To authorize the Secretary of the Interior to convey the Newlands Project Headquarters and Maintenance Yard Facility to the Truckee-Carson Irrigation District.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
May 17, 2005
View full timeline
Introduced in House
February 2, 2005
Referred to the House Committee on Resources.
February 2, 2005
Referred to the Subcommittee on Water and Power.
February 16, 2005
Mr. Renzi moved to suspend the rules and pass the bill, as amended.
May 16, 2005 • 2:55 PM
Considered under suspension of the rules. (consideration: CR H3278-3283)
May 16, 2005 • 2:55 PM
DEBATE - The House proceeded with forty minutes of debate on H.R. 540.
May 16, 2005 • 2:55 PM
Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.(text: CR H3278-3281)
May 16, 2005 • 3:04 PM
On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H3278-3281)
May 16, 2005 • 3:04 PM
Motion to reconsider laid on the table Agreed to without objection.
May 16, 2005 • 3:04 PM
The title of the measure was amended. Agreed to without objection.
May 16, 2005 • 3:04 PM
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
May 17, 2005
Floor Debate
9 membersWhat members said about H.R. 540 on the floor




+4
Floor Debate
9 membersWhat members said about H.R. 540 on the floor
Mr. Speaker, I rise today in favor of H.R. 540. This bill would authorize the Equus Beds Aquifer recharge project in my district that will help meet the water needs of nearly 500,000 people in…
Mr. Speaker, first, let me thank my good friend and colleague from Arizona for allowing me the privilege to rise today in support of legislation I introduced, the Newlands Project Headquarters and…
Mr. Speaker, I move to suspend the rules and pass the bill (H.R. 540) to authorize the Secretary of the Interior to convey the Newlands Project Headquarters and Maintenance Yard Facility to the…
Mr. Speaker, I rise in support of H.R. 540, a bill that will authorize a variety of water projects including several in my congressional district. I want to thank Chairman Pombo and Ranking Member…
Mr. Speaker, I rise today to thank House Resources Chairman Richard Pombo and Subcommittee on Water and Power Chairman George Radanovich, for their hard work in moving H.R. 802 as a part of this…
Show 4 more
Mr. Speaker, I thank the gentleman for yielding me time this afternoon. Mr. Speaker, I rise in strong support of this legislation which will help several local communities around the country address…
Mr. Speaker, I move to suspend the rules and pass the Senate bill (S. 310) to direct the Secretary of the Interior to convey the Newlands Project Headquarters and Maintenance Yard Facility to the…
Mr. Speaker, I yield myself such time as I may consume. (Mr. UDALL of New Mexico asked and was given permission to revise and extend his remarks.) Mr. Speaker, we support passage of H.R. 540 and the…
Mr. Speaker, I yield myself such time as I may consume. (Ms. BORDALLO asked and was given permission to revise and extend her remarks.) Mr. Speaker, we on this side of the aisle have no objection to…
Bill Text
3 versions available
[Congressional Bills 109th Congress]
[From the U.S. Government Publishing Office]
[H.R. 540 Referred in Senate (RFS)]
1st Session
H. R. 540
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
May 17, 2005
Received; read twice and referred to the Committee on Energy and
Natural Resources
_______________________________________________________________________
AN ACT
To authorize the Secretary of the Interior to convey the Newlands
Project Headquarters and Maintenance Yard Facility to the Truckee-
Carson Irrigation District.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. TABLE OF CONTENTS.
The table of contents for this Act is as follows:
Sec. 1. Table of contents.
TITLE I--NEWLANDS PROJECT HEADQUARTERS AND MAINTENANCE YARD FACILITY
TRANSFER
Sec. 101. Short title.
Sec. 102. Conveyance of Newlands Project Headquarters and Maintenance
Yard Facility.
TITLE II--INLAND EMPIRE AND CUCAMONGA VALLEY RECYCLING PROJECTS
Sec. 201. Inland Empire and Cucamonga Valley recycling projects.
