S. 1751Senate112th Congress (2011-2013)In Committee

Coal Residuals Reuse and Management Act

Introduced October 20, 2011

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Environment and Public Works.

October 20, 2011

View full timeline
SenateIntro Referral

Introduced in Senate

October 20, 2011

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S6876-6877)

October 20, 2011

SenateIntro Referral

Read twice and referred to the Committee on Environment and Public Works.

October 20, 2011

Floor Debate

21 members

What members said about S. 1751 on the floor

12 Republicans9 Democrats
Patrick J. Leahy
Sen. Patrick J. LeahyD-VT · Oct 20, 2011

Mr. President, I rise in my capacity as chair of the Judiciary Committee to say I oppose amendment No. 860. It is a one- size-fits-all approach. It would have catastrophic consequences to the Justice…

Chuck Grassley
Sen. Chuck GrassleyR-IA · Oct 20, 2011

Mr. President, I ask the Chair to please inform me when I have spoken 10 minutes. For other people who want to speak, I don't think I will speak that long. My amendment No. 860 is a good government…

John Hoeven
Sen. John HoevenR-ND · Oct 20, 2011

Mr. President, I rise to speak on the issue of job creation as well, specifically in regard to legislation I will be introducing that seeks to not only create jobs but also to truly reduce the cost…

John Hoeven
Sen. John HoevenR-ND · Oct 20, 2011

Mr. President, I rise to speak on the issue of job creation as well, specifically in regard to legislation I will be introducing that seeks to not only create jobs but also to truly reduce the cost…

Carl Levin
Sen. Carl LevinD-MI · Oct 20, 2011

Mr. President, I am going to speak now against the pending amendment of Senator Ayotte, which would prohibit the prosecution of terrorists in Federal courts. We need all available tools against…

Show 8 more
Scott P. Brown
Sen. Scott P. Brown R-MA · Oct 20, 2011

Madam President, I rise to speak today as in morning business for about 5 minutes. Madam President, I rise to speak in strong support of a bill we will be voting on, I hope, later today, S. 1726, the…

Mark Kirk
Sen. Mark KirkR-IL · Oct 20, 2011

Mr. President, I ask unanimous consent that the order for the quorum call be rescinded. I ask unanimous consent to speak as in morning business for 3 minutes. Mr. President, we all saw the news, yet…

Dianne Feinstein
Sen. Dianne FeinsteinD-CA · Oct 20, 2011

Mr. President, today I wish to introduce the America's Cup Act of 2011. This legislation will enable foreign ships to compete for the 34th America's Cup, scheduled to begin in November. I am happy to…

Sherrod Brown
Sen. Sherrod BrownD-OH · Oct 20, 2011

Mr. President. I rise to speak on amendment No. 874, my amendment on housing discrimination. My understanding is, when we assemble for a series of votes at 2 o'clock, this vote will be voice voted,…

Olympia J. Snowe
Sen. Olympia J. SnoweR-ME · Oct 20, 2011

Mr. President, today I wish to support Senator Vitter's amendment regarding drug importation from Canada. Senator Vitter has been a tremendous partner and tireless advocate in supporting the…

Roy Blunt
Sen. Roy BluntR-MO · Oct 20, 2011

Madam President, I note the absence of a quorum. Madam President, I ask unanimous consent that the order for the quorum call be rescinded. Madam President, yesterday, around 5:30 or so, we had all…

Al  Franken
Sen. Al Franken D-MN · Oct 20, 2011

Mr. President, today I am introducing the Community Wind Act with my friend and colleague Senator Tester from Montana. Rural renewable energy development has been one of my top priorities since…

Jeff Merkley
Sen. Jeff MerkleyD-OR · Oct 20, 2011

Mr. President, when our American government spends money on infrastructure, core infrastructure, we should look first to American companies and American workers. But this doesn't always happen. In…

