S. 2384Senate110th Congress (2007-2009)In Committee

Fountain Creek Watershed Feasibility Study Act of 2007

Introduced November 16, 2007

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Environment and Public Works.

November 16, 2007

View full timeline
SenateIntro Referral

Introduced in Senate

November 16, 2007

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S14627-14628)

November 16, 2007

SenateIntro Referral

Read twice and referred to the Committee on Environment and Public Works.

November 16, 2007

Floor Debate

8 members

What members said about S. 2384 on the floor

3 Republicans5 Democrats
Dianne Feinstein
Sen. Dianne FeinsteinD-CA · Nov 16, 2007

Mr. President. I rise today to introduce a series of bills, S. 2386, S. 2387, S. 2388, and S. 2390, designed to better prepare for catastrophic wildfires like the ones that recently devastated…

Orrin G. Hatch
Sen. Orrin G. HatchR-UT · Nov 16, 2007

Mr. President, today I join with Senators Rockefeller, Lott, and Kennedy to introduce the Medicare Quality Improvement Modernization Act of 2007, S. 2396. As background for my colleagues, Medicare's…

Ken Salazar
Sen. Ken SalazarD-CO · Nov 16, 2007

Mr. President, today I am introducing the Fountain Creek Feasibility Study Act of 2007. This bill is an important piece of a larger vision to transform and restore the Fountain Creek watershed, which…

Hillary Rodham Clinton
Sen. Hillary Rodham ClintonD-NY · Nov 16, 2007

Mr. President, I am here today to introduce legislation in honor of National Adoption Day that will address the needs of children waiting to be adopted from our Nation's foster care system. These are…

Mark Udall
Rep. Mark UdallD-CO-2 · Dec 19, 2007

Madam Speaker, today with my Colorado colleague, Representative John Salazar, I am introducing a bill to authorize a feasibility study regarding a multipurpose project in the Fountain Creek watershed…

Show 3 more
Norm Coleman
Sen. Norm ColemanR-MN · Nov 16, 2007

Mr. President, I rise today to introduce the Good Government Contractor Act of 2007. This legislation represents my continuing efforts targeting federal contractors with tax debt. For several years,…

Pat Roberts
Sen. Pat RobertsR-KS · Nov 16, 2007

Mr. President, I rise today to offer legislation to protect the residents of Treece, Kansas from the potential danger of remaining in an area that is undergoing a Superfund cleanup. I commend my…

Patrick J. Leahy
Sen. Patrick J. LeahyD-VT · Nov 16, 2007

Mr. President, I ask unanimous consent that the text of the joint resolution be printed in the Record.

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued November 16, 2007

II

110th CONGRESS

1st Session

S. 2384

IN THE SENATE OF THE UNITED STATES

November 16, 2007

Mr. Salazar introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works

A BILL

To authorize the Chief of Engineers to conduct a feasibility study relating to the construction of a multipurpose project in the Fountain Creek watershed located in the State of Colorado.

1.

Short title

This Act may be cited as the Fountain Creek Watershed Feasibility Study Act of 2007.

2.

Definitions

In this Act:

(1)

State

The term State means the State of Colorado.

(2)

Watershed

The term watershed means the Fountain Creek watershed that is located in the State.

3.

Feasibility study relating to the watershed

(a)

Study

(1)

In general

Not later than 2 years after the date of enactment of this Act, the Chief of Engineers shall complete a study to determine the feasibility of constructing a multipurpose project that shall—

(A)

be located in the watershed;

(B)

consist of—

(i)

1 or more dams or other structures, other facilities, or management activities; or

(ii)

1 or more other reservoirs that are to be located on-channel or off-channel of the watershed; and

(C)

with respect to the area that is located in the watershed and the Arkansas River Valley of the State, and any residential or commercial activity in the watershed and the Arkansas River Valley of the State, be designed—

(i)

to provide more reliable flood control;

(ii)

to provide better sediment control;

(iii)

to increase the supply of water through the reuse of water or other means;

(iv)

to improve the quality of water; and

(v)

to conserve fish and wildlife that are, and preserve the ecosystem that is, located in close proximity to the location of the project.

(2)

Consideration of prior reports

In conducting the study under paragraph (1), the Chief of Engineers shall take into consideration—

(A)

the report entitled Supplemental Report on Fountain Reservoir and Reevaluation of Report on Review Survey for Flood Control and Allied Purposes, Arkansas River and Tributaries Above John Martin Dam, Colorado, prepared by the Corps of Engineers, and dated May 15, 1970; and

(B)

the study entitled, The Fountain Creek Watershed Study, prepared by the Corps of the Engineers.

(3)

Effect on other studies

In conducting the study under paragraph (1), the Chief of Engineers shall conduct the study independently from, and shall not affect any other study relating to—

(A)

the Fountain Creek watershed;

(B)

the Fryingpan-Arkansas Project of the State; or

(C)

the proposed Southern Delivery System Project.

(b)

Report

Not later than 60 days after the date on which the Chief of Engineers completes the feasibility study under subsection (a), the Chief of Engineers shall submit to the President, the President pro tempore of the Senate, and the Speaker of the House of Representatives, a report that describes the results of the study.