S.Amdt. 3953Senate119th Congress (2025-2027)2nd degree
S.Amdt. 3953
Sponsored by
Sen. Josh Hawley (R-MO)
Submitted November 20, 2025
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
November 20, 2025
Text
Submitted
SA 3953. Mr. HAWLEY submitted an amendment intended to be proposed to amendment SA 3951 submitted by Ms. Collins and intended to be proposed to the bill H.R. 4016, making appropriations for the Department of Defense for the fiscal year ending September 30, 2026, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place, insert the following: west lake landfill superfund site Sec. ___. (a) Not later than 120 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall submit to the Committee on Appropriations of the Senate and the Committee on Appropriations of the House of Representatives a report detailing the current and projected remediation needs, staffing requirements, and estimates of the latest timeline for removing hazardous waste residing at the West Lake Landfill Superfund Site, Bridgeton, Missouri. (b) The report required by subsection (a) shall-- (1) assess current drilling operations at the superfund site described in that subsection to refine excavation areas during the pre-excavation confirmation sampling phase, specifically-- (A) determine if those drilling activities are expediting the pre-excavation process; and (B) evaluate if those drilling operations are precisely measuring which areas require remediation; (2) evaluate potential barriers to proceeding to remedial work, including-- (A) any delays by potentially responsible parties in agreeing to a consent decree for remedial action and efforts to expedite those delays; (B) the ability to hire remedial action contractors and any other third parties needed to prepare the site for remedial action work; and (C) needed staffing requirements to expedite document review times and oversight of remedial action, including technical staff, project management staff with radiation experience, landfill expert staff, and technical staff with construction experience; (3) estimate the total cost of conducting all necessary radioactive mitigation activities for remediation of the superfund site described in that subsection and any remaining resource needs; (4) detail specific expected timelines for-- (A) the approval of the remedial design plan; (B) the ability of potentially responsible parties to expeditiously complete confirmation sampling, site preparation, and necessary contracting for remedial action; and (C) the final remediation of the superfund site described in that subsection; and (5) summarize efforts to engage with the local community and provide regular communications about remedial work. ____________________