S. 484Senate113th Congress (2013-2015)In Committee

Lead Exposure Reduction Amendments Act of 2013

Introduced March 6, 2013

Legislative Activity

Stay on top of the latest movement without scrolling through every action

3 earlier actions
SenateIntro Referral Latest Action

Sponsor introductory remarks on measure. (CR S1589)

March 11, 2013

View full timeline
SenateIntro Referral

Introduced in Senate

March 6, 2013

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S1235-1236)

March 6, 2013

SenateIntro Referral

Read twice and referred to the Committee on Environment and Public Works. (text of measure as introduced: CR S1236-1237)

March 6, 2013

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S1589)

March 11, 2013

Floor Debate

7 members

What members said about S. 484 on the floor

2 Republicans5 Democrats
Dianne Feinstein
Sen. Dianne FeinsteinD-CA · Mar 6, 2013

Mr. President, I rise today to reintroduce the Tribal Gaming Eligibility Act. This bill sets forth what I believe is a very reasonable, moderate standard for where tribes are allowed to open gaming…

Chuck Grassley
Sen. Chuck GrassleyR-IA · Mar 6, 2013

Mr. President, back in 2003, the Government Accountability Office, the investigative arm of Congress, issued a report that revealed that suspected terrorists could stay in the country after their…

Benjamin L. Cardin
Sen. Benjamin L. CardinD-MD · Mar 6, 2013

Mr. President, today I am proud to reintroduce legislation to support greater public involvement in the administration of one of Maryland's most treasured National Historical Parks. The Chesapeake…

James M. Inhofe
Sen. James M. InhofeR-OK · Mar 6, 2013

Mr. President, I rise today to introduce the Lead Exposure Reduction Amendments Act of 2013. In April 2010, an EPA rule governing work done in homes constructed before 1978 took effect. The aim of…

James M. Inhofe
Sen. James M. InhofeR-OK · Mar 6, 2013

Mr. President, I rise today to introduce the Lead Exposure Reduction Amendments Act of 2013. In April 2010, an EPA rule governing work done in homes constructed before 1978 took effect. The aim of…

Show 4 more
John D. Rockefeller IV
Sen. John D. Rockefeller IVD-WV · Mar 6, 2013

Mr. President, in West Virginia, we revere our miners--the men and women who put their lives on the line every single day to provide for their families and bring light and heat to millions. Their…

Barbara Boxer
Sen. Barbara BoxerD-CA · Mar 6, 2013

Mr. President, I am pleased to introduce the Berryessa Snow Mountain National Conservation Area Act. Congressman Mike Thompson and I introduced this legislation in the 112th Congress, and I am glad…

James M. Inhofe
Sen. James M. InhofeR-OK · Mar 11, 2013

Madam President, I want to thank Senator Wicker for being an original supporter of S. 484, a bill aiming to improve EPA's lead paint rule. He has been a tremendous help throughout the long effort we…

Tom Harkin
Sen. Tom HarkinD-IA · Mar 6, 2013

Mr. President, I ask unanimous consent that the text of the bill be printed in the Record.

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued March 6, 2013

II

113th CONGRESS

1st Session

S. 484

IN THE SENATE OF THE UNITED STATES

March 6, 2013

Mr. Inhofe (for himself, Mr. Vitter, Mr. Coburn, Mr. Enzi, Mrs. Fischer, Mr. Blunt, and Mr. Grassley) introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works

A BILL

To amend the Toxic Substances Control Act relating to lead-based paint renovation and remodeling activities.

1.

Short title

This Act may be cited as the Lead Exposure Reduction Amendments Act of 2013.

2.

Definitions

Section 401 of the Toxic Substances Control Act (15 U.S.C. 2681) is amended—

(1)

in paragraph (1)—

(A)

by redesignating subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and indenting the clauses appropriately;

(B)

in the first sentence, by striking The term and inserting the following:

(A)

In general

The term

;

(C)

by striking Such term includes— and inserting the following:

(B)

Inclusions

The term abatement includes—

; and

(D)

by adding at the end the following:

(C)

Exclusions

The term abatement does not include any renovation, remodeling, or other activity—

(i)

the primary purpose of which is to repair, restore, or remodel target housing, public buildings constructed before 1978, or commercial buildings; and

(ii)

that incidentally results in a reduction or elimination of lead-based paint hazards.

