S. 512Senate115th Congress (2017-2019)Enacted

Nuclear Energy Innovation and Modernization Act

Introduced March 2, 2017

AI-Generated Summary

Updated April 15, 2026 at 1:40 PM UTC

The Nuclear Energy Innovation and Modernization Act updates how the Nuclear Regulatory Commission (NRC) funds its work and speeds up licensing for next‑generation nuclear reactors. It creates new fee rules, launches programs to develop advanced reactor designs, and adds reporting requirements on safety, community engagement, and uranium recovery.

Key Provisions

  • Changes NRC user‑fee formulas for FY 2021 onward, setting caps on corporate support costs and allowing fees that match the agency’s budget, with certain activities (e.g., waste fund, homeland security) excluded until 2031.
  • Establishes an advanced nuclear reactor program that requires the NRC to create staged licensing processes, use risk‑informed and performance‑based reviews, develop a technology‑inclusive regulatory framework by end‑2027, and fund the effort with $14.42 million per year through 2024.
  • Mandates the NRC to produce several reports: on baffle‑former bolt guidance, evacuation lessons from past disasters, accident‑tolerant fuel licensing, best practices for local community advisory boards, and study recommendations on internal NRC concerns.
  • Encourages private investment in research and test reactors by allowing licenses that let owners recover up to 75 % of operating costs through sales of energy or services.
  • Creates a uranium‑recovery reporting requirement and a pilot program to test a flat‑fee structure for routine uranium licensing matters.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

23 earlier actions
Became Law Latest Action

Became Public Law No: 115-439.

January 14, 2019

View full timeline
SenateIntro Referral

Introduced in Senate

March 2, 2017

SenateIntro Referral

Read twice and referred to the Committee on Environment and Public Works.

March 2, 2017

SenateCommittee

Committee on Environment and Public Works. Hearings held. Hearings printed: S.Hrg. 115-52.

March 8, 2017

SenateCommittee

Committee on Environment and Public Works. Ordered to be reported with an amendment in the nature of a substitute favorably.

March 22, 2017

SenateCommittee

Committee on Environment and Public Works. Reported by Senator Barrasso with an amendment in the nature of a substitute. With written report No. 115-86. Additional views filed.

May 25, 2017

SenateCalendars

Placed on Senate Legislative Calendar under General Orders. Calendar No. 108.

May 25, 2017

SenateFloor

An errata sheet on written report number No. 115-86 was printed.

May 25, 2017

SenateFloor

Measure laid before Senate by unanimous consent.

December 20, 2018

SenateFloor

The committee substitute withdrawn by Unanimous Consent.

December 20, 2018

SenateFloor

Passed Senate with an amendment by Voice Vote. (consideration: CR S7957-7962; text: CR S7962)

December 20, 2018

HouseFloor

Received in the House.

December 20, 2018 • 12:42 PM

SenateFloor

Message on Senate action sent to the House.

December 20, 2018

HouseFloor

Held at the desk.

December 20, 2018 • 8:30 PM

HouseFloor

Mr. Kinzinger moved to suspend the rules and pass the bill.

December 21, 2018 • 11:10 AM

HouseFloor

Considered under suspension of the rules. (consideration: CR H10553-10558)

December 21, 2018 • 11:11 AM

HouseFloor

DEBATE - The House proceeded with forty minutes of debate on S. 512.

December 21, 2018 • 11:11 AM

HouseFloor

At the conclusion of debate, the Yeas and Nays were demanded and ordered. Pursuant to the provisions of clause 8, rule XX, the Chair announced that further proceedings on the motion would be postponed.

December 21, 2018 • 11:19 AM

HouseFloor

Considered as unfinished business. (consideration: CR H10577-10578)

December 21, 2018 • 4:44 PM

SenateFloor

Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 361 - 10 (Roll no. 493).(text: CR H10553-10557)

December 21, 2018 • 4:47 PM

HouseFloor

On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 361 - 10 (Roll no. 493). (text: CR H10553-10557)

December 21, 2018 • 4:47 PM

HouseFloor

Motion to reconsider laid on the table Agreed to without objection.

December 21, 2018 • 4:47 PM

President

Presented to President.

January 2, 2019

Became Law

Signed by President.

January 14, 2019

Became Law

Became Public Law No: 115-439.

January 14, 2019

Floor Debate

19 members

What members said about S. 512 on the floor

12 Republicans7 Democrats
Lisa Murkowski
Sen. Lisa MurkowskiR-AK · Mar 7, 2017

Mr. President, I am pleased the Senate is at the point we are this morning. Last night, we agreed to proceed to consideration of H.J. Res. 44, which will overturn the Bureau of Land Management's…

Maria Cantwell
Sen. Maria CantwellD-WA · Mar 7, 2017

Madam President, I come to the floor to speak in opposition to this resolution. Many of my colleagues know that we have had discussions in the Senate on several Congressional Review Act resolutions.…

John Cornyn
Sen. John CornynR-TX · Mar 7, 2017

Mr. President, yesterday the House of Representatives released a way forward to dismantle and replace ObamaCare, which will be to deliver on one of our biggest campaign promises made to the American…