Show 11 more
Patrick J. Leahy
Sen. Patrick J. LeahyD-VT · Oct 20, 2011

Mr. President, I am pleased to be joined by Senators Collins, Schumer, Sanders and Gillibrand as we introduce this legislation to hold accountable those criminals who fraudulently sell what they call…

Barbara A. Mikulski
Sen. Barbara A. MikulskiD-MD · Oct 20, 2011

Mr. President, I oppose this amendment. First, it is a budget buster. To enforce this will take enormous amounts of resources. You cannot be sure that that drug coming from Canada is not a…

Orrin G. Hatch
Sen. Orrin G. HatchR-UT · Oct 20, 2011

Mr. President, on behalf of myself and 32 cosponsors--both Republicans and Democrats--I ask unanimous consent that the current matter be set aside and amendment No. 875 be called up and made pending.…

Mark Kirk
Sen. Mark KirkR-IL · Oct 20, 2011

Mr. President, I rise today to introduce the bi-partisan International Travelers Bill of Rights of 2011 with my colleagues Senators Scott Brown, Ben Cardin, and John Kerry. It is critical that…

Jim Webb
Sen. Jim WebbD-VA · Oct 20, 2011

Mr. President, this bill is the result of 4\1/2\ years of work and outreach and listening to the other side, incorporating recommendations from across the political spectrum. It is paid for. It is…

Tom Coburn
Sen. Tom CoburnR-OK · Oct 20, 2011

Mr. President, I have talked with Senator Webb. Some of what he wants to do is probably fine, but we are absolutely ignoring the U.S. Constitution if we do this. We have no role, unless we are…

David Vitter
Sen. David VitterR-LA · Oct 20, 2011

Mr. President, this amendment is bipartisan. I thank the bipartisan coauthors. The amendment would allow the reimportation of small, personal use quantities of safe FDA-approved prescription drugs…

Herb Kohl
Sen. Herb KohlD-WI · Oct 20, 2011

Mr. President, I object. Mr. President, I object. We have a good number of amendments already pending, and we have a list of amendments already in order to be made pending. Until we are able to…

Kay Bailey Hutchison
Sen. Kay Bailey HutchisonR-TX · Oct 20, 2011

Is there time remaining on our side? Mr. President, this is the most massive encroachment on States rights I have seen in this body. It is $5 million on a priority we should not have. I will work…

Jerry Moran
Sen. Jerry MoranR-KS · Oct 20, 2011

Mr. President, the pending business before the Senate is an amendment I offered yesterday, Moran No. 815. There has been agreement that it will be accepted on voice vote, and I appreciate the…

Jon Kyl
Sen. Jon KylR-AZ · Oct 20, 2011

Mr. President, would it be in order for me to speak as in morning business for up to 5 minutes at this point?

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued October 20, 2011

II

112th CONGRESS

1st Session

S. 1751

IN THE SENATE OF THE UNITED STATES

October 20, 2011

Mr. Hoeven (for himself, Mr. Conrad, Mr. Enzi, Ms. Landrieu, Mr. Boozman, Mr. Nelson of Nebraska, Mr. Portman, Mr. Manchin, Mr. Thune, and Mr. Rockefeller) introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works

A BILL

To amend subtitle D of the Solid Waste Disposal Act to facilitate recovery and beneficial use, and provide for the proper management and disposal, of materials generated by the combustion of coal and other fossil fuels.

1.

Short title

This Act may be cited as the Coal Residuals Reuse and Management Act.

2.

Amendment to Subtitle D of the Solid Waste Disposal Act

(a)

In general

Subtitle D of the Solid Waste Disposal Act (42 U.S.C. 6941 et seq.) is amended by adding at the end the following new section:

4011.

Management and disposal of coal combustion residuals

(a)

State permit programs for coal combustion residuals

Each State may adopt and implement a coal combustion residuals permit program.

(b)

State actions

(1)

Notification

Not later than 6 months after the date of enactment of this section (except as provided by the deadline identified under subsection (d)(2)(B)), the Governor of each State shall notify the Administrator, in writing, whether such State will adopt and implement a coal combustion residuals permit program.