TITLE III--RIVERSIDE-CORONA FEEDER WATER PROJECT
Sec. 301. Planning, design, and construction of the Riverside-Corona
Feeder.
Sec. 302. Project authorizations.
TITLE IV--AINSWORTH UNIT, SANDHILLS DIVISION, PICK-SLOAN MISSOURI BASIN
PROGRAM
Sec. 401. Ainsworth Unit, Sandhills Division, Pick-Sloan Missouri Basin
Program.
TITLE V--WICHITA PROJECT EQUUS BEDS DIVISION
Sec. 501. Short title.
Sec. 502. Equus Beds Division.
TITLE VI--LOWER RIO GRANDE VALLEY WATER RESOURCES CONSERVATION AND
IMPROVEMENT
Sec. 601. Short title.
Sec. 602. Authorization of additional projects and activities under the
lower rio grande water conservation and
improvement program.
Sec. 603. Reauthorization of appropriations for lower rio grande
construction.
Sec. 604. Sunset provision.
TITLE VII--BROWNSVILLE PUBLIC UTILITY BOARD WATER RECYCLING AND
DESALINIZATION PROJECT
Sec. 701. Brownsville Public Utility Board water recycling and
desalinization project.
TITLE VIII--EL PASO, TEXAS, WATER RECLAMATION, REUSE, AND
DESALINIZATION PROJECT
Sec. 801. El Paso, Texas, water reclamation, reuse, and desalinization
project.
TITLE I--NEWLANDS PROJECT HEADQUARTERS AND MAINTENANCE YARD FACILITY
TRANSFER
SEC. 101. SHORT TITLE.
This title may be cited as the ``Newlands Project Headquarters and
Maintenance Yard Facility Transfer Act''.
SEC. 102. CONVEYANCE OF NEWLANDS PROJECT HEADQUARTERS AND MAINTENANCE
YARD FACILITY.
(a) Conveyance.--The Secretary of the Interior shall convey to the
Truckee-Carson Irrigation District, Nevada, as soon as practicable
after the date of the enactment of this Act and in accordance with all
applicable law and the terms of the memorandum of agreement between the
District and the Secretary dated June 9, 2003 (Contract No. 3-LC-20-
8052), all right, title, and interest of the United States in and to
real property within the Newlands Projects, Nevada, known as 2666
Harrigan Road, Fallon, Nevada, and identified for disposition on the
map entitled ``Newlands Project Headquarters and Maintenance Yard
Facility''.
(b) Treatment of Proceeds From Fallon Freight Yard as
Consideration.--Notwithstanding any other provision of law to the
contrary, amounts received by the United States for the lease and sale
of Newlands Project lands comprising the Fallon Freight Yard shall, for
purposes of this section, be treated as payment in full of
consideration for the property conveyed under subsection (a).
(c) Report.--If the Secretary has not completed such conveyance
within 12 months after the date of enactment of this Act, the Secretary
shall submit a report to the Congress explaining the reasons the
conveyance has not been completed and stating the date by which the
conveyance will be completed.
(d) Environmental Review, Remediation, and Removal.--The Secretary
may not make any conveyance under this section until the completion
with respect to the conveyance, in accordance with the memorandum of
agreement referred to in subsection (a), of--
(1) compliance with requirements relating to the National
Environmental Policy Act of 1969 (42 U.S.C. et seq. 4321 et
seq.) and cultural resources; and
(2) environmental site assessments, remediation, or
removal.
(e) Liability.--The United States shall not be liable for damages
of any kind arising out of any act or omission by, or occurrence
relating to, the Truckee-Carson Irrigation District or its employees,
agents, or contractors relating to the property conveyed under this
section and occurring prior to, on, or after the date of such
conveyance.
TITLE II--INLAND EMPIRE AND CUCAMONGA VALLEY RECYCLING PROJECTS
SEC. 201. INLAND EMPIRE AND CUCAMONGA VALLEY RECYCLING PROJECTS.
