S. 2812Senate111th Congress (2009-2011)In Committee

Nuclear Power 2021 Act

Introduced November 20, 2009

Legislative Activity

Stay on top of the latest movement without scrolling through every action

6 earlier actions
SenateCalendars Latest Action

Placed on Senate Legislative Calendar under General Orders. Calendar No. 600.

September 27, 2010

View full timeline
SenateIntro Referral

Introduced in Senate

November 20, 2009

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S11884-11885)

November 20, 2009

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S11885)

November 20, 2009

SenateCommittee

Committee on Energy and Natural Resources. Hearings held. Hearings printed: S.Hrg. 111-375.

December 15, 2009

SenateCommittee

Committee on Energy and Natural Resources. Ordered to be reported with an amendment favorably.

July 21, 2010

SenateCommittee

Committee on Energy and Natural Resources. Reported by Senator Bingaman with amendments. With written report No. 111-314.

September 27, 2010

SenateCalendars

Placed on Senate Legislative Calendar under General Orders. Calendar No. 600.

September 27, 2010

Floor Debate

3 members

What members said about S. 2812 on the floor

2 Republicans1 Democrat
Susan M. Collins
Sen. Susan M. CollinsR-ME · Nov 20, 2009

Mr. President, I rise today on behalf of myself and Senator Conrad to introduce legislation to ensure that our seniors and disabled citizens have timely access to home health services under the…

Jeff Bingaman
Sen. Jeff BingamanD-NM · Nov 20, 2009

Mr. President, I rise today to introduce the Nuclear Power 2021 Act, which is cosponsored by Senator Murkowski and Senator Udall from Colorado. This bill, along with Senator Udall's bill S. 2052 are…

Jeff Bingaman
Sen. Jeff BingamanD-NM · Nov 20, 2009

Mr. President, I rise today to introduce the Nuclear Power 2021 Act, which is cosponsored by Senator Murkowski and Senator Udall from Colorado. This bill, along with Senator Udall's bill S. 2052 are…

Jeff Bingaman
Sen. Jeff BingamanD-NM · Nov 20, 2009

Mr. President, I would like to announce for the information of the Senate and the public that a hearing has been scheduled before the Subcommittee on National Parks. The hearing will be held on…

Chuck Grassley
Sen. Chuck GrassleyR-IA · Nov 20, 2009

Mr. President, today I have introduced a bill to extend deadlines by one year for three provisions in the Heartland Disaster Tax Relief Act of 2008. The Heartland Disaster Tax Relief Act has been…

Bill Text

2 versions available

Reading Mode
Latest
Reported to SenateIssued September 27, 2010

II

Calendar No. 600

111th CONGRESS

2d Session

S. 2812

[Report No. 111–314]

IN THE SENATE OF THE UNITED STATES

November 20, 2009

Mr. Bingaman (for himself, Ms. Murkowski, Mr. Udall of Colorado, Mr. Pryor, Ms. Landrieu, Mr. Risch, and Mr. Crapo) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

September 27, 2010

Reported by Mr. Bingaman, with amendments

Omit the part struck through and insert the part printed in italic

A BILL

To amend the Energy Policy Act of 2005 to require the Secretary of Energy to carry out programs to develop and demonstrate 2 small modular nuclear reactor designs, and for other purposes.

1.

Short title

This Act may be cited as the Nuclear Power 2021 Act.

2.

Nuclear power 2021 initiative

Section 952 of the Energy Policy Act of 2005 (42 U.S.C. 16272) is amended by adding at the end the following:

(f)

Nuclear power 2021 initiative

(1)

Definitions

In this subsection:

(A)

Combined license

The term combined license has the meaning given the term in section 52.1 of title 10, Code of Federal Regulations (or a successor regulation).

(B)

Design certification

The term design certification has the meaning given the term in section 52.1 of title 10, Code of Federal Regulations (or a successor regulation).

(C)

Early site permit

The term early site permit has the meaning given the term in section 52.1 of title 10, Code of Federal Regulations (or a successor regulation).

(C)

(D) Small modular reactor

The term small modular reactor means a nuclear reactor—

(i)

with a rated capacity of less than 300 electrical megawatts; and

(ii)

that can be constructed and operated in combination with similar reactors at a single site.

(2)

Duty of Secretary

The Secretary shall carry out, through cooperative agreements with private sector partners—

(A)

a program—

(i)

to develop a standard design for each of 2 small modular reactors, at least 1 of which has a rated capacity of not more than 50 electrical megawatts; and

(ii)

to obtain a design certification from the Nuclear Regulatory Commission for each of the 2 standard designs by January 1, 2018; and

(B)

a program to demonstrate the licensing of small modular reactors by—

(i)

developing applications for a combined license for each of the designs certified pursuant to subparagraph (A); and

(ii)

obtaining a combined license from the Nuclear Regulatory Commission for each of the designs by January 1, 2021.2021; and

(C)

a program to obtain an early site permit for 2 sites for 1 or more small modular reactors.

(3)

Merit review of proposals

The Secretary shall select proposals for cooperative agreements under this subsection—

(A)

on the basis of an impartial review of the scientific and technical merit of the proposals; and

(B)

through the use of competitive procedures.

(4)

Technical considerations

In evaluating proposals, the Secretary shall take into account the efficiency, cost, safety, and proliferation resistance of competing reactor designs.

(5)

Cost-share requirements

(A)

Design development

Notwithstanding section 988, the Secretary shall require that not less than 50 percent of the cost of the development of each small modular reactor design under paragraph (2)(A)(2)(A), and each early site permit under paragraph (2)(C), be provided by a non-Federal source.

(B)

Licensing demonstration

Notwithstanding section 988, the Secretary shall require that not less than 75 percent of the cost of the licensing demonstration of each small modular reactor design under paragraph (2)(B) be provided by a non-Federal source.

(C)

Calculation of amount

Non-Federal contributions under this subsection shall be calculated in accordance with section 988(d).

.

September 27, 2010

Reported with amendments