S.Amdt. 1418Senate109th Congress (2005-2007)

To require life cycle cost estimates for the destruction of lethal chemical munitions under the Assembled Chemical Weapons Alternatives program.

What it does: Adds SEC. 330. LIFE CYCLE COST ESTIMATES FOR THE DESTRUCTION OF LETHAL CHEMICAL MUNITIONS UNDER ASSEMBLED CHEMICAL WEAPONS ALTERNATIVES PROGRAM on page 66, line 22
Submitted July 22, 2005

What it changes

1 change to S. 1042

Adds a section
  1. Adds SEC. 330. LIFE CYCLE COST ESTIMATES FOR THE DESTRUCTION OF LETHAL CHEMICAL MUNITIONS UNDER ASSEMBLED CHEMICAL WEAPONS ALTERNATIVES PROGRAM on page 66, line 22

    Adds a sectionPrinted page

    Inserted: SEC. 330. LIFE CYCLE COST ESTIMATES FOR THE DESTRUCTION OF LETHAL CHEMICAL MUNITIONS UNDER ASSEMBLED CHEMICAL WEAPONS ALTERNATIVES PROGRAM.

    Inserted: Upon completion of 60 percent of the design build at each site of the Assembled Chemical Weapons Alternatives program, the Program Manager for Assembled Chemical Weapons Alternatives shall, after consultation with the congressional defense committees, certify in writing to such committees updated and revised life cycle cost estimates for the destruction of lethal chemical munitions for each site under such program.

    Original wording

    On page 66, after line 22, insert the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 1418. Mr. ALLARD (for himself and Mr. McConnell) proposed an amendment to the bill S. 1042, to authorize appropriations for fiscal year 2006 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year for the Armed Forces, and for other purposes; as follows:

On page 66, after line 22, insert the following:

SEC. 330. LIFE CYCLE COST ESTIMATES FOR THE DESTRUCTION OF LETHAL CHEMICAL MUNITIONS UNDER ASSEMBLED CHEMICAL WEAPONS ALTERNATIVES PROGRAM.

Upon completion of 60 percent of the design build at each site of the Assembled Chemical Weapons Alternatives program, the Program Manager for Assembled Chemical Weapons Alternatives shall, after consultation with the congressional defense committees, certify in writing to such committees updated and revised life cycle cost estimates for the destruction of lethal chemical munitions for each site under such program.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

6 earlier actions
Floor Latest Action

Measure laid before Senate by unanimous consent. (consideration: CR S12377)

November 4, 2005

View full timeline
Floor

Measure laid before Senate by unanimous consent. (consideration: CR S12377)

November 4, 2005

Floor

Proposed amendment SA 1418 withdrawn in Senate.

November 4, 2005

Floor

Considered by Senate. (consideration: CR S8897)

July 26, 2005

Floor

Considered by Senate. (consideration: CR S8772)

July 25, 2005

Floor

Senate amendment submitted

July 22, 2005

Floor

Senate amendment proposed (on the floor): Amendment SA 1418 proposed by Senator Allard.

July 22, 2005

Floor

Amendment SA 1418 proposed by Senator Allard. (consideration: CR S8728; text: CR S8728) To require life cycle cost estimates for the destruction of lethal chemical munitions under the Assembled Chemical Weapons Alternatives program.

July 22, 2005