(a) Short Title.--This section may be cited as the ``Inland Empire
Regional Water Recycling Initiative''.
(b) In General.--The Reclamation Wastewater and Groundwater Study
and Facilities Act (Public Law 102-575, Title XVI; 43 U.S.C. 390h et
seq.) is amended by adding at the end the following:
``SEC. 1637. INLAND EMPIRE REGIONAL WATER RECYCLING PROJECT.
``(a) In General.--The Secretary, in cooperation with the Inland
Empire Utilities Agency, may participate in the design, planning, and
construction of the Inland Empire regional water recycling project
described in the report submitted under section 1606(c).
``(b) Cost Sharing.--The Federal share of the cost of the project
described in subsection (a) shall not exceed 25 percent of the total
cost of the project.
``(c) Limitation.--Funds provided by the Secretary shall not be
used for operation and maintenance of the project described in
subsection (a).
``(d) Authorization of Appropriations.--There is authorized to be
appropriated to carry out this section $20,000,000.
``(e) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.
``SEC. 1638. CUCAMONGA VALLEY WATER RECYCLING PROJECT.
``(a) In General.--The Secretary, in cooperation with the Cucamonga
Valley Water District, may participate in the design, planning, and
construction of the Cucamonga Valley Water District satellite recycling
plants in Rancho Cucamonga, California, to reclaim and recycle
approximately 2 million gallons per day of domestic wastewater.
``(b) Cost Sharing.--The Federal share of the cost of the project
described in subsection (a) shall not exceed 25 percent of the capital
cost of the project.
``(c) Limitation.--Funds provided by the Secretary shall not be
used for operation and maintenance of the project described in
subsection (a).
``(d) Authorization of Appropriations.--There is authorized to be
appropriated to carry out this section, $10,000,000.
``(e) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.''.
(c) Conforming Amendments.--The table of sections in section 2 of
Public Law 102-575 is amended by inserting after the item relating to
section 1636 the following:
``1637. Inland Empire Regional Water Recycling Program.
``1638. Cucamonga Valley Water Recycling Project.''.
TITLE III--RIVERSIDE-CORONA FEEDER WATER PROJECT
SEC. 301. PLANNING, DESIGN, AND CONSTRUCTION OF THE RIVERSIDE-CORONA
FEEDER.
(a) In General.--The Secretary of the Interior, in cooperation with
the Western Municipal Water District, may participate in a project to
plan, design, and construct a water supply project, the Riverside-
Corona Feeder, which includes 20 groundwater wells and 28 miles of
pipeline in San Bernardino and Riverside Counties, California.
(b) Agreements and Regulations.--The Secretary may enter into such
agreements and promulgate such regulations as are necessary to carry
out this section.
(c) Federal Cost Share.--
(1) Planning, design, construction.--The Federal share of
the cost to plan, design, and construct the project described
in subsection (a) shall be the lesser of 35 percent of the
total cost of the project or $50,000,000.
(2) Studies.--The Federal share of the cost to complete the
necessary planning study associated with the project described
in subsection (a) shall not exceed 50 percent of the total
study cost.
(d) In-Kind Services.--In-kind services performed by the Western
Municipal Water District shall be considered a part of the local cost
share to complete the project described in subsection (a).
(e) Limitation.--Funds provided by the Secretary under this section
shall not be used for operation or maintenance of the project described
in subsection (a).
(f) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.
SEC. 302. PROJECT AUTHORIZATIONS.
(a) In General.--The Reclamation Wastewater and Groundwater Study
and Facilities Act (Public Law 102-575, title XVI; 43 U.S.C. 390h et
seq.) is amended by adding at the end the following:
``SEC. 163_. YUCAIPA VALLEY REGIONAL WATER SUPPLY RENEWAL PROJECT.
