S. 730Senate115th Congress (2017-2019)In Committee

A bill to extend the deadline for commencement of construction of certain hydroelectric projects.

Sponsored by Tim KaineSen. Tim Kaine (D-VA)
Introduced March 27, 2017

AI-Generated Summary

Updated April 15, 2026 at 2:07 PM UTC

The bill lets the Federal Energy Regulatory Commission (FERC) give more time to start building two specific hydroelectric projects (numbers 12737 and 12740). It allows the agency to add up to three extra two‑year extensions if the project’s licensee asks for it and the extension meets public‑interest and due‑diligence standards. If a license had already expired before the law took effect, the bill also lets FERC reinstate that license and begin the first extension right away.

Key Provisions

  • FERC may extend the construction‑start deadline for projects 12737 and 12740 for up to three consecutive 2‑year periods, but only after the licensee requests it, the agency gives reasonable notice, and the extension meets good‑faith, due‑diligence, and public‑interest requirements.
  • If a project's construction deadline had already passed before the bill became law, FERC can reinstate the expired license and treat the reinstatement date as the start of the first allowable extension.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

4 earlier actions
SenateCalendars Latest Action

Placed on Senate Legislative Calendar under General Orders. Calendar No. 101.

May 24, 2017

View full timeline
SenateIntro Referral

Introduced in Senate

March 27, 2017

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources. (Sponsor introductory remarks on measure: CR S1999)

March 27, 2017

SenateCommittee

Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.

March 30, 2017

SenateCommittee

Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-82.

May 24, 2017

SenateCalendars

Placed on Senate Legislative Calendar under General Orders. Calendar No. 101.

May 24, 2017

Floor Debate

3 members

What members said about S. 730 on the floor

1 Republican2 Democrats
Dianne Feinstein
Sen. Dianne FeinsteinD-CA · Mar 27, 2017

Mr. President, I speak on behalf of myself and Senator Harris to reintroduce legislation to establish the Sacramento- San Joaquin Delta National Heritage Area, California's first National Heritage…

Tim Kaine
Sen. Tim KaineD-VA · Mar 27, 2017

Mr. President, today I am introducing a bipartisan, noncontroversial, technical provision pertaining to two proposed hydroelectric projects at U.S. Army Corps of Engineers dams in Virginia. This bill…

Tim Kaine
Sen. Tim KaineD-VA · Mar 27, 2017

Mr. President, today I am introducing a bipartisan, noncontroversial, technical provision pertaining to two proposed hydroelectric projects at U.S. Army Corps of Engineers dams in Virginia. This bill…

Mitch McConnell
Sen. Mitch McConnellR-KY · Mar 27, 2017

Mr. President, I ask unanimous consent that the text of the bill be printed in the Record.

Bill Text

2 versions available

Reading Mode
Latest
Reported to SenateIssued May 24, 2017

II

Calendar No. 101

115th CONGRESS

1st Session

S. 730

[Report No. 115–82]

IN THE SENATE OF THE UNITED STATES

March 27, 2017

Mr. Kaine introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

May 24, 2017

Reported by Ms. Murkowski, without amendment

A BILL

To extend the deadline for commencement of construction of certain hydroelectric projects.

1.

Extension of deadline for certain hydroelectric projects

(a)

In general

Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C. 806) that would otherwise apply to the Federal Energy Regulatory Commission (referred to in this section as the Commission) projects numbered 12737 and 12740, the Commission may, at the request of the licensee for the applicable project, and after reasonable notice, in accordance with the good faith, due diligence, and public interest requirements of that section and the procedures of the Commission under that section, extend the time period during which the licensee is required to commence the construction of the applicable project for up to 3 consecutive 2-year periods from the date of the expiration of the extension originally issued by the Commission.

(b)

Reinstatement of expired license

If the period required for commencement of construction of a project described in subsection (a) has expired prior to the date of enactment of this Act—

(1)

the Commission may reinstate the license for the applicable project effective as of the date of the expiration of the license; and

(2)

the first extension authorized under subsection (a) shall take effect on that expiration.

May 24, 2017

Reported without amendment