An amendment numbered 6 printed in House Report 111-570 to prohibit funding for all of the member-requested earmarks for military construction projects.
What it does: Adds Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects: at the end of the billDescription
At the end of the bill (before the short title), insert the following: Sec. XX. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects: ***.
What it changes
1 change to H.R. 5822
We couldn't match these changes to the text of H.R. 5822, so they're shown as written.
Adds Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects: at the end of the bill
Adds a sectionInserted: Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects:
Inserted: ----------------------------------------------------------------------------------------------------------------Account Location Project Amount Army................................... Alabama: Fort Rucker..... Emergency Medical $1,700,000 Services Facility.
Inserted: Air Force.............................. Alabama: Maxwell AFB..... Air Traffic Control Tower $810,000 Defense-Wide........................... Arizona: Marana.......... SOF Parachute Training $6,250,000 Facility.
Inserted: Army NG................................ Arkansas: Camp Robinson.. Regional Training $2,334,000 Institute, Ph 2.
Inserted: Navy................................... California: Coronado NAB. MESG-1 Consolidated Boat $6,890,000 Maintenance Facility.
Inserted: Air Force.............................. California: Los Angeles Parking Structure, Ph 2.. $4,500,000 AFB.
Inserted: Air NG................................. California: Moffett Field Relocate Main Gate....... $2,000,000 Navy................................... California: Monterey NSA. International Academic $11,960,000 Instruction Building.
Inserted: Army NG................................ California: Sacramento... Field Maintenance Shop $891,000 Paving.
Inserted: Air Force.............................. California: Travis AFB... BCE Maintenance Shops and $387,000 Supply Warehouse.
Inserted: Army NG................................ California: Ventura...... Renewable Photovoltaic $1,466,000 Solar Power.
Inserted: Air NG................................. Colorado: Buckley AFB.... Repair Taxiways Juliet $4,000,000 and Lima.
Inserted: Army NG................................ Colorado: Watkins........ Parachute Maintenance $3,569,000 Facility.
Show 56 more inserted paragraphsShow less
Inserted: Navy................................... Connecticut: New London Submarine Group Two $550,000 NSB. Headquarters.
Inserted: Air Force.............................. Florida: MacDill AFB..... Infrastructure $249,000 Improvements.
Inserted: Navy................................... Florida: Panama City NSA. Land Acquisition-9 Acres. $5,960,000 Navy................................... Georgia: Albany MCLB..... Maintenance Center Test $5,180,000 Firing Range.
Inserted: Air Force.............................. Georgia: Robins AFB...... Combat Communications $5,500,000 Squadron Warehouse.
Inserted: Army NG................................ Illinois: Marseilles Simulation Center........ $2,500,000 Training Area.
Inserted: Air Force.............................. Illinois: Scott AFB...... New Fitness Facility, Ph $396,000 1.
Inserted: Navy................................... Indiana: Crane NSWC...... Platform Protection $760,000 Engineering Complex.
Inserted: Army NG................................ Iowa: Camp Dodge......... Regional Training $800,000 Institute, Ph 1.
Inserted: Air NG................................. Iowa: Des Moines......... Corrosion Control Hangar. $4,750,000 Army NG................................ Iowa: Iowa City.......... Simulation Center/MVSB/ $1,999,000 Helipad/Parking.
Inserted: Army NG................................ Kentucky: Frankfort...... Joint Forces $281,000 Headquarters, Ph 1.
Inserted: Air NG................................. Kentucky: Standiford Contingency Response $534,000 Field. Group Facility.
Inserted: Air NG................................. Louisiana: New Orleans ASA Replace Alert Complex $2,000,000 NAS/JRB.
Inserted: Navy................................... Maine: Portsmouth NSY.... Consolidation of $11,910,000 Structural Shops, Ph 1.
Inserted: Army NG................................ Maryland: Easton......... Readiness Center Add/Alt. $347,000 Army................................... Maryland: Fort Meade..... Infrastructure-Mapes Road $1,750,000 & Cooper Avenue.
Inserted: Navy................................... Maryland: Patuxent River Atlantic Test Range $10,160,000 NAS. Addition.
Inserted: Air NG................................. Massachusetts: Barnes Add to Aircraft $6,000,000 ANGB. Maintenance Hangar.
Inserted: Army NG................................ Michigan: Fort Custer Troop Service Support $446,000 (Augusta). Center.
Inserted: Air NG................................. Minnesota: Duluth........ Load Crew Training & $8,000,000 Weapons Release Shops.
Inserted: Army NG................................ Minnesota: Mankato....... Field Maintenance Shop... $947,000 Defense-Wide........................... Mississippi: Stennis SOF Land Acquisition, Ph $8,000,000 Space Center. 3.
Inserted: Air Force.............................. Missouri: Whiteman AFB... Consolidated Air $23,500,000 Operations Facility.