``(a) Authorization.--The Secretary, in cooperation with the
Yucaipa Valley Water District, may participate in the design, planning,
and construction of projects to treat impaired surface water, reclaim
and reuse impaired groundwater, and provide brine disposal within the
Santa Ana Watershed described in the report submitted under section
1606.
``(b) Cost Sharing.--The Federal share of the cost of the project
described in subsection (a) shall not exceed 25 percent of the total
cost of the project.
``(c) Limitation.--Funds provided by the Secretary shall not be
used for operation or maintenance of the project described in
subsection (a).
``(d) Authorization of Appropriations.--There is authorized to be
appropriated to carry out this section $20,000,000.
``(e) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.
``SEC. 163_. CITY OF CORONA WATER UTILITY, CALIFORNIA, WATER RECYCLING
AND REUSE PROJECT.
``(a) Authorization.--The Secretary, in cooperation with the City
of Corona Water Utility, California, is authorized to participate in
the design, planning, and construction of, and land acquisition for, a
project to reclaim and reuse wastewater, including degraded
groundwaters, within and outside of the service area of the City of
Corona Water Utility, California.
``(b) Cost Share.--The Federal share of the cost of the project
authorized by this section shall not exceed 25 percent of the total
cost of the project.
``(c) Limitation.--The Secretary shall not provide funds for the
operation and maintenance of the project authorized by this section.
``(d) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.''.
(b) Conforming Amendments.--The table of sections in section 2 of
Public Law 102-575 is amended by inserting after the item relating to
section 163_ the following:
``Sec. 163_. Yucaipa Valley Regional Water Supply Renewal Project.
``Sec. 163_. City of Corona Water Utility, California, water recycling
and reuse project.''.
TITLE IV--AINSWORTH UNIT, SANDHILLS DIVISION, PICK-SLOAN MISSOURI BASIN
PROGRAM
SEC. 401. AINSWORTH UNIT, SANDHILLS DIVISION, PICK-SLOAN MISSOURI BASIN
PROGRAM.
(a) In General.--The Secretary of the Interior shall extend for the
period described in subsection (b) the water service contract for the
Ainsworth Unit, Sandhills Division, Pick-Sloan Missouri Basin Program,
Nebraska, consisting of--
(1) the water service contract entered into by the
Secretary of the Interior under--
(A) section 9(e) of the Reclamation Project Act of
1939 (43 U.S.C. 485h(e));
(B) section 9(c) of the Act of December 22, 1944
(58 Stat. 887, chapter 665);
(C) the Act of August 21, 1954 (68 Stat. 757,
chapter 781); and
(D) the Act of May 18, 1956 (70 Stat. 160, chapter
285); and
(2) the water service contract for the set project located
in Cherry, Brown, and Rock Counties, Nebraska, for the use of a
part of the waters of the Snake River, a tributary of the
Niobrara River.
(b) Period of Extension.--The water service contract described in
subsection (a) shall be extended for 4 years after the date on which
the contract expires under the water service contract and law in
existence before the date of enactment of this Act.
TITLE V--WICHITA PROJECT EQUUS BEDS DIVISION
SEC. 501. SHORT TITLE.
This title may be cited as the ``Wichita Project Equus Beds
Division Authorization Act of 2005''.
SEC. 502. EQUUS BEDS DIVISION.
The Act entitled ``An Act to provide for the construction of the
Cheney division, Wichita Federal reclamation project, Kansas, and for
other purposes'' (Public Law 86-787; 74 Stat. 1026) is amended by
adding the following new section:
``SEC. 10. EQUUS BEDS DIVISION.
``(a) Authorization.--The Secretary of the Interior may assist in
the funding and implementation of the Equus Beds Aquifer Recharge and
Recovery Component which is a part of the `Integrated Local Water
Supply Plan, Wichita, Kansas' (referred to in this section as the
`Equus Beds Division'). Construction of the Equus Beds Division shall
be in substantial accordance with the plans and designs.
