025
Text
Submitted
SA 3166. Mr. WARNER (for himself and Mr. Kaine) submitted an amendment intended to be proposed by him to the bill S. 2296, to authorize appropriations for fiscal year 2026 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place in subtitle F of title X, insert the following: SEC. 10__. VIRGINIA PENINSULA COASTAL STORM RISK MANAGEMENT, VIRGINIA. (a) In General.--In carrying out the feasibility study for flood risk management, ecosystem restoration, and navigation, Coastal Virginia, authorized by section 1201(9) of the Water Resources Development Act of 2018 (132 Stat. 3802), the Secretary of the Army (referred to in this section as the ``Secretary'') is authorized to use funds made available to the Secretary for water resources development investigations to analyze, at full Federal expense, a measure benefitting Federal land under the administrative jurisdiction of another Federal agency. (b) Savings Provisions.--Nothing in this section-- (1) precludes-- (A) a Federal agency with administrative jurisdiction over Federal land in the study area from contributing funds for any portion of the cost of analyzing a measure as part of the study described in subsection (a) that benefits that land; or (B) the Secretary, at the request of the non-Federal interest for the study described in subsection (a), from using funds made available to the Secretary for water resources development investigations to formulate measures to reduce risk to a military installation, if the non-Federal interest shares in the cost to formulate those measures to the same extent that the non-Federal interest is required to share in the cost of the study; or (2) waives the cost-sharing requirements of a Federal agency for the construction of an authorized water resources development project or a separable element of that project that results from the study described in subsection (a). ______