(2)

Certification

(A)

In general

Not later than 36 months after the date of enactment of this section (except as provided in subsections (f)(1)(A) and (f)(1)(C)), in the case of a State that has notified the Administrator that it will implement a coal combustion residuals permit program, the head of the lead State agency responsible for implementing the coal combustion residuals permit program shall submit to the Administrator a certification that such coal combustion residuals permit program meets the specifications described in subsection (c)(1).

(B)

Contents

A certification submitted under this paragraph shall include—

(i)

a letter identifying the lead State agency responsible for implementing the coal combustion residuals permit program, signed by the head of such agency;

(ii)

identification of any other State agencies involved with the implementation of the coal combustion residuals permit program;

(iii)

a narrative description that provides an explanation of how the State will ensure that the coal combustion residuals permit program meets the requirements of this section, including a description of the State's—

(I)

process to inspect or otherwise determine compliance with such permit program;

(II)

process to enforce the requirements of such permit program; and

(III)

public participation process for the promulgation, amendment, or repeal of regulations for, and the issuance of permits under, such permit program;

(iv)

a legal certification that the State has, at the time of certification, fully effective statutes and regulations necessary to implement a coal combustion residuals permit program that meets the specifications described in subsection (c)(1); and

(v)

copies of State statutes and regulations described in clause (iv).

(3)

Maintenance of 4005(c) or 3006 program

In order to adopt or implement a coal combustion residuals permit program under this section (including pursuant to subsection (f)), the State agency responsible for implementing a coal combustion residuals permit program in a State shall maintain an approved program under section 4005(c) or an authorized program under section 3006.

(c)

Permit program specifications

(1)

Minimum requirements

The specifications described in this subsection for a coal combustion residuals permit program are as follows:

(A)

The revised criteria described in paragraph (2) shall apply to a coal combustion residuals permit program, except as provided in paragraph (3).

(B)

Each structure shall be, in accordance with generally accepted engineering standards for the structural integrity of such structures, designed, constructed, and maintained to provide for containment of the maximum volumes of coal combustion residuals appropriate for the structure. If a structure is determined by the head of the agency responsible for implementing the coal combustion residuals permit program to be deficient, the head of such agency has authority to require action to correct the deficiency according to a schedule determined by such agency. If the identified deficiency is not corrected according to such schedule, the head of such agency has authority to require that the structure close in accordance with subsection (h).

(C)

The coal combustion residuals permit program shall apply the revised criteria promulgated pursuant to section 4010(c) for location, design, groundwater monitoring, corrective action, financial assurance, closure, and post-closure described in paragraph (2) and the specifications described in this paragraph to surface impoundments.

(D)

If a structure that is classified as posing a high hazard potential pursuant to the guidelines published by the Federal Emergency Management Agency entitled Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA Publication Number 333) is determined by the head of the agency responsible for implementing the coal combustion residuals permit program to be deficient with respect to the structural integrity requirement in subparagraph (B), the head of such agency has authority to require action to correct the deficiency according to a schedule determined by such agency. If the identified deficiency is not corrected according to such schedule, the head of such agency has authority to require that the structure close in accordance with subsection (h).

(E)

New structures that first receive coal combustion residuals after the date of enactment of this section shall be constructed with a base located a minimum of two feet above the upper limit of the natural water table.

(F)

In the case of a coal combustion residuals permit program implemented by a State, the State has the authority to inspect structures and implement and enforce such permit program.

(G)

In the case of a coal combustion residuals permit program implemented by a State, the State has the authority to address wind dispersal of dust from coal combustion residuals by requiring dust control measures, as determined appropriate by the head of the lead State agency responsible for implementing the coal combustion residuals permit program.