``(b) Operation, Maintenance, and Replacement.--Operation,
maintenance, and replacement of the Equus Beds Division, including
funding for those purposes, shall be the sole responsibility of the
City of Wichita, Kansas. The Equus Beds Division shall be operated in
accordance with applicable laws and regulations.
``(c) Agreements.--The Secretary of the Interior may enter into, or
agree to amendments of, cooperative agreements and other appropriate
agreements to carry out this section.
``(d) Administrative Costs.--From funds made available for this
section, the Secretary of the Interior may charge an appropriate share
related to administrative costs incurred.
``(e) Plans and Analyses Consistent With Federal Law.--Before
obligating funds for design or construction under this section, the
Secretary of the Interior shall work cooperatively with the City of
Wichita, Kansas, to use, to the extent possible, plans, designs, and
engineering and environmental analyses that have already been prepared
by the City for the Equus Beds Division. The Secretary of the Interior
shall assure that such information is used consistent with applicable
Federal laws and regulations, including principles and guidelines used
in preparing feasibility level project studies.
``(f) Title; Responsibility; Liability.--Nothing in this section or
assistance provided under this section shall be construed to transfer
title, responsibility, or liability related to the Equus Beds Division
(including portions or features thereof) to the United States.
``(g) Authorization of Appropriations.--There is authorized to be
appropriated as the Federal share of the total cost of the Equus Beds
Division, an amount not to not exceed 25 percent of the total cost or
$30,000,000 (January, 2003 prices), whichever is less, plus or minus
such amounts, if any, as may be justified by reason of ordinary
fluctuations in construction costs as indicated by engineering cost
indexes applicable to the type of construction involved herein,
whichever is less. Such sums shall be nonreimbursable.
``(h) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.''.
TITLE VI--LOWER RIO GRANDE VALLEY WATER RESOURCES CONSERVATION AND
IMPROVEMENT
SEC. 601. SHORT TITLE.
This title may be cited as the ``Lower Rio Grande Valley Water
Resources Conservation and Improvement Act of 2005''.
SEC. 602. AUTHORIZATION OF ADDITIONAL PROJECTS AND ACTIVITIES UNDER THE
LOWER RIO GRANDE WATER CONSERVATION AND IMPROVEMENT
PROGRAM.
(a) Additional Projects.--Section 4(a) of the Lower Rio Grande
Valley Water Resources Conservation and Improvement Act of 2000 (Public
Law 106-576; 114 Stat. 3067) is amended by adding at the end the
following:
``(20) In Cameron County, Texas, Bayview Irrigation
District No. 11, water conservation and improvement projects as
identified in the March 3, 2004, engineering report by NRS
Consulting Engineers at a cost of $1,425,219.
``(21) In the Cameron County, Texas, Brownsville Irrigation
District, water conservation and improvement projects as
identified in the February 11, 2004, engineering report by NRS
Consulting Engineers at a cost of $722,100.
``(22) In the Cameron County, Texas Harlingen Irrigation
District No. 1, water conservation and improvement projects as
identified in the March, 2004, engineering report by Axiom-
Blair Engineering at a cost of $4,173,950.
``(23) In the Cameron County, Texas, Cameron County
Irrigation District No. 2, water conservation and improvement
projects as identified in the February 11, 2004, engineering
report by NRS Consulting Engineers at a cost of $8,269,576.
``(24) In the Cameron County, Texas, Cameron County
Irrigation District No. 6, water conservation and improvement
projects as identified in an engineering report by Turner
Collie Braden, Inc., at a cost of $5,607,300.
``(25) In the Cameron County, Texas, Adams Gardens
Irrigation District No. 19, water conservation and improvement
projects as identified in the March, 2004, engineering report
by Axiom-Blair Engineering at a cost of $2,500,000.
