II
Calendar No. 611
111th CONGRESS
2d Session
H. R. 2442
[Report No. 111–325]
IN THE SENATE OF THE UNITED STATES
October 19, 2009
Received; read twice and referred to the Committee on Energy and Natural Resources
September 27, 2010
Reported by Mr. Bingaman, with an amendment
Omit the part struck through and insert the part printed in italic
AN ACT
To amend the Reclamation Wastewater and Groundwater Study and Facilities Act to expand the Bay Area Regional Water Recycling Program, and for other purposes.
Short title
This Act may be cited as the
Bay Area Regional Water Recycling
Program Expansion Act of 2009
.
Project authorizations
In general
The Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h et seq.) (as amended by section 512(a) of the Consolidated Natural Resources Act of 2008) is amended by adding at the end the following:
CCCSD-concord recycled water project
Authorization
The Secretary, in cooperation with the Central Contra Costa Sanitary District, California, is authorized to participate in the design, planning, and construction of recycled water distribution systems.
Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
Limitation
The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
Authorization of appropriations
There is authorized to be appropriated to carry out this section $1,800,000.
Central Dublin recycled water distribution and retrofit project
Authorization
The Secretary, in cooperation with the Dublin San Ramon Services District, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
Limitation
The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
Authorization of appropriations
There is authorized to be appropriated to carry out this section $1,150,000.
Petaluma recycled water project, phases 2A, 2B, and 3
Authorization
The Secretary, in cooperation with the City of Petaluma, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
Limitation
The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
Authorization of appropriations
There is authorized to be appropriated to carry out this section $6,000,000.
Central Redwood City recycled water project
Authorization
The Secretary, in cooperation with the City of Redwood City, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
Limitation
The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
Authorization of appropriations
There is authorized to be appropriated to carry out this section $8,000,000.
Palo Alto recycled water pipeline project
Authorization
The Secretary, in cooperation with the City of Palo Alto, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
Limitation
The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
Authorization of appropriations
There is authorized to be appropriated to carry out this section $8,250,000.
Ironhouse Sanitary District (ISD) antioch recycled water project
Authorization
The Secretary, in cooperation with the Ironhouse Sanitary District (ISD), California, is authorized to participate in the design, planning, and construction of recycled water distribution systems.
Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
Limitation
The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
Authorization of appropriations
There is authorized to be appropriated to carry out this section $7,000,000.
.
Project implementation
In carrying
out sections 1642 through 1648 of the Reclamation Wastewater and Groundwater
Study and Facilities Act, and the sections added to such Act by subsection (a),
the Secretary shall enter into individual agreements with the San Francisco Bay
Area Regional Water Recycling implementing agencies to fund the projects
through the Bay Area Clean Water Agencies (BACWA) or its successor, and
shall may
include in such agreements a provision for the reimbursement of construction
costs, including those construction costs incurred prior to the enactment of
this Act, subject to appropriations made available for the Federal share of the
project under sections 1642 through 1648 of the Reclamation Wastewater and
Groundwater Study and Facilities Act and the sections added to such Act by
subsection (a).
Clerical amendments
The table of contents of the Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. prec. 371) (as amended by section 512(a) of the Consolidated Natural Resources Act of 2008) is amended by adding at the end the following:
Sec. 16__. CCCSD-Concord recycled water project.
Sec. 16__. Central Dublin recycled water distribution and retrofit project.
Sec. 16__. Petaluma recycled water project, phases 2a, 2b, and 3.
Sec. 16__. Central Redwood City recycled water project.
Sec. 16__. Palo Alto recycled water pipeline project.
Sec. 16__. Ironhouse Sanitary District (ISD) Antioch recycled water project.
.
Modification to authorized projects
Antioch recycled water project
Section 1644(d)
of the Reclamation Wastewater and Groundwater Study and Facilities Act
(43 U.S.C.
390h–27) (as amended by section 512(a) of the Consolidated
Natural Resources Act of 2008) is amended by striking $2,250,000
and inserting $3,125,000
.
South Bay advanced recycled water treatment facility
Section 1648(d) of the Reclamation
Wastewater and Groundwater Study and Facilities Act (43 U.S.C.
390h–31) (as amended by section 512(a) of the Consolidated
Natural Resources Act of 2008) is amended by striking $8,250,000
and inserting $13,250,000
.
September 27, 2010
Reported with an amendment