Cory Gardner
Sen. Cory GardnerR-CO · Mar 7, 2017

Mr. President, I know the Presiding Officer is a fellow westerner, from a State that is impacted by decisions made by our public lands management agencies, whether that is the Bureau of Land…

John Barrasso
Sen. John BarrassoR-WY · Mar 7, 2017

Mr. President, I ask unanimous consent that the order for the quorum call be rescinded. Mr. President, I rise today to speak about bipartisan legislation designed to strengthen our Nation's nuclear…

Show 8 more
Darrell Issa
Rep. Darrell IssaR-CA-49 · Dec 21, 2018

Mr. Speaker, I want to thank the Energy and Commerce Committee for giving me an opportunity to, one, speak in support of this bill; and, two, take just a couple of minutes to say what is wrong with…

John Hoeven
Sen. John HoevenR-ND · Mar 7, 2017

Mr. President, I ask unanimous consent to speak as in morning business. Mr. President, the Bureau of Land Management has a mission set by Congress; that is, to manage the Nation's public lands under…

Steve Daines
Sen. Steve DainesR-MT · Mar 7, 2017

Mr. President, the people spoke loudly last fall. For too long, the Obama administration ignored the common sense of those who managed the lands and our natural resources. Now is the time for that…

John Barrasso
Sen. John BarrassoR-WY · May 24, 2018

Mr. President, I rise today to congratulate Annie Caputo and David Wright on their confirmation as members of the Nuclear Regulatory Commission. Regrettably, it has taken almost a year for the Senate…

Patty Murray
Sen. Patty MurrayD-WA · Mar 7, 2017

Mr. President, I come to the floor to take a few minutes to address the deeply harmful bill House Republicans announced yesterday to be put in place, TrumpCare. Since the election, I have had…

Earl Blumenauer
Rep. Earl BlumenauerD-OR-3 · Dec 21, 2018

Mr. Speaker, had I been present for the vote today on the enrollment correction to H.R. 4174, the Foundations for Evidence- Based Policymaking Act of 2017 (Roll no. 483), I would have voted ``aye.''…

Adam Kinzinger
Rep. Adam KinzingerR-IL-16 · Dec 21, 2018

Mr. Speaker, I move to suspend the rules and pass the bill (S. 512) to modernize the regulation of nuclear energy. Mr. Speaker, I ask unanimous consent that all Members may have 5 legislative days in…

Michael F. Doyle
Rep. Michael F. DoyleD-PA-14 · Dec 21, 2018

Mr. Speaker, I yield myself such time as I may consume. Mr. Speaker, I appreciate the opportunity to speak about S. 512, the Nuclear Energy Innovation and Modernization Act. This legislation contains…

Show 9 more
Anna G. Eshoo
Rep. Anna G. EshooD-CA-18 · Dec 21, 2018

Mr. Speaker, I was unable to be present during roll call vote number 483, 484, 485, 486, 487, 488, 489, 490, 491, 492, 493, 494, 495, 496, 497, 498, 499, and 500 on December 21, 2018, due to a death…

Elijah E. Cummings
Rep. Elijah E. CummingsD-MD-7 · Dec 21, 2018

Mr. Speaker, I yield myself such time as I may consume. Mr. Speaker, the resolution before us would change the enrollment of H.R. 4174 to make several corrections to the bill. Concerns were raised…

Paul Mitchell
Rep. Paul MitchellR-MI-10 · Dec 21, 2018

Mr. Speaker, I move to suspend the rules and agree to the concurrent resolution (H. Con. Res. 149) directing the Clerk of the House of Representatives to make certain corrections in the enrollment of…

Dan Sullivan
Sen. Dan SullivanR-AK · Dec 20, 2018

Mr. President, I ask unanimous consent that the Senate proceed to the immediate consideration of Calendar No. 108, S. 512. I ask unanimous consent that the committee-reported substitute amendment be…

John Barrasso
Sen. John BarrassoR-WY · Jun 20, 2017

Mr. President, in compliance with paragraph 11(a) of rule XXVI of the Standing Rules of the Senate, the Committee on Environment and Public Works has obtained from the Congressional Budget Office an…

Jim Costa
Rep. Jim CostaD-CA-16 · Dec 21, 2018

Mr. Speaker, due to unforeseen circumstances, I was unable to be in attendance for Roll Call Vote No. 500. Had I been present I would have voted YES.

Ann Wagner
Rep. Ann WagnerR-MO-2 · Dec 21, 2018

Mr. Speaker, I was unavoidably detained. Had I been present, I would have voted ``yea'' on rollcall No. 500. personal explanation

Thomas Massie
Rep. Thomas MassieR-KY-4 · Dec 21, 2018

Mr. Speaker, on that I demand the yeas and nays.

Thomas Massie
Rep. Thomas MassieR-KY-4 · Dec 21, 2018

Mr. Speaker, on that I demand the yeas and nays.

