H.R. 161House114th Congress (2015-2017)Passed House

Natural Gas Pipeline Permitting Reform Act

Introduced January 6, 2015

Legislative Activity

Stay on top of the latest movement without scrolling through every action

15 earlier actions
SenateIntro Referral Latest Action

Received in the Senate.

January 22, 2015

View full timeline
HouseIntro Referral

Introduced in House

January 6, 2015

HouseIntro Referral

Referred to the House Committee on Energy and Commerce.

January 6, 2015

HouseCommittee

Referred to the Subcommittee on Energy and Power.

January 9, 2015

HouseFloor

Rules Committee Resolution H. Res. 38 Reported to House. The rule provides for one hour of debate on each measure. The resolution waives all points of order against consideration of the bills. The resolution provides that the bills shall be considered as read. The resolution waives all points of order against provisions in the bills. The resolution provides one motion to recommit per bill.

January 20, 2015 • 4:29 PM

HouseFloor

Considered under the provisions of rule H. Res. 38. (consideration: CR H453-460)

January 21, 2015 • 2:16 PM

HouseFloor

The rule provides for one hour of debate each on H.R. 161 and H.R. 36. The resolution waives all points of order against consideration of the bills. The resolution provides that the bills shall be considered as read. The resolution waives all points of order against provisions in the bills. The resolution provides one motion to recommit per bill.

January 21, 2015 • 2:16 PM

HouseFloor

DEBATE - Pursuant to the provsions of H. Res. 38, the House proceeded with one hour of debate on H.R. 161.

January 21, 2015 • 2:16 PM

HouseFloor

The previous question was ordered pursuant to the rule. (consideration: CR H458)

January 21, 2015 • 2:54 PM

HouseFloor

Mr. Pallone moved to recommit with instructions to the Committee on Energy and Commerce. (consideration: CR H458-459; text: CR H458)

January 21, 2015 • 2:55 PM

HouseFloor

DEBATE - The House proceeded with ten minutes of debate on the Pallone motion to recommit with instructions, pending reservation of a point of order. The instructions contained in the motion seek to require the bill to be reported back to the House with an amendment ensuring that the provisions in the bill do not take effect unless the Federal Energy Regulatory Commission (FERC) determines that: (1) taxpayers will not be held liable for any repair or environmental cleanup from a natural gas pipeline explosion and (2) pipeline owners will bear full responsibility for damages in any community resulting from a natural gas pipeline explosion, including loss of life. Subsequently, the reservation of a point of order was withdrawn.

January 21, 2015 • 2:55 PM

HouseFloor

The previous question on the motion to recommit with instructions was ordered without objection. (consideration: CR H459)

January 21, 2015 • 3:04 PM

HouseFloor

On motion to recommit with instructions Failed by the Yeas and Nays: 182 - 241 (Roll no. 40).

January 21, 2015 • 3:33 PM

HouseFloor

Passed/agreed to in House: On passage Passed by the Yeas and Nays: 253 - 169 (Roll no. 41).(text: CR H453)

January 21, 2015 • 3:44 PM

HouseFloor

On passage Passed by the Yeas and Nays: 253 - 169 (Roll no. 41). (text: CR H453)

January 21, 2015 • 3:44 PM

HouseFloor

Motion to reconsider laid on the table Agreed to without objection.

January 21, 2015 • 3:44 PM

SenateIntro Referral

Received in the Senate.

January 22, 2015

Floor Debate

24 members

What members said about H.R. 161 on the floor

8 Republicans16 Democrats
Frank Pallone, Jr.
Rep. Frank Pallone, Jr.D-NJ-6 · Jan 21, 2015

Mr. Speaker, I yield myself such time as I may consume and rise in opposition to this bill. Mr. Speaker, I listened to my colleague, the chairman of the Energy and Commerce Committee, when he said…

Virginia Foxx
Rep. Virginia FoxxR-NC-5 · Jan 21, 2015

Mr. Speaker, by direction of the Committee on Rules, I call up House Resolution 38 and ask for its immediate consideration. Mr. Speaker, for the purpose of debate only, I yield the customary 30…

