H.R. 9339

Affordable Innovation for the Grid Act

Latest

IIB

119th CONGRESS

2d Session

H. R. 9339

IN THE SENATE OF THE UNITED STATES

September 16, 2026

Received; read twice and referred to the Committee on Energy and Natural Resources

AN ACT

To require the Secretary of Energy to conduct an assessment on the use of artificial intelligence and high-performance computing technologies to enhance the bulk-power system, and for other purposes.

1.

Short title

This Act may be cited as the Affordable Innovation for the Grid Act.

2.

Assessment on use of artificial intelligence and high-performance computing technologies to enhance bulk-power system

(a)

Assessment

Not later than 90 days after the date of enactment of this Act, the Secretary of Energy, in consultation with the Federal Energy Regulatory Commission and the Electric Reliability Organization, shall conduct an assessment on the use of artificial intelligence and high-performance computing technologies, including an assessment of the employment of probabilistic operating techniques by artificial intelligence and high-performance computing technologies, to enhance the capacity, reliable operation, and operational efficiency of the bulk-power system.

(b)

Matters

The assessment conducted under subsection (a) shall include an assessment of—

(1)

the potential for artificial intelligence and high-performance computing technologies to expedite generator and load interconnection studies;

(2)

the current applications, and levels of adoption, of artificial intelligence and high-performance computing technologies with respect to the operation of the bulk-power system; and

(3)

any technical, regulatory, cybersecurity, or operational limitation affecting such adoption.

(c)

Report

Not later than one year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report on the assessment conducted under subsection (a), including recommendations to—

(1)

overcome any limitation assessed under subsection (b)(3); and

(2)

facilitate the adoption and integration of artificial intelligence and high-performance computing technologies with respect to the operation of the bulk-power system.

(d)

Definitions

In this section, the terms bulk-power system, Electric Reliability Organization, and reliable operation have the meanings given those terms


in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).

Passed the House of Representatives September 15, 2026.

Kevin F. McCumber,

Clerk.