Bill Text

5 versions available

Reading Mode
Latest
Enrolled BillPublication date not provided

One Hundred Fifteenth Congress of the United States of America

2d Session

Begun and held at the City of Washington on Wednesday, the third day of January, two thousand and eighteen

S. 512

AN ACT

To modernize the regulation of nuclear energy.

1.

Short title; table of contents

(a)

Short title

This Act may be cited as the Nuclear Energy Innovation and Modernization Act.

(b)

Table of contents

The table of contents for this Act is as follows:

Sec. 1. Short title; table of contents.

Sec. 2. Purpose.

Sec. 3. Definitions.

TITLE I—Advanced Nuclear Reactors and User Fees

Sec. 101. Nuclear Regulatory Commission user fees and annual charges through fiscal year 2020.

Sec. 102. Nuclear Regulatory Commission user fees and annual charges for fiscal year 2021 and each fiscal year thereafter.

Sec. 103. Advanced nuclear reactor program.

Sec. 104. Baffle-former bolt guidance.

Sec. 105. Evacuation report.

Sec. 106. Encouraging private investment in research and test reactors.

Sec. 107. Commission report on accident tolerant fuel.

Sec. 108. Report identifying best practices for establishment and operation of local community advisory boards.

Sec. 109. Report on study recommendations.

TITLE II—Uranium

Sec. 201. Uranium recovery report.

Sec. 202. Pilot program for uranium recovery fees.

2.

Purpose

The purpose of this Act is to provide—

(1)

a program to develop the expertise and regulatory processes necessary to allow innovation and the commercialization of advanced nuclear reactors;

(2)

a revised fee recovery structure to ensure the availability of resources to meet industry needs without burdening existing licensees unfairly for inaccurate workload projections or premature existing reactor closures; and

(3)

more efficient regulation of uranium recovery.

3.

Definitions

In this Act:

(1)

Advanced nuclear reactor

The term advanced nuclear reactor means a nuclear fission or fusion reactor, including a prototype plant (as defined in sections 50.2 and 52.1 of title 10, Code of Federal Regulations (as in effect on the date of enactment of this Act)), with significant improvements compared to commercial nuclear reactors under construction as of the date of enactment of this Act, including improvements such as—

(A)

additional inherent safety features;

(B)

significantly lower levelized cost of electricity;

(C)

lower waste yields;

(D)

greater fuel utilization;

(E)

enhanced reliability;

(F)

increased proliferation resistance;

(G)

increased thermal efficiency; or

(H)

ability to integrate into electric and nonelectric applications.

(2)

Advanced nuclear reactor fuel

The term advanced nuclear reactor fuel means fuel for use in an advanced nuclear reactor or a research and test reactor, including fuel with a low uranium enrichment level of not greater than 20 percent.

(3)

Agreement State

The term Agreement State means any State with which the Commission has entered into an effective agreement under section 274 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2021(b)).

(4)

Appropriate congressional committees

The term appropriate congressional committees means the Committee on Environment and Public Works of the Senate and the Committee on Energy and Commerce of the House of Representatives.

(5)

Commission

The term Commission means the Nuclear Regulatory Commission.

(6)

Conceptual design assessment

The term conceptual design assessment means an early-stage review by the Commission that—

(A)

assesses preliminary design information for consistency with applicable regulatory requirements of the Commission;

(B)

is performed on a set of topic areas agreed to in the licensing project plan; and

(C)

is performed at a cost and schedule agreed to in the licensing project plan.

(7)

Corporate support costs

The term corporate support costs means expenditures for acquisitions, administrative services, financial management, human resource management, information management, information technology, policy support, outreach, and training, as those categories are described and calculated in Appendix A of the Congressional Budget Justification for Fiscal Year 2018 of the Commission.

(8)

Licensing project plan

The term licensing project plan means a plan that describes—

(A)

the interactions between an applicant and the Commission; and

(B)

project schedules and deliverables in specific detail to support long-range resource planning undertaken by the Commission and an applicant.

(9)

Regulatory framework

The term regulatory framework means the framework for reviewing requests for certifications, permits, approvals, and licenses for nuclear reactors.

(10)

Requested activity of the Commission

The term requested activity of the Commission means—

(A)

the processing of applications for—

(i)

design certifications or approvals;

(ii)

licenses;

(iii)

permits;

(iv)

license amendments;

(v)

license renewals;

(vi)

certificates of compliance; and

(vii)

power uprates; and

(B)

any other activity requested by a licensee or applicant.

(11)

Research and test reactor

(A)

In general

The term research and test reactor means a reactor that—

(i)

falls within the licensing and related regulatory authority of the Commission under section 202 of the Energy Reorganization Act of 1974 (42 U.S.C. 5842); and

(ii)

is useful in the conduct of research and development activities as licensed under section 104 c. of the Atomic Energy Act (42 U.S.C. 2134(c)).

(B)

Exclusion

The term research and test reactor does not include a commercial nuclear reactor.

(12)

Secretary

The term Secretary means the Secretary of Energy.

(13)

Standard design approval

The term standard design approval means the approval of a final standard design or a major portion of a final design standard as described in subpart E of part 52 of title 10, Code of Federal Regulations (as in effect on the date of enactment of this Act).