James P. McGovern
Rep. James P. McGovernD-MA-2 · Jan 21, 2015

Mr. Speaker, I want to thank the gentlewoman from North Carolina for yielding me the customary 30 minutes, and I yield myself such time as I may consume. Mr. Speaker, while I have great respect for…

Louise McIntosh Slaughter
Rep. Louise McIntosh SlaughterD-NY-25 · Jan 21, 2015

I want to thank my colleague for his great work and for yielding to me. Mr. Speaker, today, The Wall Street Journal polled the American public and found that these are their top three priorities:…

Ed Whitfield
Rep. Ed WhitfieldR-KY-1 · Jan 21, 2015

Mr. Speaker, pursuant to House Resolution 38, I call up the bill (H.R. 161) to provide for the timely consideration of all licenses, permits, and approvals required under Federal law with respect to…

Show 8 more
Christopher H. Smith
Rep. Christopher H. SmithR-NJ-4 · Jan 21, 2015

Mr. Speaker, I thank my very good friend for yielding and thank her for her strong leadership for human rights and for the unborn. Mr. Speaker, pain--we all dread it, we avoid it, we even fear it,…

Mike Pompeo
Rep. Mike PompeoR-KS-4 · Jan 21, 2015

Mr. Speaker, I thank the gentleman for yielding to me, and I rise in support of H.R. 161. We are tens of thousands of miles of pipeline capacity short of the necessary pipelines to carry natural gas…

Niki Tsongas
Rep. Niki TsongasD-MA-3 · Jan 21, 2015

Mr. Speaker, I thank my colleague for yielding. I rise today in strong opposition to H.R. 161, the so-called Natural Gas Pipeline Permitting Reform Act. My home State of Massachusetts, like many…

Gene Green
Rep. Gene GreenD-TX-29 · Jan 21, 2015

Mr. Speaker, I rise today in opposition to H.R. 161, a bill that claims to expedite applications for construction of natural gas pipelines in the United States. First, let me say as a native…

Pete Aguilar
Rep. Pete AguilarD-CA-31 · Jan 21, 2015

Mr. Speaker, natural gas pipeline explosions do happen. Last week, a pipeline exploded in Mississippi. Last year, pipelines exploded in Minnesota, Nebraska, North Dakota, and Kentucky. In 2013, a…

Barbara Lee
Rep. Barbara LeeD-CA-13 · Jan 21, 2015

I want to thank the ranking member for yielding, for his leadership, and for really making it clear exactly what we are dealing with today and why many of us strongly oppose this rule and this bill.…

Theodore E. Deutch
Rep. Theodore E. DeutchD-FL-21 · Jan 21, 2015

Mr. Speaker, I thank my friend from Massachusetts, a leader in the fight to get money out of politics. Last night, in his State of the Union Address, President Obama called on Republicans and…

Fred Upton
Rep. Fred UptonR-MI-6 · Jan 21, 2015

Mr. Speaker, when it comes to natural gas production, we are number one. What was once a pipe dream is now a global reality, thanks to American ingenuity and technology. An impressive accomplishment,…

Show 11 more
Carolyn B. Maloney
Rep. Carolyn B. MaloneyD-NY-12 · Jan 21, 2015

I thank the gentleman for his leadership and for yielding. Mr. Speaker, I rise in opposition to this rule. After all the talk by our Republican friends about focusing their efforts on jobs and…

Tammy Duckworth
Rep. Tammy DuckworthD-IL-8 · Feb 3, 2015

Mr. Speaker, on January 21, 2015, on Roll Call #38 on Ordering the Previous Question for H. Res. 38, I am not recorded because I was absent for medical reasons. Had I been present, I would have voted…

Rosa L. DeLauro
Rep. Rosa L. DeLauroD-CT-3 · Jan 21, 2015

Mr. Speaker, I rise in opposition to this rule and to the underlying bill. This bill is just as unconstitutional as it was when it was introduced in the last Congress. It poses just as serious a risk…

Trent Franks
Rep. Trent FranksR-AZ-8 · Jan 21, 2015

I thank the gentlewoman. Mr. Speaker, a great shadow looms over America, the home of the brave. More than 18,000 very late-term abortions are occurring in America every year, placing the mothers at…