;

(2)

by redesignating—

(A)

paragraphs (4) through (12) as paragraphs (5) through (13);

(B)

paragraph (13) as paragraph (15); and

(C)

paragraphs (14) through (17) and paragraphs (18) through (21), respectively;

(3)

by inserting after paragraph (3) the following:

(4)

Emergency renovation

The term emergency renovation means a renovation or remodeling activity that is carried out in response to an event—

(A)

that is an act of God, as that term is defined in section 101(1) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; or

(B)

that if not attended to as soon as is practicable—

(i)

presents a risk to the public health or safety; or

(ii)

threatens to cause significant damage to equipment or property.

;

(4)

by striking paragraph (10) (as redesignated by paragraph (2)) and inserting the following:

(10)

Lead-based paint

(A)

In general

The term lead-based paint means paint or other surface coatings that contain lead in excess of—

(i)

1.0 milligrams per centimeter squared; or

(ii)

0.5 percent by weight.

(B)

Target housing

With respect to paint or other surface coatings on target housing, the term lead-based paint means paint or other surface coatings that contain lead in excess of the lower of—

(i)

the level described in subparagraph (A); or

(ii)

a level established by the Secretary of Housing and Urban Development under section 302(c) of the Lead-Based Paint Poisoning Prevention Act.

;

(5)

by inserting after paragraph (13) (as redesignated by paragraph (2)) the following:

(14)

Postabatement clearance testing

The term postabatement clearance testing means testing that—

(A)

is carried out upon the completion of any lead-based paint activity to ensure that—

(i)

the reduction is complete; and

(ii)

no lead-based paint hazards remain in the area in which the lead-based paint activity occurs; and

(B)

includes a visual assessment and the collection and analysis of environmental samples from an area in which lead-based paint activities occur.

; and

(6)

by inserting after paragraph (15) (as redesignated by paragraph (2)) the following:

(16)

Renovation

The term renovation has the meaning given such term in section 745.83 of title 40, Code of Federal Regulations, as in effect on the date of enactment of this paragraph.

(17)

Renovation and remodeling regulation

The term renovation and remodeling regulation means a regulation promulgated under section 402(a) and revised pursuant to section 402(c)(3)(A), as such regulation is applied to renovation or remodeling activities in target housing, public buildings constructed before 1978, and commercial buildings.

.

3.

Lead-based paint activities training and certification

Section 402(c) of the Toxic Substances Control Act (15 U.S.C. 2682(c)) is amended—

(1)

by striking paragraph (2) and inserting the following:

(2)

Study of certification

(A)

In general

Not later than 1 year prior to proposing any renovation and remodeling regulation after the date of enactment of the Lead Exposure Reduction Amendments Act of 2012, the Administrator shall conduct, submit to the Congress, and make available for public comment (after peer review) the results of, a study of the extent to which persons engaged in various types of renovation and remodeling activities in target housing, public buildings constructed before 1978, or commercial buildings—

(i)

are exposed to lead in the conduct of such activities; and

(ii)

disturb lead and create a lead-based paint hazard on a regular or occasional basis in the conduct of such activities.

(B)

Scope and coverage

Each study conducted under subparagraph (A) shall consider the risks described in clauses (i) and (ii) of such subparagraph with respect to each separate building type described in such subparagraph, as the regulation to be proposed would apply to each such building type.

;

(2)

in paragraph (3)—

(A)

in the first sentence by striking Within 4 years and inserting the following:

(A)

In general

Not later than 4 years

; and

(B)

by adding at the end the following:

(B)

Exemption

An emergency renovation shall be exempt from any renovation and remodeling regulation, and a person carrying out an emergency renovation shall be exempt from any regulation promulgated under section 406(b) with respect to the emergency renovation.

(C)

Prohibition on postabatement clearance requirement

No renovation and remodeling regulation may require postabatement clearance testing.