Inserted: Army NG................................ Nevada: Las Vegas........ Civil Support Team Ready $8,771,000 Building.
Inserted: Air NG................................. New Jersey: Atlantic City Fuel Cell and Corrosion $8,500,000 IAP. Control Hangar.
Inserted: Army Reserve........................... New Jersey: Fort Dix..... Automated Multipurpose $9,800,000 Machine Gun Range.
Inserted: Air Force.............................. New Mexico: Holloman AFB. Parallel Taxiway, Runway $8,000,000 07/25.
Inserted: Air Force.............................. New Mexico: Kirtland AFB. Replace Fire Station 3... $6,800,000 Army................................... New York: Fort Drum...... Alert Holding Area $6,700,000 Facility.
Inserted: Air Reserve............................ New York: Niagara Falls C-130 Flightline $9,500,000 ARS. Operations Facility, Ph 1.
Inserted: Army NG................................ New York: Ronkonkoma Flightline Rehabilitation $2,780,000 (MacArthur Airport).
Inserted: Air NG................................. New York: Stewart ANGB... Aircraft Conversion $3,750,000 Facility.
Inserted: Army NG................................ North Carolina: Camp Barracks (AT), Ph 1...... $1,484,000 Butner.
Inserted: Army NG................................ North Carolina: AASF 1 Fixed Wing Hangar $8,815,000 Morrisville. Annex.
Inserted: Army NG................................ North Carolina: Murphy... Fire Fighting Team $223,000 Support Facility.
Inserted: Air Force.............................. North Carolina: Pope AFB. Crash/Fire/ Rescue $13,500,000 Station.
Inserted: Air Force.............................. North Dakota: Grand Forks Central Deployment Center $495,000 AFB.
Inserted: Army NG................................ Ohio: Camp Sherman....... Maintenance Building Add/ $3,100,000 Alt.
Inserted: Army NG................................ Ohio: Ravenna Training Unit Training Equipment $2,000,000 Site. Site Add/Alt.
Inserted: Air NG................................. Ohio: Toledo Express Replace Security Forces $7,300,000 Airport. Complex.
Inserted: Defense-Wide........................... Oklahoma: Tulsa IAP...... Fuels Storage Complex.... $1,036,000 Army NG................................ Oregon: Salem............ Armed Forces Reserve $1,243,000 Center Add/Alt (JFHQ).
Inserted: Air NG................................. Pennsylvania: Fort Multipurpose Air National $675,000 Indiantown Gap. Guard Training Facility.
Inserted: Army NG................................ Pennsylvania: Hermitage.. Readiness Center......... $671,000 Army NG................................ Pennsylvania: Tobyhanna.. Armed Forces Reserve $1,513,000 Center.
Inserted: Army NG................................ Pennsylvania: Field Maintenance Shop... $1,508,000 Williamsport.
Inserted: Army NG................................ Rhode Island: Middletown. Readiness Center Add/Alt. $3,646,000 Army NG................................ Rhode Island: Quonset Readiness Center......... $3,729,000 Point.
Inserted: Air NG................................. South Carolina: McEntire Replace Operations and $9,100,000 JRB. Training Facility.
Inserted: Air NG................................. South Dakota: Joe Foss Aircraft Maintenance $3,600,000 Field. Shops.
Inserted: Air Force.............................. Tennessee: Arnold AFB.... AEDC Power Distribution $378,000 Modernization.
Inserted: Army................................... Texas: Corpus Christi Rotor Blade Processing $13,400,000 Depot. Facility, Ph 2.
Inserted: Army................................... Texas: Fort Bliss........ Alternative Energy $1,166,000 Projects.
Inserted: Army................................... Texas: Fort Bliss........ Rail Yard Improvements... $2,070,000 Army................................... Texas: Fort Hood......... Soldier Readiness $1,000,000 Processing Center.
Inserted: Navy................................... Texas: Kingsville NAS.... Youth Center............. $2,610,000 Air Force.............................. Texas: Lackland AFB...... Consolidated Security $900,000 Forces Ops Center, Ph 1.
Inserted: Air Force.............................. Texas: Laughlin AFB...... Community Event Complex.. $10,500,000 Army NG................................ Texas: Laredo............ Receiving, Staging, & $475,000 Onward Integration Facility/Hangar.
Inserted: Army NG................................ Texas: McLennan County... Operational Reserve $5,000,000 Headquarters.
Inserted: Army NG................................ Texas: South Texas Cantonment and Support $5,000,000 Training Center. Infrastructure.
Inserted: Army................................... Virginia: Fort Belvoir... Growth Support $3,060,000 Infrastructure.
Inserted: Air Force.............................. Virginia: Langley AFB.... Clear Zone Land $3,000,000 Acquisition, Ph 1.
Inserted: Defense-Wide........................... Washington: Fort Lewis... SOF Military Working Dog $4,700,000 Kennel.
