S. 5000Senate118th Congress (2023-2025)Passed Senate

A bill to provide for a memorandum of understanding to address the impacts of a certain record of decision on the Upper Colorado River Basin Fund.

Sponsored by Mike LeeSen. Mike Lee (R-UT)
Introduced September 10, 2024

AI-Generated Summary

Updated January 20, 2026 at 6:43 PM UTC

The bill directs the Interior Department’s Reclamation Commissioner and the Energy Department’s Western Area Power Administration Administrator to create a memorandum of understanding (MOU) that examines how a recent record of decision for the Glen Canyon Dam plan could affect the Upper Colorado River Basin Fund. The MOU is meant to guide actions that protect the fund’s assets, hydropower output, and the river basin’s environment, especially threatened and endangered species. It involves the Glen Canyon Dam Adaptive Management Working Group and applies to federal agencies managing water and power in the Colorado River Basin.

Key Provisions

  • The Secretary of the Interior (via the Reclamation Commissioner) and the Secretary of Energy (via the Western Area Power Administration Administrator) must enter into an MOU as soon as practicable after enactment, consulting with the Glen Canyon Dam Adaptive Management Working Group.
  • The MOU must include a plan that (1) examines how the record of decision could affect the contents of the Upper Colorado River Basin Fund, (2) analyzes longer‑term impacts on hydropower production at Glen Canyon Dam, and (3) protects the Colorado River Basin and any threatened or endangered species from invasive species and sustained drought.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

9 earlier actions
HouseFloor Latest Action

Held at the desk.

December 19, 2024 • 6:06 PM

View full timeline
SenateIntro Referral

Introduced in Senate

September 10, 2024

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources.

September 10, 2024

SenateCommittee

Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held.

September 11, 2024

SenateCommittee

Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

November 19, 2024

SenateCommittee

Committee on Energy and Natural Resources. Reported by Senator Manchin with an amendment in the nature of a substitute and an amendment to the title. Without written report.

November 21, 2024

SenateCalendars

Placed on Senate Legislative Calendar under General Orders. Calendar No. 639.

November 21, 2024

SenateFloor

Passed Senate with an amendment and an amendment to the Title by Unanimous Consent. (consideration: CR S7166; text: CR S7167)

December 18, 2024

SenateFloor

Message on Senate action sent to the House.

December 19, 2024

HouseFloor

Received in the House.

December 19, 2024 • 5:27 PM

HouseFloor

Held at the desk.

December 19, 2024 • 6:06 PM

Floor Debate

2 members

What members said about S. 5000 on the floor

2 Democrats
Cory A. Booker
Sen. Cory A. BookerD-NJ · Dec 18, 2024

Madam President, I rise today to give a speech that I have never given before. It is really important that I do it on the Senate floor, but it is like I have never done it before because I am…

Catherine Cortez Masto
Sen. Catherine Cortez MastoD-NV · Dec 18, 2024

Madam President, I want to talk about two of the bills that we just passed unanimously today, and I want to thank my colleagues for passing them through UC. They are important pieces of legislation…

Catherine Cortez Masto
Sen. Catherine Cortez MastoD-NV · Dec 18, 2024

Madam President, notwithstanding rule XXII, I ask unanimous consent that the Senate proceed to the immediate consideration of the following bills en bloc: Calendar No. 299, S. 2042; Calendar No. 280,…

Bill Text

3 versions available

Reading Mode
Latest
Engrossed in SenateIssued December 18, 2024

118th CONGRESS

2d Session

S. 5000

AN ACT

To provide for a memorandum of understanding to address the impacts of a certain record of decision on the Upper Colorado River Basin Fund.

1.

Memorandum of understanding to address potential impacts of a certain record of decision on the Upper Colorado River Basin Fund

(a)

In general

As soon as practicable after the date of enactment of this Act, the Secretary of the Interior, acting through the Commissioner of Reclamation, and the Secretary of Energy, acting through the Administrator of the Western Area Power Administration, in consultation with the Glen Canyon Dam Adaptive Management Working Group, shall enter into a memorandum of understanding to explore and address the potential impact that the record of decision entitled the Supplement to the 2016 Glen Canyon Dam Long-Term Experimental and Management Plan Record of Decision and dated July 2024 (referred to in this section as the record of decision) may have on the Upper Colorado River Basin Fund (referred to in this section as the Fund).

(b)

Required plan

The memorandum of understanding entered into under subsection (a) shall, using information derived from existing contracts, include the establishment of a plan—

(1)

to explore and address the effects that the record of decision may have on the contents of the Fund;

(2)

to analyze and address the longer-term impact that the record of decision may have on hydropower production at Glen Canyon Dam; and

(3)

to protect the Colorado River Basin and any species listed as a threatened species or an endangered species under section 4 of the Endangered Species Act of 1973 (16 U.S.C. 1533) in the Colorado River Basin from the effects of invasive species and sustained drought.

Passed the Senate December 18 (legislative day, December 16), 2024.

Secretary