(14)

Technology-inclusive regulatory framework

The term technology-inclusive regulatory framework means a regulatory framework developed using methods of evaluation that are flexible and practicable for application to a variety of reactor technologies, including, where appropriate, the use of risk-informed and performance-based techniques and other tools and methods.

(15)

Topical report

The term topical report means a document submitted to the Commission that addresses a technical topic related to nuclear reactor safety or design.

I

Advanced Nuclear Reactors and User Fees

101.

Nuclear Regulatory Commission user fees and annual charges through fiscal year 2020

(a)

In general

Section 6101(c)(2)(A) of the Omnibus Budget Reconciliation Act of 1990 (42 U.S.C. 2214(c)(2)(A)) is amended—

(1)

in clause (iii), by striking and at the end;

(2)

in clause (iv), by striking the period at the end and inserting ; and; and

(3)

by adding at the end the following:

(v)

amounts appropriated to the Commission for the fiscal year for activities related to the development of regulatory infrastructure for advanced nuclear reactor technologies, including activities required under section 103 of the Nuclear Energy Innovation and Modernization Act.

.

(b)

Repeal

Effective October 1, 2020, section 6101 of the Omnibus Budget Reconciliation Act of 1990 (42 U.S.C. 2214) is repealed.

102.

Nuclear Regulatory Commission user fees and annual charges for fiscal year 2021 and each fiscal year thereafter

(a)

Annual budget justification

(1)

In general

In the annual budget justification submitted by the Commission to Congress, the Commission shall expressly identify anticipated expenditures necessary for completion of the requested activities of the Commission anticipated to occur during the applicable fiscal year.

(2)

Restriction

Budget authority granted to the Commission for purposes of the requested activities of the Commission shall be used, to the maximum extent practicable, solely for conducting requested activities of the Commission.

(3)

Limitation on corporate support costs

With respect to the annual budget justification submitted to Congress, corporate support costs, to the maximum extent practicable, shall not exceed the following percentages of the total budget authority of the Commission requested in the annual budget justification:

(A)

30 percent for each of fiscal years 2021 and 2022.

(B)

29 percent for each of fiscal years 2023 and 2024.

(C)

28 percent for fiscal year 2025 and each fiscal year thereafter.

(b)

Fees and charges

(1)

Annual assessment

(A)

In general

Each fiscal year, the Commission shall assess and collect fees and charges in accordance with paragraphs (2) and (3) in a manner that ensures that, to the maximum extent practicable, the amount assessed and collected is equal to an amount that approximates—

(i)

the total budget authority of the Commission for that fiscal year; less

(ii)

the budget authority of the Commission for the activities described in subparagraph (B).

(B)

Excluded activities described

The activities referred to in subparagraph (A)(ii) are the following:

(i)

Any fee relief activity, as identified by the Commission.

(ii)

Amounts appropriated for a fiscal year to the Commission—

(I)

from the Nuclear Waste Fund established under section 302(c) of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10222(c));

(II)

for implementation of section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (50 U.S.C. 2601 note; Public Law 108–375);

(III)

for the homeland security activities of the Commission (other than for the costs of fingerprinting and background checks required under section 149 of the Atomic Energy Act of 1954 (42 U.S.C. 2169) and the costs of conducting security inspections);

(IV)

for the Inspector General services of the Commission provided to the Defense Nuclear Facilities Safety Board;

(V)

for research and development at universities in areas relevant to the mission of the Commission; and

(VI)

for a nuclear science and engineering grant program that will support multiyear projects that do not align with programmatic missions but are critical to maintaining the discipline of nuclear science and engineering.

(iii)

Costs for activities related to the development of regulatory infrastructure for advanced nuclear reactor technologies, including activities required under section 103.

(C)

Exception

The exclusion described in subparagraph (B)(iii) shall cease to be effective on January 1, 2031.

(D)

Report

Not later than December 31, 2029, the Commission shall submit to the Committee on Appropriations and the Committee on Environment and Public Works of the Senate and the Committee on Appropriations and the Committee on Energy and Commerce of the House of Representatives a report describing the views of the Commission on the continued appropriateness and necessity of the funding described in subparagraph (B)(iii).

(2)

Fees for service or thing of value

In accordance with section 9701 of title 31, United States Code, the Commission shall assess and collect fees from any person who receives a service or thing of value from the Commission to cover the costs to the Commission of providing the service or thing of value.

(3)

Annual charges

(A)

In general

Subject to subparagraph (B) and except as provided in subparagraph (D), the Commission may charge to any licensee or certificate holder of the Commission an annual charge in addition to the fees assessed and collected under paragraph (2).

(B)

Cap on annual charges of certain licensees

(i)

Operating reactors

The annual charge under subparagraph (A) charged to an operating reactor licensee, to the maximum extent practicable, shall not exceed the annual fee amount per operating reactor licensee established in the final rule of the Commission entitled Revision of Fee Schedules; Fee Recovery for Fiscal Year 2015 (80 Fed. Reg. 37432 (June 30, 2015)), as may be adjusted annually by the Commission to reflect changes in the Consumer Price Index published by the Bureau of Labor Statistics of the Department of Labor.

