One Hundred Tenth Congress of the United States of America
At the Second Session
Begun and held at the City of Washington on Thursday, the third day of January, two thousand and eight
H. R. 3986
AN ACT
To amend the John F. Kennedy Center Act to authorize appropriations for the John F. Kennedy Center for the Performing Arts, and for other purposes.
Short title
This Act may be cited as the John F. Kennedy Center Reauthorization Act of 2008
.
Technical amendment
Section 2(a)(2)(J)(ii) of the John F. Kennedy Center Act (20 U.S.C. 76h(a)(2)(J)(ii)) is amended by striking Public Works and Transportation
and inserting Transportation and Infrastructure
.
Photovoltaic system
The John F. Kennedy Center Act is amended by inserting after section 6 (20 U.S.C. 76l) the following:
Photovoltaic system
In general
The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
Report
Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
.
Authorization of appropriations
Section 13 of the John F. Kennedy Center Act (20 U.S.C. 76r) is amended—
by striking subsections (a) and (b) and inserting the following:
Maintenance, repair, and security
There are authorized to be appropriated to the Board to carry out section 4(a)(1)(H)—
$20,200,000 for fiscal year 2008;
$21,800,000 for fiscal year 2009;
$22,500,000 for fiscal year 2010;
$23,500,000 for fiscal year 2011; and
$24,500,000 for fiscal year 2012.
Capital projects
There are authorized to be appropriated to the Board to carry out subparagraphs (F) and (G) of section 4(a)(1)—
$23,150,000 for fiscal year 2008;
$16,000,000 for fiscal year 2009;
$17,000,000 for fiscal year 2010;
$17,000,000 for fiscal year 2011; and
$18,500,000 for fiscal year 2012.
;
by redesignating subsection (d) as subsection (e); and
by inserting after subsection (c) the following:
Photovoltaic system
There are authorized to be appropriated to the Board such sums as are necessary to carry out section 7, to remain available until expended.
.
Existing authorities
Nothing in this Act limits or otherwise affects the authority or responsibility of the National Capital Planning Commission or the Commission of Fine Arts.
Speaker of the House of Representatives.
Vice President of the United States and President of the Senate.