The Quantum‑GUARD Act directs the Federal Energy Regulatory Commission (FERC) to evaluate cybersecurity threats posed by quantum computers when it reviews or issues reliability standards for the bulk‑power grid, and to consider using post‑quantum cryptography (PQC) to protect those systems. It also requires the Department of Energy to set up a “PQC sandbox” for testing and collaboration on PQC solutions, and to conduct a study and report on quantum‑related risks and recommendations. The bill mainly affects electric‑grid operators, FERC, the Energy Secretary, and related federal and state agencies.

Key Provisions

  • FERC must consider quantum‑computer cyber risks and potential PQC use when reviewing or modifying reliability standards for the bulk‑power system, and take appropriate actions.
  • Within one year, the Secretary of Energy must establish a PQC sandbox that brings together grid operators, IT/OT vendors, federal agencies, and other stakeholders to develop and test post‑quantum cryptography for the electric grid.
  • Within three years, the Secretary must publish a report on the sandbox’s outcomes and recommendations to promote PQC adoption by bulk‑power system operators.
  • The Secretary, in consultation with the Electric Reliability Organization, must study quantum‑related cyber risks to IT and OT systems, identify obstacles to moving high‑value systems to PQC, and submit a report to Congress within one year, with an unclassified version made public.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

1 earlier action
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Energy and Natural Resources.

August 6, 2026

View full timeline
SenateIntro Referral

Introduced in Senate

August 6, 2026

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources.

August 6, 2026

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued August 6, 2026

II

119th CONGRESS

2d Session

S. 5313

IN THE SENATE OF THE UNITED STATES

August 6, 2026

Mr. Coons (for himself and Mr. Rounds) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

A BILL

To require the Federal Energy Regulatory Commission to consider cybersecurity risks from quantum computers, and for other purposes.

1.

Short title

This Act may be cited as the Quantum Grid Utility Assurance and Resilient Defense Act of 2026 or the Quantum-GUARD Act of 2026.

2.

Definitions

In this Act:

(1)

Bulk-power system

The term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).

(2)

Commission

The term Commission means the Federal Energy Regulatory Commission.

(3)

Electric Reliability Organization

The term Electric Reliability Organization has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).

(4)

High-value

The term high-value, with respect to an IT or OT system, means that the system is so critical to an organization that the loss or corruption of information within the system or loss of access to the system would have serious impacts on the ability of the organization to perform its mission or conduct business.

(5)

Information technology; IT

(A)

In general

The term information technology or IT means any equipment or interconnected system or subsystem of equipment used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information.

(B)

Inclusions

The term information technology or IT includes, at a minimum, computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources.

(6)

Operational technology; OT

(A)

In general

The term operational technology or OT means any programmable system or device that—

(i)

interacts with the physical environment (or manages devices that interact with the physical environment); and

(ii)

detects or causes a direct change through the monitoring or control of devices, processes, or events.

(B)

Inclusions

The term operational technology or OT includes, at a minimum, industrial control systems, building management systems, fire control systems, and physical access control mechanisms.

(7)

Post-quantum cryptography; PQC

The term post-quantum cryptography or PQC means cryptographic algorithms or methods that are assessed not to be specifically vulnerable to attack by any of—

(A)

a quantum computer (as defined in section 3 of the Quantum Computing Cybersecurity Preparedness Act (6 U.S.C. 1526 note; Public Law 117–260)); or

(B)

a classical computer (as defined in that section).

(8)

PQC sandbox

The term PQC sandbox means a program for innovation and development with respect to the use of post-quantum cryptography in IT and OT applications for the electric grid that—

(A)

assembles relevant stakeholders, which may include operators of the bulk-power system, IT and OT vendors, relevant Federal agencies, relevant State and local organizations, and distribution utilities (as defined in section 217(a) of the Federal Power Act (16 U.S.C. 824q(a)));

(B)

addresses challenges in PQC cybersecurity development and adoption;

(C)

prioritizes activities that support, encourage, or enable PQC integration into—

(i)

existing systems; and

(ii)

during the 5-year period beginning on the date of enactment of this Act, systems that are expected to be deployed within that 5-year period;

(D)

may include briefings, workshops, software challenges, hardware modeling, grid simulations, or red-teaming exercises; and

(E)

may be used to develop and test demonstrations, proofs of concept, interoperability between IT and OT systems, and pilot applications.

(9)

Reliability standard

The term reliability standard has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).

(10)

Secretary

The term Secretary means the Secretary of Energy, acting through the Office of Cybersecurity, Energy Security, and Emergency Response.

3.

FERC consideration of cybersecurity risks from quantum computers

Beginning on the date of enactment of this Act, in reviewing a proposed reliability standard, or a proposed modification to a reliability standard, under section 215 of the Federal Power Act (16 U.S.C. 824o) or issuing an order under subsection (d)(5) of that section, the Commission shall—

(1)

consider—

(A)

cybersecurity risks from quantum computers; and

(B)

potential uses of post-quantum cryptography in IT and OT systems to protect against those risks; and

(2)

take such action the Commission determines to be appropriate based on that consideration.

4.

DOE PQC sandbox

(a)

In general

Not later than 1 year after the date of enactment of this Act, the Secretary shall establish a PQC sandbox.

(b)

Collaboration

In establishing and maintaining the PQC sandbox under subsection (a), the Secretary may collaborate, as appropriate, with appropriate officials at other Federal agencies.

(c)

Outreach

Not later than 3 years after the date of enactment of this Act, the Secretary shall publish a report describing the outcomes of, and recommendations arising from, PQC sandbox activities, to encourage PQC adoption by operators of the bulk-power system.

5.

PQC report

(a)

Study

The Secretary, in consultation with the Electric Reliability Organization and other appropriate organizations, shall conduct a study of cybersecurity risks to the bulk-power system from quantum computers, including, at minimum—

(1)

risks to IT and OT systems; and

(2)

obstacles to transitioning high-value IT and OT systems to PQC.

(b)

Requirements

In conducting the study under subsection (a), the Secretary shall—

(1)

develop recommendations for actions that the Commission could take to ensure reliable operations of the bulk-power system; and

(2)

to the extent practicable, correlate the high-value IT and OT systems considered in the study with appropriate categories based on reliability standards, such as impact categories relating to the Bulk Electric System (as defined by the Electric Reliability Organization), so the results of the study may be readily applied by the Electric Reliability Organization.

(c)

Report

(1)

In general

Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Energy and Commerce of the House of Representatives a report on the study required under subsection (a).

(2)

Form

The report required under paragraph (1) shall be in unclassified form, but may include a classified annex.

(3)

Public availability

The Secretary shall make available to the public the unclassified portion of the report required under paragraph (1).