H.R. 5031House109th Congress (2005-2007)In Committee

To extend Corridor O of the Appalachian Development Highway System from its current southern terminus at I-68 near Cumberland to Corridor H, which stretches from Weston, West Virginia, to Strasburg, Virginia.

Introduced March 28, 2006

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
HouseCommittee Latest Action

Referred to the Subcommittee on Highways, Transit and Pipelines.

March 29, 2006

View full timeline
HouseIntro Referral

Introduced in House

March 28, 2006

HouseIntro Referral

Referred to the House Committee on Transportation and Infrastructure.

March 28, 2006

HouseCommittee

Referred to the Subcommittee on Highways, Transit and Pipelines.

March 29, 2006

Floor Debate

3 members

What members said about H.R. 5031 on the floor

2 Republicans1 Democrat
Chuck Hagel
Sen. Chuck HagelR-NE · Oct 25, 2005

Mr. President, I rise today to introduce my comprehensive immigration reform legislation. This legislative package consists of four bills that deal with national security, employment security,…

John Ensign
Sen. John EnsignR-NV · Oct 25, 2005

Mr. President, I rise along with my colleagues, Senators Landrieu, Byrd, Specter, Lott, Lieberman, Inouye, Levin, and DeMint, in order to introduce the Virgie S. Arden American Horse Slaughter…

Barack Obama
Sen. Barack ObamaD-IL · Oct 25, 2005

Mr. President, the House of Representatives has passed, and the Senate Environment and Public Works Committee is considering, legislation to increase petroleum refinery capacity in the United States.…

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in HouseIssued March 28, 2006

I

109th CONGRESS

2d Session

H. R. 5031

IN THE HOUSE OF REPRESENTATIVES

March 28, 2006

Mr. Mollohan introduced the following bill; which was referred to the Committee on Transportation and Infrastructure

A BILL

To extend Corridor O of the Appalachian Development Highway System from its current southern terminus at I–68 near Cumberland to Corridor H, which stretches from Weston, West Virginia, to Strasburg, Virginia.

1.

Appalachian development highway system

Section 14501 of title 40, United States Code, is amended by striking subsection (a) and inserting the following:

(a)

Purpose

(1)

In general

The Secretary of Transportation may assist in the construction of an Appalachian development highway system and local access roads serving the Appalachian region to provide a highway system that, in conjunction with the Interstate System and other Federal-aid highways in the Appalachian region, will open an area with developmental potential in which commerce and communication have been inhibited by lack of adequate access.

(2)

Limitations

(A)

Construction

Construction on the development highway system described in paragraph (1) shall not be greater than 3,1251/2 miles.

(B)

Local access roads

There shall not be more than 1,400 miles of local access roads that—

(i)

serve—

(I)

specific recreational, residential, educational, commercial, industrial; or

(II)

similar facilities; or

(ii)

facilitate a school consolidation program.

.

2.

Designation of Addition

(a)

In general

There is designated as an addition to Corridor O in Maryland and West Virginia on the Appalachian Development Highway System a segment from Interstate Route 68 to Corridor H.

(b)

Extension and development

The addition to Corridor O shall—

(1)

extend approximately 351/2 miles; and

(2)

be developed as a multilane freeway, with interchanges at appropriate crossroad locations.