(ii)

Waiver

The Commission may waive, for a period of 1 year, the cap on annual charges described in clause (i) if the Commission submits to the Committee on Appropriations and the Committee on Environment and Public Works of the Senate and the Committee on Appropriations and the Committee on Energy and Commerce of the House of Representatives a written determination that the cap on annual charges may compromise the safety and security mission of the Commission.

(C)

Amount per licensee

(i)

In general

The Commission shall establish by rule a schedule of annual charges fairly and equitably allocating the aggregate amount of charges described in subparagraph (A) among licensees and certificate holders.

(ii)

Requirement

The schedule of annual charges under clause (i)—

(I)

to the maximum extent practicable, shall be reasonably related to the cost of providing regulatory services; and

(II)

may be based on the allocation of the resources of the Commission among licensees or certificate holders or classes of licensees or certificate holders.

(D)

Exemption

(i)

Definition of research reactor

In this subparagraph, the term research reactor means a nuclear reactor that—

(I)

is licensed by the Commission under section 104 c. of the Atomic Energy Act of 1954 (42 U.S.C. 2134(c)) for operation at a thermal power level of not more than 10 megawatts; and

(II)

if licensed under subclause (I) for operation at a thermal power level of more than 1 megawatt, does not contain—

(aa)

a circulating loop through the core in which the licensee conducts fuel experiments;

(bb)

a liquid fuel loading; or

(cc)

an experimental facility in the core in excess of 16 square inches in cross-section.

(ii)

Exemption

Subparagraph (A) shall not apply to the holder of any license for a federally owned research reactor used primarily for educational training and academic research purposes.

(c)

Performance and reporting

(1)

In general

Not later than 180 days after the date of enactment of this Act, the Commission shall develop for the requested activities of the Commission—

(A)

performance metrics; and

(B)

milestone schedules.

(2)

Delays in issuance of final safety evaluation

The Executive Director for Operations of the Commission shall inform the Commission of a delay in issuance of the final safety evaluation for a requested activity of the Commission by the completion date required by the performance metrics or milestone schedule under paragraph (1) by not later than 30 days after the completion date.

(3)

Delays in Issuance of final safety evaluation exceeding 180 days

If the final safety evaluation for the requested activity of the Commission described in paragraph (2) is not completed by the date that is 180 days after the completion date required by the performance metrics or milestone schedule under paragraph (1), the Commission shall submit to the appropriate congressional committees a timely report describing the delay, including a detailed explanation accounting for the delay and a plan for timely completion of the final safety evaluation.

(d)

Accurate invoicing

With respect to invoices for fees described in subsection (b)(2), the Commission shall—

(1)

ensure appropriate review and approval prior to the issuance of invoices;

(2)

develop and implement processes to audit invoices to ensure accuracy, transparency, and fairness; and

(3)

modify regulations to ensure fair and appropriate processes to provide licensees and applicants an opportunity to efficiently dispute or otherwise seek review and correction of errors in invoices for those fees.

(e)

Report

Not later than September 30, 2021, the Commission shall submit to the Committee on Appropriations and the Committee on Environment and Public Works of the Senate and the Committee on Appropriations and the Committee on Energy and Commerce of the House of Representatives a report describing the implementation of this section, including any impacts and recommendations for improvement.

(f)

Effective date

Except as provided in subsection (c), this section takes effect on October 1, 2020.

103.

Advanced nuclear reactor program

(a)

Licensing

(1)

Staged licensing

For the purpose of predictable, efficient, and timely reviews, not later than 270 days after the date of enactment of this Act, the Commission shall develop and implement, within the existing regulatory framework, strategies for—

(A)

establishing stages in the licensing process for commercial advanced nuclear reactors; and

(B)

developing procedures and processes for—

(i)

using a licensing project plan; and

(ii)

optional use of a conceptual design assessment.

(2)

Risk-informed licensing

Not later than 2 years after the date of enactment of this Act, the Commission shall develop and implement, where appropriate, strategies for the increased use of risk-informed, performance-based licensing evaluation techniques and guidance for commercial advanced nuclear reactors within the existing regulatory framework, including evaluation techniques and guidance for the resolution of the following:

(A)

Applicable policy issues identified during the course of review by the Commission of a commercial advanced nuclear reactor licensing application.

(B)

The issues described in SECY–93–092 and SECY–15–077, including—

(i)

licensing basis event selection and evaluation;

(ii)

source terms;

(iii)

containment performance; and

(iv)

emergency preparedness.

(3)

Research and test reactor licensing

For the purpose of predictable, efficient, and timely reviews, not later than 2 years after the date of enactment of this Act, the Commission shall develop and implement strategies within the existing regulatory framework for licensing research and test reactors, including the issuance of guidance.

(4)

Technology-inclusive regulatory framework

Not later than December 31, 2027, the Commission shall complete a rulemaking to establish a technology-inclusive, regulatory framework for optional use by commercial advanced nuclear reactor applicants for new reactor license applications.