(2)

Revised criteria

The revised criteria described in this paragraph are—

(A)

the revised criteria for design, groundwater monitoring, corrective action, closure, and post-closure, for structures, including—

(i)

for new structures, and lateral expansions of existing structures, that first receive coal combustion residuals after the date of enactment of this section, the revised criteria regarding design requirements described in section 258.40 of title 40, Code of Federal Regulations; and

(ii)

for all structures that receive coal combustion residuals after the date of enactment of this section, the revised criteria regarding groundwater monitoring and corrective action requirements described in subpart E of part 258 of title 40, Code of Federal Regulations, except that, for the purposes of this paragraph, such revised criteria shall also include—

(I)

for the purposes of detection monitoring, the constituents boron, chloride, conductivity, fluoride, mercury, pH, sulfate, sulfide, and total dissolved solids; and

(II)

for the purposes of assessment monitoring, the constituents aluminum, boron, chloride, fluoride, iron, manganese, molybdenum, pH, sulfate, and total dissolved solids;

(B)

the revised criteria for location restrictions described in—

(i)

for new structures, and lateral expansions of existing structures, that first receive coal combustion residuals after the date of enactment of this section, sections 258.11 through 258.15 of title 40, Code of Federal Regulations; and

(ii)

for existing structures that receive coal combustion residuals after the date of enactment of this section, sections 258.11 and 258.15 of title 40, Code of Federal Regulations;

(C)

for all structures that receive coal combustion residuals after the date of enactment of this section, the revised criteria for air quality described in section 258.24 of title 40, Code of Federal Regulations;

(D)

for all structures that receive coal combustion residuals after the date of enactment of this section, the revised criteria for financial assurance described in subpart G of part 258 of title 40, Code of Federal Regulations;

(E)

for all structures that receive coal combustion residuals after the date of enactment of this section, the revised criteria for surface water described in section 258.27 of title 40, Code of Federal Regulations;

(F)

for all structures that receive coal combustion residuals after the date of enactment of this section, the revised criteria for recordkeeping described in section 258.29 of title 40, Code of Federal Regulations;

(G)

for landfills and other land-based units, other than surface impoundments, that receive coal combustion residuals after the date of enactment of this section, the revised criteria for run-on and run-off control systems described in section 258.26 of title 40, Code of Federal Regulations; and

(H)

for surface impoundments that receive coal combustion residuals after the date of enactment of this section, the revised criteria for run-off control systems described in section 258.26(a)(2) of title 40, Code of Federal Regulations.

(3)

Applicability of certain requirements

A State may determine that one or more of the requirements of the revised criteria described in paragraph (2) is not needed for the management of coal combustion residuals in that State, and may decline to apply such requirement as part of its coal combustion residuals permit program. If a State declines to apply a requirement under this paragraph, the State shall include in the certification under subsection (b)(2) a description of such requirement and the reasons such requirement is not needed in the State. If the Administrator determines that a State determination under this paragraph does not accurately reflect the needs for the management of coal combustion residuals in the State, the Administrator may treat such State determination as a deficiency under subsection (d).

(d)

Written notice and opportunity To remedy

(1)

In general

The Administrator shall provide to a State written notice and an opportunity to remedy deficiencies in accordance with paragraph (2) if at any time the State—

(A)

does not satisfy the notification requirement under subsection (b)(1);

(B)

has not submitted a certification under subsection (b)(2);

(C)

does not satisfy the maintenance requirement under subsection (b)(3); or

(D)

is not implementing a coal combustion residuals permit program that meets the specifications described in subsection (c)(1).

(2)

Contents of notice; deadline for response

A notice provided under this subsection shall—

(A)

include findings of the Administrator detailing any applicable deficiencies in—

(i)

compliance by the State with the notification requirement under subsection (b)(1);

(ii)

compliance by the State with the certification requirement under subsection (b)(2);

(iii)

compliance by the State with the maintenance requirement under subsection (b)(3); and

(iv)

the State coal combustion residuals permit program in meeting the specifications described in subsection (c)(1); and

(B)

identify, in collaboration with the State, a reasonable deadline, which shall be not sooner than 6 months after the State receives the notice, by which the State shall remedy the deficiencies detailed under subparagraph (A).