Steve Cohen
Rep. Steve CohenD-TN-9 · Jan 21, 2015

Thank you, Mr. McGovern. Mr. Speaker, the fact is that pain is a subterfuge. This bill is not about pain to the fetus. This bill is about outlawing abortion and repealing Roe v. Wade. The other side…

Bruce Poliquin
Rep. Bruce PoliquinR-ME-2 · Jan 21, 2015

Mr. Speaker, I rise in support of the rule and, most importantly, of the underlying bill, H.R. 161, the Natural Gas Pipeline Permitting Reform Act. I encourage all of my colleagues, Republicans and…

John P. Sarbanes
Rep. John P. SarbanesD-MD-3 · Jan 21, 2015

I thank the gentleman for yielding. Mr. Speaker, I urge a ``no'' vote on ordering the previous question, so that we can consider the constitutional amendment, the Democracy for All amendment, that…

Katherine M. Clark
Rep. Katherine M. ClarkD-MA-5 · Jan 21, 2015

I thank the gentleman for yielding. Mr. Speaker, here we go again. Instead of prioritizing the needs of women and families, we are once again discussing a bill that attacks women's rights. When I ask…

Chris Van Hollen
Rep. Chris Van HollenD-MD-8 · Feb 2, 2015

Mr. Speaker, I rise in opposition to this unnecessary legislation, which would place arbitrary deadlines on Federal Energy Regulatory Commission (FERC) decisions, potentially forcing them to deny…

Tim Huelskamp
Rep. Tim HuelskampR-KS-1 · Jan 21, 2015

I thank the gentlewoman from North Carolina for yielding. Mr. Speaker, over these next 2 days, you will hear many of my colleagues rise in support of H.R. 36, as well they should. This bill protects…

Matt Cartwright
Rep. Matt CartwrightD-PA-17 · Jan 21, 2015

Mr. Speaker, I rise today to express my frustration in the process by which this bill was brought to the floor and my disappointment that the process has yielded a bill that I cannot support. This…

Bill Text

3 versions available

Reading Mode
Latest
Received in SenateIssued January 22, 2015

II

114th CONGRESS

1st Session

H. R. 161

IN THE SENATE OF THE UNITED STATES

January 22, 2015

Received

AN ACT

To provide for the timely consideration of all licenses, permits, and approvals required under Federal law with respect to the siting, construction, expansion, or operation of any natural gas pipeline projects.

1.

Short title

This Act may be cited as the Natural Gas Pipeline Permitting Reform Act.

2.

Regulatory approval of natural gas pipeline projects

Section 7 of the Natural Gas Act (15 U.S.C. 717f) is amended by adding at the end the following new subsection:

(i)
(1)

The Commission shall approve or deny an application for a certificate of public convenience and necessity for a prefiled project not later than 12 months after receiving a complete application that is ready to be processed, as defined by the Commission by regulation.

(2)

The agency responsible for issuing any license, permit, or approval required under Federal law in connection with a prefiled project for which a certificate of public convenience and necessity is sought under this Act shall approve or deny the issuance of the license, permit, or approval not later than 90 days after the Commission issues its final environmental document relating to the project.

(3)

The Commission may extend the time period under paragraph (2) by 30 days if an agency demonstrates that it cannot otherwise complete the process required to approve or deny the license, permit, or approval, and therefor will be compelled to deny the license, permit, or approval. In granting an extension under this paragraph, the Commission may offer technical assistance to the agency as necessary to address conditions preventing the completion of the review of the application for the license, permit, or approval.

(4)

If an agency described in paragraph (2) does not approve or deny the issuance of the license, permit, or approval within the time period specified under paragraph (2) or (3), as applicable, such license, permit, or approval shall take effect upon the expiration of 30 days after the end of such period. The Commission shall incorporate into the terms of such license, permit, or approval any conditions proffered by the agency described in paragraph (2) that the Commission does not find are inconsistent with the final environmental document.

(5)

For purposes of this subsection, the term prefiled project means a project for the siting, construction, expansion, or operation of a natural gas pipeline with respect to which a prefiling docket number has been assigned by the Commission pursuant to a prefiling process established by the Commission for the purpose of


facilitating the formal application process for obtaining a certificate of public convenience and necessity.

.

Passed the House of Representatives January 21, 2015.

Karen L. Haas,

Clerk