H.R. 4700

To suspend temporarily the duty on certain structures, parts, and components for use in an isotopic separation facility in southern Ohio.

Latest

I

110th CONGRESS

1st Session

H. R. 4700

IN THE HOUSE OF REPRESENTATIVES

December 13, 2007

Mr. Tiberi introduced the following bill; which was referred to the Committee on Ways and Means

A BILL

To suspend temporarily the duty on certain structures, parts, and components for use in an isotopic separation facility in southern Ohio.

1.

Certain structures, parts, and components for use in an isotopic separation facility in southern Ohio

(a)

In general

Subchapter II of chapter 99 of the Harmonized Tariff Schedule of the United States is amended by inserting in numerical sequence the following new heading:

9902._._Certain parts, and components for use in an isotopic separation facility (isotopic separation equipment) consisting of sampling autoclaves, vacuum pumps, and mass spectrometers for the construction of an isotopic separation facility in southern Ohio known as the American Centrifuge Plant (provided for in subheading 8401.20.00)FreeNo changeNo changeOn or before 12/31/2011

.

(b)

Effective date

The amendment made by subsection (a) applies to articles entered, or withdrawn from warehouse for consumption, on or after the 15th day after the date of the enactment of this Act.