S. 3373Senate118th Congress (2023-2025)Passed Senate

A bill to require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.

Introduced November 30, 2023

AI-Generated Summary

Updated January 20, 2026 at 1:17 PM UTC

The bill requires the Federal Energy Regulatory Commission (FERC) to give certain hydropower license holders more time to start building. It applies to projects that received a license before March 13, 2020. Under the bill, FERC can add up to four extra years to the standard eight‑year construction deadline, and it can reinstate licenses that have already expired after December 31, 2023.

Key Provisions

  • Defines “covered project” as any hydropower project licensed before March 13, 2020.
  • Allows a licensee to request, and FERC to grant, an additional four‑year extension beyond the existing eight‑year construction deadline, after reasonable notice and showing good cause.
  • Specifies that the extension period begins when the original construction deadline ends and runs for four years.
  • Permits FERC to reinstate a license that expired after December 31, 2023 and before the law’s enactment, with the extension taking effect from the expiration date.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

7 earlier actions
HouseFloor Latest Action

Held at the desk.

December 18, 2024 • 6:25 PM

View full timeline
SenateIntro Referral

Introduced in Senate

November 30, 2023

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources.

November 30, 2023

SenateCommittee

Senate Committee on Energy and Natural Resources discharged by Unanimous Consent.

December 18, 2024

SenateFloor

Measure laid before Senate by unanimous consent. (consideration: CR S7133)

December 18, 2024

SenateFloor

Passed Senate with an amendment by Unanimous Consent. (text of amendment in the nature of a substitute: CR S7134)

December 18, 2024

SenateFloor

Message on Senate action sent to the House.

December 18, 2024

HouseFloor

Received in the House.

December 18, 2024 • 6:01 PM

HouseFloor

Held at the desk.

December 18, 2024 • 6:25 PM

Floor Debate

3 members

What members said about S. 3373 on the floor

2 Republicans1 Democrat
John W. Hickenlooper
Sen. John W. HickenlooperD-CO · Dec 18, 2024

Madam President, in Colorado and across the West, as you know as well as I, many, many communities are facing a historic drought crisis. Decades of drought are, in fact, long-term aridification and…

Cynthia M. Lummis
Sen. Cynthia M. LummisR-WY · Dec 18, 2024

Madam President, I am proud to support H.R. 4385, the Drought Preparedness Act, which I joined my colleague from Colorado in introducing. Senator Hickenlooper has been fabulous to work with, as have…

Bill Cassidy
Sen. Bill CassidyR-LA · Dec 18, 2024

Madam President, I am speaking to S. 3373, the hydropower license extension, which helps a lock on the Red River and Overton Lock projects. This bill is incredibly important to Louisiana. Hydropower…

John W. Hickenlooper
Sen. John W. HickenlooperD-CO · Dec 18, 2024

Madam President, I ask unanimous consent the Committee on Energy and Natural Resources be discharged from further consideration of S. 3373, H.R. 4385, and H.R. 5770, and the Senate proceed to the…

Bill Text

2 versions available

Reading Mode
Latest
Engrossed in SenateIssued December 18, 2024

118th CONGRESS

2d Session

S. 3373

AN ACT

To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.

1.

Extension of time to commence construction of certain hydropower projects

(a)

Definition of covered project

In this section, the term covered project means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020.

(b)

Authorization of extension

Notwithstanding section 13 of the Federal Power Act (16 U.S.C. 806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for an additional 4 years beyond the 8 years authorized by that section.

(c)

Period of extension

An extension of time to commence construction of a covered project under subsection (b) shall—

(1)

begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C. 806) expires; and

(2)

end on the date that is 4 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section.

(d)

Reinstatement of Expired License

If the time period required under section 13 of the Federal Power Act (16 U.S.C. 806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act—

(1)

the Federal Energy Regulatory Commission may reinstate the license for the applicable project effective as of the date of expiration of the license; and

(2)

the extension authorized under subsection (b) shall take effect on the date of that expiration.

Passed the Senate December 18 (legislative day, December 16), 2024.

Secretary