; and

(3)

by adding at the end the following:

(4)

Target housing owners

(A)

In general

Not later than 60 days after the date of enactment of this paragraph, and subject to subparagraph (B), the Administrator shall promulgate regulations to permit an owner of a residential dwelling that is target housing, who resides in such residential dwelling, to authorize a contractor to forgo compliance with the requirements of a renovation and remodeling regulation with respect to such residential dwelling.

(B)

Written certification

The regulations promulgated under subparagraph (A) shall require that an owner of a residential dwelling that is target housing, who resides in such residential dwelling, may only authorize a contractor to forgo compliance with the requirements of a renovation and remodeling regulation if the owner submits to such contractor a written certification stating that—

(i)

the renovation or remodeling project is to be carried out at the residential dwelling in which the owner resides;

(ii)

no pregnant woman or child under the age of 6 resides in the residential dwelling as of the date on which the renovation or remodeling project commences, or will reside in the residential dwelling for the duration of such project; and

(iii)

the owner acknowledges that, in carrying out the project, such contractor will be exempt from the requirements of a renovation and remodeling regulation.

(C)

Restriction

A contractor may not forgo compliance with the requirements of a renovation and remodeling regulation pursuant to a written certification submitted under subparagraph (B) if such contractor has actual knowledge of a pregnant woman or child under the age of 6 residing in the residential dwelling as of the date on which the renovation or remodeling commences (and for the duration of such project).

(D)

Limitation of contractor liability

The Administrator may not hold a contractor responsible for a misrepresentation made by the owner of a residential dwelling in a written certification submitted under subparagraph (B), unless the contractor has actual knowledge of such a misrepresentation.

(5)

Test kits

(A)

In general

(i)

Recognition

The Administrator shall recognize for use under this title a qualifying test kit, and publish in the Federal Register notice of such recognition.

(ii)

Suspension of enforcement of certain regulations

If, not later than 1 year after the date of enactment of this paragraph, the Administrator does not recognize a qualifying test kit under clause (i), the Administrator—

(I)

shall publish in the Federal Register notice of such failure to recognize a qualifying test kit; and

(II)

except as provided in clause (iii), may not enforce any post-1960 building renovation and remodeling regulation, with respect to a period beginning on the date that is 1 year after the date of enactment of this paragraph and ending on the date that is 6 months after the date on which the Administrator—

(aa)

recognizes for use under this title a qualifying test kit; and

(bb)

publishes in the Federal Register notice of such recognition and of the date on which enforcement of the post-1960 building renovation and remodeling regulations will resume.

(iii)

Applicability of suspension

The Administrator shall not suspend enforcement of any post-1960 building renovation and remodeling regulation for the period described in clause (ii)(II) with respect to a residential dwelling in which a pregnant woman or child under the age of 6 resides.

(B)

Qualifying test kit

In this subsection, the term qualifying test kit means a chemical test that—

(i)

can determine the presence of lead-based paint, as defined in section 401(10)(A);

(ii)

has a false positive response rate of 10 percent or less;

(iii)

has a false negative response rate of 5 percent or less;

(iv)

does not require the use of off-site laboratory analysis to obtain results;

(v)

is inexpensively and commercially available; and

(vi)

does not require special training to use.

(C)

Post-1960 building renovation and remodeling regulation

In this subsection, the term post-1960 building renovation and remodeling regulation means a renovation and remodeling regulation, as it applies to—

(i)

target housing constructed after January 1, 1960;

(ii)

public buildings constructed between January 1, 1960 and January 1, 1978; and

(iii)

commercial buildings constructed after January 1, 1960.

(6)

Applicability of certain penalties

Any renovation and remodeling regulation requiring the submission of documentation to the Administrator shall provide—

(A)

an exemption from an applicable penalty for failure to comply with such requirement for a person who—

(i)

is submitting the required documentation for the first time; and

(ii)

submits documentation that contains only de minimus or typographical errors, as determined by the Administrator; and

(B)

a process by which a person described in subparagraph (A) may resubmit the required documentation.

(7)

Accreditation of recertification courses

The hands-on training requirements required by subsection (a)(2)(D) shall not apply to any recertification course accredited by the Environmental Protection Agency that is otherwise required to be completed under this title by a person that is certified to engage in renovation and remodeling activities.

.