(5)

Training and expertise

As soon as practicable after the date of enactment of this Act, the Commission shall provide for staff training or the hiring of experts, as necessary—

(A)

to support the activities described in paragraphs (1) through (4); and

(B)

to support preparations—

(i)

to conduct pre-application interactions; and

(ii)

to review commercial advanced nuclear reactor license applications.

(6)

Authorization of appropriations

There is authorized to be appropriated to the Commission to carry out this subsection $14,420,000 for each of fiscal years 2020 through 2024.

(b)

Report To establish stages in the commercial advanced nuclear reactor licensing process

(1)

Report required

Not later than 180 days after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees a report for expediting and establishing stages in the licensing process for commercial advanced nuclear reactors that will allow implementation of the licensing process by not later than 2 years after the date of enactment of this Act (referred to in this subsection as the report).

(2)

Coordination and stakeholder input

In developing the report, the Commission shall seek input from the Secretary, the nuclear energy industry, a diverse set of technology developers, and other public stakeholders.

(3)

Cost and schedule estimates

The report shall include proposed cost estimates, budgets, and timeframes for implementing strategies to establish stages in the licensing process for commercial advanced nuclear reactor technologies.

(4)

Required evaluations

Consistent with the role of the Commission in protecting public health and safety and common defense and security, the report shall evaluate—

(A)
(i)

the unique aspects of commercial advanced nuclear reactor licensing, including the use of alternative coolants, operation at or near atmospheric pressure, and the use of passive safety strategies;

(ii)

strategies for the qualification of advanced nuclear reactor fuel, including the use of computer modeling and simulation and experimental validation; and

(iii)

for the purposes of predictable, efficient, and timely reviews, any associated legal, regulatory, and policy issues the Commission should address with regard to the licensing of commercial advanced nuclear reactor technologies;

(B)

options for licensing commercial advanced nuclear reactors under the regulations of the Commission contained in title 10, Code of Federal Regulations (as in effect on the date of enactment of this Act), including—

(i)

the development and use under the regulatory framework of the Commission in effect on the date of enactment of this Act of a licensing project plan that could establish—

(I)

milestones that—

(aa)

correspond to stages of a licensing process for the specific situation of a commercial advanced nuclear reactor project; and

(bb)

use knowledge of the ability of the Commission to review certain design aspects; and

(II)

guidelines defining the roles and responsibilities between the Commission and the applicant at the onset of the interaction—

(aa)

to provide the foundation for effective communication and effective project management; and

(bb)

to ensure efficient progress;

(ii)

the use of topical reports, standard design approval, and other appropriate mechanisms as tools to introduce stages into the commercial advanced nuclear reactor licensing process, including how the licensing project plan might structure the use of those mechanisms;

(iii)

collaboration with standards-setting organizations to identify specific technical areas for which new or updated standards are needed and providing assistance if appropriate to ensure the new or updated standards are developed and finalized in a timely fashion;

(iv)

the incorporation of consensus-based codes and standards developed under clause (iii) into the regulatory framework—

(I)

to provide predictability for the regulatory processes of the Commission; and

(II)

to ensure timely completion of specific licensing actions;

(v)

the development of a process for, and the use of, conceptual design assessments; and

(vi)

identification of any policies and guidance for staff that will be needed to implement clauses (i) and (ii);

(C)

options for improving the efficiency, timeliness, and cost-effectiveness of licensing reviews of commercial advanced nuclear reactors, including opportunities to minimize the delays that may result from any necessary amendment or supplement to an application;

(D)

options for improving the predictability of the commercial advanced nuclear reactor licensing process, including the evaluation of opportunities to improve the process by which application review milestones are established and met; and

(E)

the extent to which Commission action or modification of policy is needed to implement any part of the report.

(c)

Report To increase the use of risk-Informed and performance-Based evaluation techniques and regulatory guidance

(1)

Report required

Not later than 180 days after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees a report for increasing, where appropriate, the use of risk-informed and performance-based evaluation techniques and regulatory guidance in licensing commercial advanced nuclear reactors within the existing regulatory framework (referred to in this subsection as the report).

(2)

Coordination and stakeholder input

In developing the report, the Commission shall seek input from the Secretary, the nuclear energy industry, technology developers, and other public stakeholders.

(3)

Cost and schedule estimate

The report shall include proposed cost estimates, budgets, and timeframes for implementing a strategy to increase the use of risk-informed and performance-based evaluation techniques and regulatory guidance in licensing commercial advanced nuclear reactors.

(4)

Required evaluations

Consistent with the role of the Commission in protecting public health and safety and common defense and security, the report shall evaluate—

(A)

the ability of the Commission to develop and implement, where appropriate, risk-informed and performance-based licensing evaluation techniques and guidance for commercial advanced nuclear reactors within existing regulatory frameworks not later than 2 years after the date of enactment of this Act, including policies and guidance for the resolution of—

(i)

issues relating to—

(I)

licensing basis event selection and evaluation;

(II)

use of mechanistic source terms;

(III)

containment performance;

(IV)

emergency preparedness; and

(V)

the qualification of advanced nuclear reactor fuel; and

(ii)

other policy issues previously identified; and

(B)

the extent to which Commission action is needed to implement any part of the report.