(e)

Implementation by Administrator

(1)

In general

The Administrator shall implement a coal combustion residuals permit program for a State only in the following circumstances:

(A)

If the Governor of such State notifies the Administrator under subsection (b)(1) that such State will not adopt and implement such a permit program.

(B)

If such State has received a notice under subsection (d) and, after any review brought by the State under section 7006, fails, by the deadline identified in such notice under subsection (d)(2)(B), to remedy the deficiencies detailed in such notice under subsection (d)(2)(A).

(C)

If such State informs the Administrator, in writing, that such State will no longer implement such a permit program.

(2)

Requirements

If the Administrator implements a coal combustion residuals permit program for a State under paragraph (1), such permit program shall consist of the specifications described in subsection (c)(1).

(3)

Enforcement

If the Administrator implements a coal combustion residuals permit program for a State under paragraph (1), the authorities referred to in section 4005(c)(2)(A) shall apply with respect to coal combustion residuals and structures and the Administrator may use such authorities to inspect, gather information, and enforce the requirements of this section in the State.

(f)

State control after implementation by Administrator

(1)

State control

(A)

New adoption and implementation by State

For a State for which the Administrator is implementing a coal combustion residuals permit program under subsection (e)(1)(A), the State may adopt and implement such a permit program by—

(i)

notifying the Administrator that the State will adopt and implement such a permit program;

(ii)

not later than 6 months after the date of such notification, submitting to the Administrator a certification under subsection (b)(2); and

(iii)

receiving from the Administrator—

(I)

a determination that the State coal combustion residuals permit program meets the specifications described in subsection (c)(1); and

(II)

a timeline for transition of control of the coal combustion residuals permit program.

(B)

Remedying deficient permit program

For a State for which the Administrator is implementing a coal combustion residuals permit program under subsection (e)(1)(B), the State may adopt and implement such a permit program by—

(i)

remedying the deficiencies detailed in the notice provided under subsection (d)(2)(A); and

(ii)

receiving from the Administrator—

(I)

a determination that the deficiencies detailed in such notice have been remedied; and

(II)

a timeline for transition of control of the coal combustion residuals permit program.

(C)

Resumption of implementation by State

For a State for which the Administrator is implementing a coal combustion residuals permit program under subsection (e)(1)(C), the State may adopt and implement such a permit program by—

(i)

notifying the Administrator that the State will adopt and implement such a permit program;

(ii)

not later than 6 months after the date of such notification, submitting to the Administrator a certification under subsection (b)(2); and

(iii)

receiving from the Administrator—

(I)

a determination that the State coal combustion residuals permit program meets the specifications described in subsection (c)(1); and

(II)

a timeline for transition of control of the coal combustion residuals permit program.

(2)

Review of determination

(A)

Determination required

The Administrator shall make a determination under paragraph (1) not later than 90 days after the date on which the State submits a certification under paragraph (1)(A)(ii) or (1)(C)(ii), or notifies the Administrator that the deficiencies have been remedied pursuant to paragraph (1)(B)(i), as applicable.

(B)

Review

A State may obtain a review of a determination by the Administrator under paragraph (1) as if such determination was a final regulation for purposes of section 7006.

(3)

Implementation during transition

(A)

Effect on actions and orders

Actions taken or orders issued pursuant to a coal combustion residuals permit program shall remain in effect if—

(i)

a State takes control of its coal combustion residuals permit program from the Administrator under paragraph (1); or

(ii)

the Administrator takes control of a coal combustion residuals permit program from a State under subsection (e).

(B)

Change in requirements

Subparagraph (A) shall apply to such actions and orders until such time as the Administrator or the head of the lead State agency responsible for implementing the coal combustion residuals permit program, as applicable—

(i)

implements changes to the requirements of the coal combustion residuals permit program with respect to the basis for the action or order; or

(ii)

certifies the completion of a corrective action that is the subject of the action or order.

