S. 1722Senate119th Congress (2025-2027)In Committee

Mission to MARS Act

Introduced May 13, 2025

AI-Generated Summary

Updated November 24, 2025 at 12:39 AM UTC

The Mission to MARS Act provides $1 billion in federal funding for the Johnson Space Center to improve and modernize its facilities and infrastructure. The money will be used for a wide range of upgrades—including training labs, mission control, utilities, and safety systems—to support both NASA and commercial partners in preparing for crewed missions beyond low‑Earth orbit. Any remaining funds can be redirected to further enhancements that enable development of suits, hardware, and other resources needed for lunar and Martian missions.

Key Provisions

  • Appropriates $1 billion to the NASA Administrator for use at Johnson Space Center, available through September 30, 2034.
  • Funds upgrades and repairs to the Neutral Buoyancy Lab for commercial space‑station training, lunar‑suit operations, and Department of Defense collaborations.
  • Provides for modernization of the Astromaterials Curation and Research facility, Mission Control Center, and Ellington Field astronaut‑training facilities.
  • Includes upgrades to utilities such as electrical switchgear, HVAC systems, chilled‑water lines, steam chillers, fire‑alarm components, and building roofs.
  • Funds construction and modernization of the space food systems laboratory, imagery laboratory, and space‑environment simulation chambers.
  • Covers asbestos mitigation, foundation repairs, and refurbishment of astronaut‑training and large‑cargo aircraft.
  • Any leftover funds after completing these projects may be used for further upgrades that support advanced spacesuits, hardware, food systems, vacuum chambers, and training for missions to low‑Earth orbit, the Moon, and Mars.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

1 earlier action
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Commerce, Science, and Transportation.

May 13, 2025

View full timeline
SenateIntro Referral

Introduced in Senate

May 13, 2025

SenateIntro Referral

Read twice and referred to the Committee on Commerce, Science, and Transportation.

May 13, 2025

Floor Debate

1 member

What members said about S. 1722 on the floor

1 Republican
Glenn Thompson
Rep. Glenn ThompsonR-PA-15 · Feb 23, 2026

Mr. Speaker, I rise today to remember a friend and dairy advocate, Arden Tewksbury, who peacefully passed away on January 30 at the age of 93. Arden graduated from Meshoppen High School in 1950. He…

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued May 13, 2025

II

119th CONGRESS

1st Session

S. 1722

IN THE SENATE OF THE UNITED STATES

May 13, 2025

Mr. Cornyn introduced the following bill; which was read twice and referred to the Committee on Commerce, Science, and Transportation

A BILL

To fund human spaceflight infrastructure and commercialization of space support at Johnson Space Center.

1.

Short title

This Act may be cited as the Mission to Modernize Astronautic Resources for Space or Mission to MARS Act.

2.

Human spaceflight infrastructure and commercialization of space support at Johnson Space Center

(a)

Appropriations

In addition to amounts otherwise available, there is appropriated to the Administrator of the National Aeronautics and Space Administration (referred to in this section as the Administrator), out of any money in the Treasury not otherwise appropriated, $1,000,000,000, to remain available until September 30, 2034, to carry out at the Johnson Space Center the following projects:

(1)

Preparation of the Neutral Buoyancy Lab for commercial space station training, lunar-suited operations, and collaborations with the Department of Defense, and general building repairs and maintenance.

(2)

Upgrades and repairs to the Astromaterials Curation and Research facility for samples from the Moon and Mars.

(3)

Modernization of the Mission Control Center and preparation for crewed missions beyond low-Earth orbit, repair or replacement of utilities, and all general building repairs and maintenance.

(4)

Upgrades and repairs to Ellington Field astronaut flight training facilities.

(5)

Electrical substation switchgear upgrades.

(6)

Heating, ventilation, and air conditioning and mechanical systems renewal for tier 1 and tier 2 facilities.

(7)

Replacement of steam chillers in building 24 (combined heat and power plant).

(8)

Deferred maintenance on fire alarm components and panels.

(9)

Foundation repairs.

(10)

Full modernization and construction of the space food systems laboratory.

(11)

Asbestos mitigation.

(12)

Upgrades to the space environment simulation laboratory located in chambers A and B in building 32.

(13)

Repair or replacement of chilled water pipe cross ties.

(14)

Roof repairs and replacements.

(15)

Modernization of the imagery laboratory in building 8.

(16)

Repair and replacement of chilled water lines to the Mission Control Center.

(17)

Repair and refurbishment of astronaut training aircraft.

(18)

Repair, refurbishment, or replacement of large volume cargo transportation aircraft.

(b)

Remaining funds

Any funds remaining after the projects described in subsection (a) are completed shall be used to upgrade facilities or infrastructure that would enable the National Aeronautics and Space Administration and commercial entities to develop advanced spacesuits, hardware, food systems, vacuum chambers, and simulations to train for missions to low-Earth orbit, the Moon, and Mars, as determined by the Administrator.