II
110th CONGRESS
2d Session
S. 2680
IN THE SENATE OF THE UNITED STATES
February 28, 2008
Mr. Salazar introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To amend the Reclamation Projects Authorization and Adjustment Act of 1992 to require the Secretary of the Interior to take certain actions to address environmental problems associated with the Leadville Mine Drainage Tunnel in the State of Colorado, and for other purposes.
Short title
This Act may be cited as
the Leadville Mine Drainage Tunnel
Environmental Improvement Act of 2008
.
Leadville Mine Drainage Tunnel
Section 705 of the Reclamation Projects Authorization and Adjustment Act of 1992 (Public Law 102–575; 106 Stat. 4656) is amended to read as follows:
Leadville Mine Drainage Tunnel
The Secretary shall operate and maintain the Leadville Mine Drainage Tunnel in a manner that protects human health and environment.
.
Water quality investigations
Section 708 of the Reclamation Projects Authorization and Adjustment Act of 1992 (Public Law 102–575; 106 Stat. 4657) is amended—
by striking sections (a) through (d) and inserting the following:
Definition of study area
In this section, the term study area includes—
the Leadville Mine Drainage Tunnel;
groundwater and surface water, including tributaries, affected by any blockage of that Tunnel; and
the upper Arkansas River watershed, from the headwaters of the east fork of that River to the confluence with Two-Bit Gulch.
Study and report
The Secretary, in cooperation with the State of Colorado, the Administrator of the Environmental Protection Agency, and other Federal agencies, shall—
investigate the study area; and
not later than 1 year after the date of enactment of the Leadville Mine Drainage Tunnel Environmental Improvement Act of 2008, and annually thereafter until the study required by this section is complete, submit to the State, the Administrator, and Congress a report that describes whether, and how, any blockages in the Leadville Mine Drainage Tunnel have affected, or are affecting, water quality and aquatic life in the study area.
;
in subsection
(e), by striking (e) Nothing
and inserting the following:
CERCLA
Nothing
; and
by striking subsection (f) and inserting the following:
Authorization of appropriations
There are authorized to be appropriated—
to carry out section 707, such sums as are necessary; and
to carry out this section—
$500,000 for use in planning and carrying out investigations; and
such additional sums as are necessary.
.
Environmental remediation
Title VII of the Reclamation Projects Authorization and Adjustment Act of 1992 (Public Law 102–575; 106 Stat. 4655) is amended by adding at the end the following:
Environmental remediation
Mine pool
The Secretary, in conjunction with the Administrator of the Environmental Protection Agency and the State of Colorado, shall—
immediately take such actions as are necessary to reduce the water level in the mine pool associated with the Leadville Mine Drainage Tunnel, in a manner consistent with subsection (b), to prevent the risk of a catastrophic rupture and flood; and
thereafter, take such actions as are necessary—
to maintain the water level in the mine pool at a safe level; and
prevent further mine pool migration.
California Gulch Superfund Site Operable Unit 6
In general
As soon as practicable after the date of enactment of this section, the Secretary, in conjunction with the Administrator of the Environmental Protection Agency and the State of Colorado, shall implement those portions of the remedy selected by the Administrator of the Environmental Protection Agency, dated September 2003, and any modifications or amendments to the remedy, including explanations of significant differences, for the California Gulch Superfund Site that pertain to managing the Leadville Mine Drainage Tunnel and related mine pool.
Authorization of appropriations
There is authorized to be appropriated to carry out this subsection $40,000,000.
.
Technical amendments
The table of contents for the Reclamation Projects Authorization and Adjustment Act of 1992 (Public Law 102–575; 106 Stat. 4600) is amended—
by striking the item relating to section 705 and inserting the following:
Sec. 705. Leadville Mine Drainage Tunnel.
;
by adding at the end of the items relating to title VII the following:
Sec. 709. Environmental remediation.
.