(4)

Single permit program

If a State adopts and implements a coal combustion residuals permit program under this subsection, the Administrator shall cease to implement the permit program implemented under subsection (e) for such State.

(g)

Effect on determination under 4005(c) or 3006

The Administrator shall not consider the implementation of a coal combustion residuals permit program by the Administrator under subsection (e) in making a determination of approval for a permit program or other system of prior approval and conditions under section 4005(c) or of authorization for a program under section 3006.

(h)

Closure

If it is determined, pursuant to a coal combustion residuals permit program, that a structure should close, the time period and method for the closure of such structure shall be set forth in a closure plan that establishes a deadline for completion and that takes into account the nature and the site-specific characteristics of the structure to be closed. In the case of a surface impoundment, the closure plan shall require, at a minimum, the removal of liquid and the stabilization of remaining waste, as necessary to support the final cover.

(i)

Authority

(1)

State authority

Nothing in this section shall preclude or deny any right of any State to adopt or enforce any regulation or requirement respecting coal combustion residuals that is more stringent or broader in scope than a regulation or requirement under this section.

(2)

Authority of the administrator

(A)

In general

Except as provided in subsection (e) of this section and section 6005 of this title, the Administrator shall, with respect to the regulation of coal combustion residuals, defer to the States pursuant to this section.

(B)

Imminent hazard

Nothing in this section shall be construed to affect the authority of the Administrator under section 7003 with respect to coal combustion residuals.

(C)

Technical and enforcement assistance only upon request

Upon request from the head of a lead State agency that is implementing a coal combustion residuals permit program, the Administrator may provide to such State agency only the technical or enforcement assistance requested.

(3)

Citizen suits

Nothing in this section shall be construed to affect the authority of a person to commence a civil action in accordance with section 7002.

(j)

Mine reclamation activities

A coal combustion residuals permit program implemented under subsection (e) by the Administrator shall not apply to the utilization, placement, and storage of coal combustion residuals at surface mining and reclamation operations.

(k)

Definitions

In this section:

(1)

Coal combustion residuals

The term coal combustion residuals means—

(A)

the solid wastes listed in section 3001(b)(3)(A)(i), including recoverable materials from such wastes;

(B)

coal combustion wastes that are co-managed with wastes produced in conjunction with the combustion of coal, provided that such wastes are not segregated and disposed of separately from the coal combustion wastes and comprise a relatively small proportion of the total wastes being disposed in the structure;

(C)

fluidized bed combustion wastes;

(D)

wastes from the co-burning of coal with non-hazardous secondary materials provided that coal makes up at least 50 percent of the total fuel burned; and

(E)

wastes from the co-burning of coal with materials described in subparagraph (A) that are recovered from monofills.

(2)

Coal combustion residuals permit program

The term coal combustion residuals permit program means a permit program or other system of prior approval and conditions that is adopted by or for a State for the management and disposal of coal combustion residuals to the extent such activities occur in structures in such State.

(3)

Structure

The term structure means a landfill, surface impoundment, or other land-based unit which may receive coal combustion residuals.

(4)

Revised criteria

The term revised criteria means the criteria promulgated for municipal solid waste landfill units under section 4004(a) and under section 1008(a)(3), as revised under section 4010(c) in accordance with the requirement of such section that the criteria protect human health and the environment.

.

(b)

Conforming amendment

The table of contents contained in section 1001 of the Solid Waste Disposal Act is amended by inserting after the item relating to section 4010 the following:

.

3.

2000 regulatory determination

Nothing in this Act, or the amendments made by this Act, shall be construed to alter in any manner the Environmental Protection Agency’s regulatory determination entitled Notice of Regulatory Determination on Wastes from the Combustion of Fossil Fuels, published at 65 Fed. Reg. 32214 (May 22, 2000), that the fossil fuel combustion wastes addressed in that determination do not warrant regulation under subtitle C of the Solid Waste Disposal Act (42 U.S.C. 6921 et seq.).