(d)

Report To prepare the research and test reactor licensing process

(1)

Report required

Not later than 1 year after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees a report for preparing the licensing process for research and test reactors within the existing regulatory framework (referred to in this subsection as the report).

(2)

Coordination and stakeholder input

In developing the report, the Commission shall seek input from the Secretary, the nuclear energy industry, a diverse set of technology developers, and other public stakeholders.

(3)

Cost and schedule estimates

The report shall include proposed cost estimates, budgets, and timeframes for preparing the licensing process for research and test reactors.

(4)

Required evaluations

Consistent with the role of the Commission in protecting public health and safety and common defense and security, the report shall evaluate—

(A)

the unique aspects of research and test reactor licensing and any associated legal, regulatory, and policy issues the Commission should address to prepare the licensing process for research and test reactors;

(B)

the feasibility of developing guidelines for advanced reactor demonstrations and prototypes to support the review process for advanced reactors designs, including designs that use alternative coolants or alternative fuels, operate at or near atmospheric pressure, and use passive safety strategies; and

(C)

the extent to which Commission action or modification of policy is needed to implement any part of the report.

(e)

Report To complete a rulemaking To establish a technology-Inclusive regulatory framework for optional use by commercial advanced nuclear reactor technologies in new reactor license applications and To enhance Commission expertise relating to advanced nuclear reactor technologies

(1)

Report required

Not later than 30 months after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees a report (referred to in this subsection as the report) for—

(A)

completing a rulemaking to establish a technology-inclusive regulatory framework for optional use by applicants in licensing commercial advanced nuclear reactor technologies in new reactor license applications; and

(B)

ensuring that the Commission has adequate expertise, modeling, and simulation capabilities, or access to those capabilities, to support the evaluation of commercial advanced reactor license applications, including the qualification of advanced nuclear reactor fuel.

(2)

Coordination and stakeholder input

In developing the report, the Commission shall seek input from the Secretary, the nuclear energy industry, a diverse set of technology developers, and other public stakeholders.

(3)

Cost and schedule estimate

The report shall include proposed cost estimates, budgets, and timeframes for developing and implementing a technology-inclusive regulatory framework for licensing commercial advanced nuclear reactor technologies, including completion of a rulemaking.

(4)

Required evaluations

Consistent with the role of the Commission in protecting public health and safety and common defense and security, the report shall evaluate—

(A)

the ability of the Commission to complete a rulemaking to establish a technology-inclusive regulatory framework for licensing commercial advanced nuclear reactor technologies by December 31, 2027;

(B)

the extent to which additional legislation, or Commission action or modification of policy, is needed to implement any part of the new regulatory framework;

(C)

the need for additional Commission expertise, modeling, and simulation capabilities, or access to those capabilities, to support the evaluation of licensing applications for commercial advanced nuclear reactors and research and test reactors, including applications that use alternative coolants or alternative fuels, operate at or near atmospheric pressure, and use passive safety strategies; and

(D)

the budgets and timeframes for acquiring or accessing the necessary expertise to support the evaluation of license applications for commercial advanced nuclear reactors and research and test reactors.

104.

Baffle-former bolt guidance

(a)

Revisions to guidance

Not later than 90 days after the date of enactment of this Act, the Commission shall publish any necessary revisions to the guidance on the baseline examination schedule and subsequent examination frequency for baffle-former bolts in pressurized water reactors with down-flow configurations.

(b)

Report

Not later than 90 days after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees—

(1)

a report explaining any revisions made to the guidance described in subsection (a); or

(2)

if no revisions were made, a report explaining why the guidance, as in effect on the date of submission of the report, is sufficient.

105.

Evacuation report

(a)

In general

Not later than 180 days after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees a report describing the actions the Commission has taken, or plans to take, to consider lessons learned since September 11, 2001, Superstorm Sandy, Fukushima, and other recent natural disasters regarding directed or spontaneous evacuations in densely populated urban and suburban areas.

(b)

Inclusions

The report under subsection (a) shall—

(1)

describe the actions of the Commission—

(A)

to consider the results from—

(i)

the State-of-the-Art Reactor Consequence Analyses project; and

(ii)

the current examination by the Commission of emergency planning zones for small modular reactors and advanced nuclear reactors; and

(B)

to monitor international reviews, including reviews conducted by—

(i)

the United Nations Scientific Committee on the Effects of Atomic Radiation;

(ii)

the World Health Organization; and

(iii)

the Fukushima Health Management Survey; and

(2)

with respect to a disaster similar to a disaster described in subsection (a), include information about—

(A)

potential shadow evacuations in response to the disaster; and

(B)

what levels of self-evacuation should be expected during the disaster, including outside the 10-mile evacuation zone.

(c)

Consultation required

The report under subsection (a) shall be prepared after consultation with—

(1)

the Federal Radiological Preparedness Coordinating Committee;

(2)

State emergency planning officials from States that the Commission determines to be relevant to the report; and

(3)

experts in analyzing human behavior and probable responses to a radiological emission event.

106.

