H.R. 3597House108th Congress (2003-2005)Passed House

To authorize the Secretary of the Interior, through the Bureau of Reclamation, to conduct a feasibility study on the Alder Creek water storage and conservation project in El Dorado County, California, and for other purposes.

Introduced November 21, 2003

Legislative Activity

Stay on top of the latest movement without scrolling through every action

18 earlier actions
SenateIntro Referral Latest Action

Received in the Senate.

September 29, 2004

View full timeline
HouseIntro Referral

Introduced in House

November 21, 2003

HouseIntro Referral

Referred to the House Committee on Resources.

November 21, 2003

HouseIntro Referral

Sponsor introductory remarks on measure. (CR E2429)

November 23, 2003

HouseCommittee

Referred to the Subcommittee on Water and Power.

December 4, 2003

HouseCommittee

Executive Comment Requested from Interior.

December 4, 2003

HouseCommittee

Subcommittee Hearings Held.

May 18, 2004

HouseCommittee

Subcommittee Consideration and Mark-up Session Held.

June 16, 2004

HouseCommittee

Forwarded by Subcommittee to Full Committee (Amended) by Unanimous Consent.

June 16, 2004

HouseCommittee

Committee Consideration and Mark-up Session Held.

July 14, 2004

HouseCommittee

Ordered to be Reported (Amended) by Unanimous Consent.

July 14, 2004

HouseCommittee

Reported (Amended) by the Committee on Resources. H. Rept. 108-646.

September 7, 2004

HouseCalendars

Placed on the Union Calendar, Calendar No. 390.

September 7, 2004

HouseFloor

Mr. Radanovich moved to suspend the rules and pass the bill, as amended.

September 28, 2004 • 3:55 PM

HouseFloor

Considered under suspension of the rules. (consideration: CR H7679-7680)

September 28, 2004 • 3:55 PM

HouseFloor

DEBATE - The House proceeded with forty minutes of debate on H.R. 3597.

September 28, 2004 • 3:55 PM

HouseFloor

Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.(text: CR H7679-7680)

September 28, 2004 • 3:56 PM

HouseFloor

On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H7679-7680)

September 28, 2004 • 3:56 PM

HouseFloor

Motion to reconsider laid on the table Agreed to without objection.

September 28, 2004 • 3:57 PM

SenateIntro Referral

Received in the Senate.

September 29, 2004

Floor Debate

2 members

What members said about H.R. 3597 on the floor

1 Republican1 Democrat
George Radanovich
Rep. George RadanovichR-CA-19 · Sep 28, 2004

Mr. Speaker, I move to suspend the rules and pass the bill (H.R. 3597) to authorize the Secretary of the Interior, through the Bureau of Reclamation, to conduct a feasibility study on the Alder Creek…

George Radanovich
Rep. George RadanovichR-CA-19 · Sep 28, 2004

Mr. Speaker, I ask unanimous consent that all Members may have 5 legislative days within which to revise and extend their remarks and include extraneous material on H. Res. 752, H.R. 3954, H.R. 4066,…

Raúl M. Grijalva
Rep. Raúl M. GrijalvaD-AZ-7 · Sep 28, 2004

Mr. Speaker, I yield myself such time as I may consume. Mr. Speaker, we have no objection to the consideration of this measure. Mr. Speaker, I yield back the balance of my time.

Bill Text

4 versions available

Reading Mode
Latest
Received in SenateIssued September 29, 2004
        [Congressional Bills 108th Congress]
[From the U.S. Government Publishing Office]
[H.R. 3597 Received in Senate (RDS)]

2d Session
H. R. 3597

_______________________________________________________________________

IN THE SENATE OF THE UNITED STATES

September 29, 2004

Received

_______________________________________________________________________

AN ACT

To authorize the Secretary of the Interior, through the Bureau of
Reclamation, to conduct a feasibility study on the Alder Creek water
storage and conservation project in El Dorado County, California, and
for other purposes.

Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,

SECTION 1. STUDY AND REPORT.

(a) Study.--Pursuant to the Reclamation Act of 1902 (32 Stat. 388)
and Acts amendatory thereof and supplemental thereto, the Secretary of
the Interior (referred to in this section as the ``Secretary''),
through the Bureau of Reclamation, and in consultation and cooperation
with the El Dorado Irrigation District, is authorized to conduct a
study to determine the feasibility of constructing a project on Alder
Creek in El Dorado County, California, to store water and provide water
supplies during dry and critically dry years for consumptive use,
recreation, in-stream flows, irrigation, and power production.
(b) Report.--
(1) Transmission.--Upon completion of the study authorized
by subsection (a), the Secretary shall transmit to the
Committee on Resources of the House of Representatives and the
Committee on Energy and Natural Resources of the Senate a
report containing the results of the study.
(2) Contents of report.--The report shall contain
appropriate cost sharing options for the implementation of the
project based upon the use and possible allocation of any
stored water.
(3) Use of available materials.--In developing the report
under this section, the Secretary shall use reports and any
other relevant information supplied by the El Dorado Irrigation
District.
(c) Cost Share.--
(1) Federal share.--The Federal share of the costs of the
feasibility study authorized by this section shall not exceed
50 percent of the total cost of the study.
(2) In-kind contribution for non-federal share.--The
Secretary may accept as part of the non-Federal cost share the
contribution such in-kind services by the El Dorado Irrigation
District as the Secretary determines will contribute to the
conduct and completion of the study.
(d) Authorization of Appropriations.--There is authorized to be
appropriated $3,000,000 to carry out this section.

Passed the House of Representatives September 28, 2004.

Attest:

JEFF TRANDAHL,

Clerk.