113th CONGRESS
2d Session
S. 1800
AN ACT
To require the Secretary of the Interior to submit to Congress a report on the efforts of the Bureau of Reclamation to manage its infrastructure assets.
Short title
This Act may be cited as the
Bureau of Reclamation Transparency
Act
.
Findings
Congress finds that—
the water resources infrastructure of the Bureau of Reclamation provides important benefits related to irrigated agriculture, municipal and industrial water, hydropower, flood control, fish and wildlife, and recreation in the 17 Reclamation States;
as of 2013, the combined replacement value of the infrastructure assets of the Bureau of Reclamation was $94,500,000,000;
the majority of the water resources infrastructure facilities of the Bureau of Reclamation are at least 60 years old;
the Bureau of Reclamation has previously undertaken efforts to better manage the assets of the
Bureau of Reclamation, including an annual review of asset maintenance
activities of the Bureau of Reclamation known as the Asset Management Plan
; and
actionable information on infrastructure conditions at the asset level, including information on maintenance needs at individual assets due to aging infrastructure, is needed for Congress to conduct oversight of Reclamation facilities and meet the needs of the public.
Definitions
In this Act:
Asset
In general
The term asset
means any of the following assets that are used to achieve the mission of the Bureau of
Reclamation to
manage, develop, and protect water and related resources in an
environmentally and economically sound manner in the interest of the
people of the United States:
Capitalized facilities, buildings, structures, project features, power production equipment, recreation facilities, or quarters.
Capitalized and noncapitalized heavy equipment and other installed equipment.
Inclusions
The term asset
includes assets described in subparagraph (A) that are considered to be mission critical.
Asset Management Report
The term Asset Management Report means—
the annual plan prepared by the Bureau of Reclamation known as the Asset Management Plan
; and
any publicly available information relating to the plan described in subparagraph (A) that summarizes the efforts of the Bureau of Reclamation to evaluate and manage infrastructure assets of the Bureau of Reclamation.
Major repair and rehabilitation need
The term major repair and rehabilitation need
means major nonrecurring maintenance at a Reclamation facility, including maintenance related to
the safety of dams, extraordinary maintenance of dams, deferred major
maintenance activities, and all other significant repairs and
extraordinary maintenance.
Reclamation facility
The term Reclamation facility means each of the infrastructure assets that are owned by the Bureau of Reclamation at a Reclamation project.
Reclamation project
The term Reclamation project
means a project that is owned by the Bureau of Reclamation, including all reserved works and
transferred works owned by the Bureau of Reclamation.
Reserved works
The term reserved works means buildings, structures, facilities, or equipment that are owned by the Bureau of Reclamation for which operations and maintenance are performed by employees of the Bureau of Reclamation or through a contract entered into by the Bureau of Reclamation, regardless of the source of funding for the operations and maintenance.
Secretary
The term Secretary means the Secretary of the Interior.
Transferred works
The term transferred works means a Reclamation facility at which operations and maintenance of the facility is carried out by a non-Federal entity under the provisions of a formal operations and maintenance transfer contract or other legal agreement with the Bureau of Reclamation.
Asset management report enhancements for reserved works
In general
Not later than 2 years after the date of enactment of this Act, the Secretary shall submit to Congress an Asset Management Report that—
describes the efforts of the Bureau of Reclamation—
to maintain in a reliable manner all reserved works at Reclamation facilities; and
to standardize and streamline data reporting and processes across regions and areas for the purpose of maintaining reserved works at Reclamation facilities; and
expands on the information otherwise provided in an Asset Management Report, in accordance with subsection (b).
Infrastructure Maintenance Needs Assessment
In general
The Asset Management Report submitted under subsection (a) shall include—
a detailed assessment of major repair and rehabilitation needs for all reserved works at all Reclamation projects; and
to the extent practicable, an itemized list of major repair and rehabilitation needs of individual Reclamation facilities at each Reclamation project.
Inclusions
To the extent practicable, the itemized list of major repair and rehabilitation needs under paragraph (1)(B) shall include—
a budget level cost estimate of the appropriations needed to complete each item; and
an assignment of a categorical rating for each item, consistent with paragraph (3).
Rating requirements
In general
The system for assigning ratings under paragraph (2)(B) shall be—
consistent with existing uniform categorization systems to inform the annual budget process and agency requirements; and
subject to the guidance and instructions issued under subparagraph (B).
Guidance
As soon as practicable after the date of enactment of this Act, the Secretary shall issue guidance that describes the applicability of the rating system applicable under paragraph (2)(B) to Reclamation facilities.
Public availability
Except as provided in paragraph (5), the Secretary shall make publically available, including on the Internet, the Asset Management Report required under subsection (a).
Confidentiality
Subject to the discretion of the Secretary, the Secretary may exclude from the public version of the Asset Management Report made available under paragraph (4) any information that the Secretary identifies as sensitive or classified, but shall make available to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a version of the report containing the sensitive or classified information.
Updates
Not later than 2 years after the date on which the Asset Management Report is submitted under subsection (a) and biennially thereafter, the Secretary shall update the Asset Management Report, subject to the requirements of section 5(b)(2).
Consultation
The Secretary shall consult with the Secretary of the Army (acting through the Chief of Engineers) to the extent that the consultation would assist the Secretary in preparing the Asset Management Report under subsection (a) and updates to the Asset Management Report under subsection (c).
Asset management report enhancements for transferred works
In general
The Secretary shall coordinate with the non-Federal entities responsible for the operation and maintenance of transferred works in developing reporting requirements for Asset Management Reports with respect to the condition of, and planned maintenance for, transferred works that are similar to the reporting requirements described in section 4(b).
Guidance
In general
After considering input from water and power contractors of the Bureau of Reclamation, the Secretary shall develop and implement a rating system for transferred works that incorporates, to the maximum extent practicable, the rating system for reserved works developed under section 4(b)(3).
Updates
The ratings system developed under paragraph (1) shall be included in the updated Asset Management Reports under section 4(c).
Offset
Notwithstanding any other provision of law, in the case of the project authorized by section 1617 of the Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. 390h–12c), the maximum amount of the Federal share of the cost of the project under section 1631(d)(1) of that Act (43 U.S.C. 390h–13(d)(1)) otherwise available as of the date of enactment of this Act shall be reduced by $2,000,000.
Passed the Senate December 16, 2014.
Secretary