Encouraging private investment in research and test reactors

(a)

Purpose

The purpose of this section is to encourage private investment in research and test reactors.

(b)

Research and development activities

Section 104 c. of the Atomic Energy Act of 1954 (42 U.S.C. 2134(c)) is amended—

(1)

in the first sentence, by striking and which are not facilities of the type specified in subsection 104 b. and inserting a period; and

(2)

by adding at the end the following: The Commission is authorized to issue licenses under this section for utilization facilities useful in the conduct of research and development activities of the types specified in section 31 in which the licensee sells research and testing services and energy to others, subject to the condition that the licensee shall recover not more than 75 percent of the annual costs to the licensee of owning and operating the facility through sales of nonenergy services, energy, or both, other than research and development or education and training, of which not more than 50 percent may be through sales of energy..

107.

Commission report on accident tolerant fuel

(a)

Definition of accident tolerant fuel

In this section, the term accident tolerant fuel means a new technology that—

(1)

makes an existing commercial nuclear reactor more resistant to a nuclear incident (as defined in section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014)); and

(2)

lowers the cost of electricity over the licensed lifetime of an existing commercial nuclear reactor.

(b)

Report to Congress

Not later than 1 year after the date of enactment of this Act, the Commission shall submit to Congress a report describing the status of the licensing process of the Commission for accident tolerant fuel.

108.

Report identifying best practices for establishment and operation of local community advisory boards

(a)

Best practices report

Not later than 18 months after the date of enactment of this Act, the Commission shall submit to Congress, and make publicly available, a report identifying best practices with respect to the establishment and operation of a local community advisory board to foster communication and information exchange between a licensee planning for and involved in decommissioning activities and members of the community that decommissioning activities may affect, including lessons learned from any such board in existence before the date of enactment of this Act.

(b)

Contents

The report described in subsection (a) shall include—

(1)

a description of—

(A)

the topics that could be brought before a local community advisory board;

(B)

how such a board’s input could be used to inform the decision-making processes of stakeholders for various decommissioning activities;

(C)

what interactions such a board could have with the Commission and other Federal regulatory bodies to support the board members’ overall understanding of the decommissioning process and promote dialogue between the affected stakeholders and the licensee involved in decommissioning activities; and

(D)

how such a board could offer opportunities for public engagement throughout all phases of the decommissioning process;

(2)

a discussion of the composition of a local community advisory board; and

(3)

best practices relating to the establishment and operation of a local community advisory board, including—

(A)

the time of establishment of such a board;

(B)

the frequency of meetings of such a board;

(C)

the selection of board members;

(D)

the term of board members;

(E)

the responsibility for logistics required to support such a board’s meetings and other routine activities; and

(F)

any other best practices relating to such a local community advisory board that are identified by the Commission.

(c)

Consultation

In developing the report described under subsection (a), the Commission shall consult with any host State, any community within the emergency planning zone of an applicable nuclear power reactor, and any existing local community advisory board.

(d)

Public meetings

(1)

In general

The consultation required under subsection (c) shall include public meetings.

(2)

Public participation

The public meetings under paragraph (1) shall be conducted under the requirements applicable to category 3 meetings under the policy statement of the Commission entitled Enhancing Public Participation in NRC Meetings; Policy Statement (67 Fed. Reg. 36920 (May 28, 2002)) (or a successor policy statement).

(3)

Number of meetings

(A)

In general

The Commission shall conduct not less than 10 public meetings under paragraph (1) in locations that ensure geographic diversity across the United States.

(B)

Priority

In determining locations in which to conduct a public meeting under subparagraph (A), the Commission shall give priority to States that—

(i)

have a nuclear power reactor currently undergoing the decommissioning process; and

(ii)

request a public meeting under this paragraph.

(4)

Written summary

The report under subsection (a) shall include a written summary of the public meetings conducted under paragraph (1).

109.

Report on study recommendations

Not later than 90 days after the date of enactment of this Act, the Commission shall submit to Congress a report describing the status of addressing and implementing the recommendations contained in the memorandum of the Executive Director of Operations of the Commission entitled Tasking in Response to the Assessment of the Considerations Identified in a Study of Reprisal and Chilling Effect for Raising Mission-Related Concerns and Differing Views at the Nuclear Regulatory Commission and dated June 19, 2018 (ADAMS Accession No.: ML18165A296).

II

Uranium

201.

Uranium recovery report

Not later than 90 days after the date of enactment of this Act, the Commission shall submit to the appropriate congressional committees a report describing—

(1)

the duration of uranium recovery license issuance and amendment reviews; and

(2)

recommendations to improve efficiency and transparency of uranium recovery license issuance and amendment reviews.

202.

Pilot program for uranium recovery fees

Not later than 1 year after the date of enactment of this Act, the Commission shall—

(1)

complete a voluntary pilot initiative to determine the feasibility of the establishment of a flat fee structure for routine licensing matters relating to uranium recovery; and

(2)

provide to the appropriate congressional committees a report describing the results of the pilot initiative under paragraph (1).

Speaker of the House of Representatives

Vice President of the United States and President of the Senate