``(26) In the Hidalgo and Cameron Counties, Texas, Hidalgo
and Cameron Counties Irrigation District No. 9, water
conservation and improvement projects as identified by the
February 11 engineering report by NRS Consulting Engineers at a
cost of $8,929,152.
``(27) In the Hidalgo and Willacy Counties, Texas, Delta
Lake Irrigation District, water conservation and improvement
projects as identified in the March, 2004, engineering report
by Axiom-Blair Engineering at a cost of $8,000,000.
``(28) In the Hidalgo County, Texas, Hidalgo County
Irrigation District No. 2, a water conservation and improvement
project identified in the engineering reports attached to a
letter dated February 11, 2004, from the district's general
manager, at a cost of $5,312,475.
``(29) In the Hidalgo County, Texas, Hidalgo County
Irrigation District No. 1, water conservation and improvement
projects identified in an engineering report dated March 5,
2004, by Melden and Hunt, Inc. at a cost of $5,595,018.
``(30) In the Hidalgo County, Texas, Hidalgo County
Irrigation District No. 6, water conservation and improvement
projects as identified in the March, 2004, engineering report
by Axiom-Blair Engineering at a cost of $3,450,000.
``(31) In the Hidalgo County, Texas Santa Cruz Irrigation
District No. 15, water conservation and improvement projects as
identified in an engineering report dated March 5, 2004, by
Melden and Hunt, Inc. at a cost of $4,609,000.
``(32) In the Hidalgo County, Texas, Engelman Irrigation
District, water conservation and improvement projects as
identified in an engineering report dated March 5, 2004, by
Melden and Hunt, Inc. at a cost of $2,251,480.
``(33) In the Hidalgo County, Texas, Valley Acres Water
District, water conservation and improvement projects as
identified in an engineering report dated March, 2004, by
Axiom-Blair Engineering at a cost of $500,000.
``(34) In the Hudspeth County, Texas, Hudspeth County
Conservation and Reclamation District No. 1, water conservation
and improvement projects as identified in the March, 2004,
engineering report by Axiom-Blair Engineering at a cost of
$1,500,000.
``(35) In the El Paso County, Texas, El Paso County Water
Improvement District No. 1, water conservation and improvement
projects as identified in the March, 2004, engineering report
by Axiom-Blair Engineering at a cost of $10,500,000.
``(36) In the Hidalgo County, Texas, Donna Irrigation
District, water conservation and improvement projects
identified in an engineering report dated March 22, 2004, by
Melden and Hunt, Inc. at a cost of $2,500,000.
``(37) In the Hidalgo County, Texas, Hidalgo County
Irrigation District No. 16, water conservation and improvement
projects identified in an engineering report dated March 22,
2004, by Melden and Hunt, Inc. at a cost of $2,800,000.
``(38) The United Irrigation District of Hidalgo County
water conservation and improvement projects as identified in a
March 2004, engineering report by Sigler Winston, Greenwood and
Associates at a cost of $6,067,021.''.
(b) Inclusion of Activities to Conserve Water or Improve Supply;
Transfers Among Projects.--Section 4 of such Act (Public Law 106-576;
114 Stat. 3067) is further amended by redesignating subsection (c) as
subsection (e), and by inserting after subsection (b) the following:
``(c) Inclusion of Activities to Conserve Water or Improve
Supply.--In addition to the activities identified in the engineering
reports referred to in subsection (a), each project that the Secretary
conducts or participates in under subsection (a) may include any of the
following:
``(1) The replacement of irrigation canals and lateral
canals with buried pipelines.
``(2) The impervious lining of irrigation canals and
lateral canals.
``(3) Installation of water level, flow measurement, pump
control, and telemetry systems.
``(4) The renovation and replacement of pumping plants.
``(5) Other activities that will result in the conservation
of water or an improved supply of water.
``(d) Transfers Among Projects.--Of amounts made available for a
project referred to in any of paragraphs (20) through (38) of
subsection (a), the Secretary may transfer and use for another such
project up to 10 percent.''.
