The GRID Act directs the Energy Secretary to create a program that makes the U.S. electric grid less vulnerable to physical attacks, cyber threats, severe weather, and other hazards. It focuses on strategically locating and reserving large power transformers and other critical equipment, and it supports domestic manufacturing of that equipment. The bill affects the Department of Energy, electric utilities, transformer manufacturers, and related infrastructure owners.

Key Provisions

  • Establish a DOE program to reduce grid vulnerability to attacks, EMP, geomagnetic storms, severe weather, climate change, and seismic events.
  • Require large transformers and critical grid equipment to be strategically placed for quick replacement after damage.
  • Create one or more federally owned strategic reserves of critical equipment, with a preference for U.S.-produced iron and steel, and allow waivers under specific conditions.
  • Support domestic manufacturing of transformers and related gear through grants, loans, and technical assistance.
  • Coordinate the program with the FERC, reliability councils, manufacturers, and owners of critical infrastructure.
  • Mandate prevailing‑wage rules for any federally funded work under the program.
  • Authorize $75 million per fiscal year from 2022 through 2026 to fund the program.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
HouseCommittee Latest Action

Referred to the Subcommittee on Energy.

February 21, 2022

View full timeline
HouseIntro Referral

Introduced in House

February 18, 2022

HouseIntro Referral

Referred to the House Committee on Energy and Commerce.

February 18, 2022

HouseCommittee

Referred to the Subcommittee on Energy.

February 21, 2022

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in HouseIssued February 18, 2022

I

117th CONGRESS

2d Session

H. R. 6779

IN THE HOUSE OF REPRESENTATIVES

February 18, 2022

Mr. Lamb (for himself and Mr. Gonzalez of Ohio) introduced the following bill; which was referred to the Committee on Energy and Commerce

A BILL

To direct the Secretary of Energy to establish a program to reduce the vulnerability of the electric grid to physical attack, cyber attack, and other events, including by ensuring that large power transformers and other critical electric grid equipment are strategically located to ensure timely replacement of such equipment as may be necessary, and for other purposes.

1.

Short title

This Act may be cited as the Grid Resilience and Infrastructure Depot Act of 2022 or the GRID Act of 2022.

2.

Strategic transformer reserve and resilience program

(a)

Establishment

The Secretary shall establish a program to reduce the vulnerability of the electric grid to physical attack, cyber attack, electromagnetic pulse, geomagnetic disturbances, severe weather, climate change, and seismic events, including by—

(1)

ensuring that large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment are strategically located to ensure timely replacement of such equipment as may be necessary to restore electric grid function rapidly in the event of severe damage to the electric grid due to physical attack, cyber attack, electromagnetic pulse, geomagnetic disturbances, severe weather, climate change, or seismic events; and

(2)

establishing a coordinated plan to facilitate transportation of large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment.

(b)

Transformer resilience

In carrying out the program established under subsection (a), the Secretary shall—

(1)

improve large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment by reducing their vulnerabilities;

(2)

develop, test, and deploy innovative equipment designs that are more flexible and offer greater resiliency of electric grid functions;

(3)

coordinate with industry and manufacturers to standardize large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment;

(4)

monitor and test large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment that the Secretary determines may pose a risk to the bulk-power system or national security; and

(5)

facilitate the domestic manufacturing of large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment through the issuance of grants and loans, and through the provision of technical support.

(c)

Strategic equipment reserves

(1)

Authorization

In carrying out the program established under subsection (a), the Secretary may establish one or more federally owned strategic equipment reserves, as appropriate, to ensure nationwide access to large power transformers, generator step-up transformers, power conversion equipment, and other critical electric grid equipment.

(2)

Consideration

In establishing any federally owned strategic equipment reserve, the Secretary may consider existing spare transformer and equipment programs and requirements established by the private sector, Regional Transmission Organizations, Independent System Operators, and State regulatory authorities.

(3)

Iron and steel

(A)

In general

In establishing any federally owned strategic equipment reserve, no Federal funds shall be used for the purchase of large power transformers, generator step-up transformers, power conversion equipment, or other critical electric grid equipment unless all of the iron and steel products used in such equipment are produced in the United States.

(B)

Waiver

(i)

In general

The Secretary shall waive application of subparagraph (A) in any case or category of cases in which the Secretary finds that—

(I)

applying subparagraph (A) would be inconsistent with the public interest;

(II)

iron and steel products are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or

(III)

inclusion of iron and steel products produced in the United States will increase the cost of the applicable large power transformers, generator step-up transformers, power conversion equipment, or other critical electric grid equipment by more than 25 percent.

(ii)

Process

Before issuing a waiver under this subparagraph, the Secretary shall—

(I)

make publicly available in an easily accessible location on a website designated by the Office of Management and Budget and on the website of the Department of Energy a detailed written explanation for the proposed determination to issue the waiver; and

(II)

provide a period of not less than 15 days for public comment on the proposed waiver.

(C)

International agreements

This paragraph shall be applied in a manner consistent with United States obligations under international agreements.

(D)

Definitions

In this paragraph—

(i)

the term iron and steel products includes electrical steel used in the manufacture of—

(I)

transformers; and

(II)

laminations, cores, and other transformer components; and

(ii)

in the case of iron and steel products, the term produced in the United States means that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

(d)

Consultation

The program established under subsection (a) shall be carried out in consultation with the Federal Energy Regulatory Commission, the Electricity Subsector Coordinating Council, the Electric Reliability Organization, manufacturers, and owners and operators of critical electric infrastructure and defense and military installations.

(e)

Prevailing wages

Any laborer or mechanic employed by any contractor or subcontractor in the performance of work funded directly, or assisted in whole or in part, by the Federal Government pursuant to this section shall be paid wages at rates not less than those prevailing on work of a similar character in the locality, as determined by the Secretary of Labor under subchapter IV of chapter 31 of title 40, United States Code (commonly referred to as the Davis-Bacon Act). With respect to the labor standards in this subsection, the Secretary of Labor shall have the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (64 Stat. 1267; 5 U.S.C. App.) and section 3145 of title 40, United States Code.

(f)

Authorization of appropriations

There is authorized to be appropriated to carry out this section $75,000,000 for each of fiscal years 2022 through 2026, and such amounts shall remain available until expended.

(g)

Definitions

In this section:

(1)

Bulk-power system; Electric Reliability Organization

The terms bulk-power system and Electric Reliability Organization have the meaning given such terms in section 215 of the Federal Power Act (16 U.S.C. 824o).

(2)

Critical electric infrastructure

The term critical electric infrastructure has the meaning given such term in section 215A of the Federal Power Act (16 U.S.C. 824o–1).

(3)

Independent System Operator; Regional Transmission Organization State regulatory authority

The terms Regional Transmission Organization, Independent System Operator, and State regulatory authority have the meaning given such terms in section 3 of the Federal Power Act (16 U.S.C. 796).

(4)

Secretary

The term Secretary means the Secretary of Energy.