SEC. 603. REAUTHORIZATION OF APPROPRIATIONS FOR LOWER RIO GRANDE
CONSTRUCTION.
Section 4(e) of the Lower Rio Grande Valley Water Resources
Conservation and Improvement Act of 2000 (Public Law 106-576; 114 Stat.
3067), as redesignated by section 602(b) of this title, is further
amended by inserting before the period the following: ``for projects
referred to in paragraphs (1) through (19) of subsection (a), and
$42,356,145 (2004 dollars) for projects referred to in paragraphs (20)
through (38) of subsection (a)''.
SEC. 604. SUNSET PROVISION.
The authority of the Secretary to carry out the projects added by
paragraphs (20) through (38) of the amendment made by section 602(a) of
this title shall terminate 10 years after the date of the enactment of
this section.
TITLE VII--BROWNSVILLE PUBLIC UTILITY BOARD WATER RECYCLING AND
DESALINIZATION PROJECT
SEC. 701. BROWNSVILLE PUBLIC UTILITY BOARD WATER RECYCLING AND
DESALINIZATION PROJECT.
(a) In General.--The Reclamation Wastewater and Groundwater Study
and Facilities Act (Public Law 102-575, title XVI; 43 U.S.C. 390h et
seq.) is amended by adding at the end the following new section:
``SEC. 163__. BROWNSVILLE PUBLIC UTILITY BOARD WATER RECYCLING AND
DESALINIZATION PROJECT.
``(a) In General.--The Secretary, in cooperation with the
Brownsville Public Utility Board, may participate in the design,
planning, and construction of facilities to reclaim, reuse, and treat
impaired waters in the Brownsville, Texas, area.
``(b) Cost Sharing.--The Federal share of the cost of the project
described in subsection (a) shall not exceed 25 percent of the total
cost of the project.
``(c) Limitation.--Funds provided by the Secretary shall not be
used for operation and maintenance of the project described in
subsection (a).
``(d) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.''.
(b) Conforming Amendment.--The table of sections in section 2 of
Public Law 102-575 is amended by inserting after the last item relating
to title XVI the following:
``163_. Brownsville Public Utility Board water recycling and
desalinization project.''.
TITLE VIII--EL PASO, TEXAS, WATER RECLAMATION, REUSE, AND
DESALINIZATION PROJECT
SEC. 801. EL PASO, TEXAS, WATER RECLAMATION, REUSE, AND DESALINIZATION
PROJECT.
(a) Authorization.--The Reclamation Wastewater and Groundwater
Study and Facilities Act (Public Law 102-575, title XVI; 43 U.S.C. 390h
et seq.) is amended by adding at the end the following new section:
``SEC. 16XX. EL PASO, TEXAS, WATER RECLAMATION, REUSE, AND
DESALINIZATION PROJECT.
``(a) Authorization.--The Secretary, in cooperation with the State
and local authorities, is authorized to participate in the design,
planning, and construction of the El Paso Water Reclamation, Reuse, and
Desalinization project to reclaim and reuse wastewater and to treat and
reuse impaired and brackish groundwater in the service area of the El
Paso Water Utilities Public Service Board, El Paso, Texas.
``(b) Cost Share.--The Federal share of the cost of the project
authorized by this section shall not exceed 25 percent of the total
cost of the project.
``(c) Limitation.--The Secretary shall not provide funds for the
operation and maintenance of the project authorized by this section.
``(d) Sunset.--The authority of the Secretary to carry out any
provisions of this section shall terminate 10 years after the date of
the enactment of this section.''.
(b) Clerical Amendment.--The table of sections in section 2 of such
Act is amended by inserting after the item relating to section 16xx the
following:
``Sec. 16xx. El Paso, Texas, water reclamation, reuse, and
desalinization project.''.
Passed the House of Representatives May 16, 2005.
Attest:
JEFF TRANDAHL,
Clerk.