Inserted: Navy................................... Washington: Kitsap NB.... Charleston Gate ECP $6,150,000 Improvements.
Inserted: Army NG................................ West Virginia: Bridgeport FWAATS Apron Expansion... $2,000,000 Army NG................................ West Virginia: Bridgeport FWAATS Expansion......... $2,000,000 Army NG................................ West Virginia: Glen Jean. Emergency Power Generator $1,500,000 Army NG................................ Wisconsin: Wausau........ Field Maintenance Shop... $12,008,000 Army NG................................ Guam: Barrigada.......... Joint Forces HQ Readiness $778,000 Center Add/Alt.
Original wording
At the end of the bill (before the short title), insert the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
At the end of the bill (before the short title), insert the following:
Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects:
----------------------------------------------------------------------------------------------------------------Account Location Project Amount
----------------------------------------------------------------------------------------------------------------
Army................................... Alabama: Fort Rucker..... Emergency Medical $1,700,000 Services Facility.
Air Force.............................. Alabama: Maxwell AFB..... Air Traffic Control Tower $810,000
Defense-Wide........................... Arizona: Marana.......... SOF Parachute Training $6,250,000 Facility.
Army NG................................ Arkansas: Camp Robinson.. Regional Training $2,334,000 Institute, Ph 2.
Navy................................... California: Coronado NAB. MESG-1 Consolidated Boat $6,890,000 Maintenance Facility.
Air Force.............................. California: Los Angeles Parking Structure, Ph 2.. $4,500,000 AFB.
Air NG................................. California: Moffett Field Relocate Main Gate....... $2,000,000
Navy................................... California: Monterey NSA. International Academic $11,960,000 Instruction Building.
Army NG................................ California: Sacramento... Field Maintenance Shop $891,000 Paving.
Air Force.............................. California: Travis AFB... BCE Maintenance Shops and $387,000 Supply Warehouse.
Army NG................................ California: Ventura...... Renewable Photovoltaic $1,466,000 Solar Power.
Air NG................................. Colorado: Buckley AFB.... Repair Taxiways Juliet $4,000,000 and Lima.
Army NG................................ Colorado: Watkins........ Parachute Maintenance $3,569,000 Facility.
Navy................................... Connecticut: New London Submarine Group Two $550,000 NSB. Headquarters.
Air Force.............................. Florida: MacDill AFB..... Infrastructure $249,000 Improvements.
Navy................................... Florida: Panama City NSA. Land Acquisition-9 Acres. $5,960,000
Navy................................... Georgia: Albany MCLB..... Maintenance Center Test $5,180,000 Firing Range.
Air Force.............................. Georgia: Robins AFB...... Combat Communications $5,500,000 Squadron Warehouse.
Army NG................................ Illinois: Marseilles Simulation Center........ $2,500,000 Training Area.
Air Force.............................. Illinois: Scott AFB...... New Fitness Facility, Ph $396,000 1.
Navy................................... Indiana: Crane NSWC...... Platform Protection $760,000 Engineering Complex.
Army NG................................ Iowa: Camp Dodge......... Regional Training $800,000 Institute, Ph 1.
Air NG................................. Iowa: Des Moines......... Corrosion Control Hangar. $4,750,000
Army NG................................ Iowa: Iowa City.......... Simulation Center/MVSB/ $1,999,000 Helipad/Parking.
Army NG................................ Kentucky: Frankfort...... Joint Forces $281,000 Headquarters, Ph 1.
Air NG................................. Kentucky: Standiford Contingency Response $534,000 Field. Group Facility.
Air NG................................. Louisiana: New Orleans ASA Replace Alert Complex $2,000,000 NAS/JRB.
Navy................................... Maine: Portsmouth NSY.... Consolidation of $11,910,000 Structural Shops, Ph 1.
Army NG................................ Maryland: Easton......... Readiness Center Add/Alt. $347,000
Army................................... Maryland: Fort Meade..... Infrastructure-Mapes Road $1,750,000 & Cooper Avenue.
Navy................................... Maryland: Patuxent River Atlantic Test Range $10,160,000 NAS. Addition.
Air NG................................. Massachusetts: Barnes Add to Aircraft $6,000,000 ANGB. Maintenance Hangar.
Army NG................................ Michigan: Fort Custer Troop Service Support $446,000 (Augusta). Center.
Air NG................................. Minnesota: Duluth........ Load Crew Training & $8,000,000 Weapons Release Shops.
Army NG................................ Minnesota: Mankato....... Field Maintenance Shop... $947,000
Defense-Wide........................... Mississippi: Stennis SOF Land Acquisition, Ph $8,000,000 Space Center. 3.
Air Force.............................. Missouri: Whiteman AFB... Consolidated Air $23,500,000 Operations Facility.
Army NG................................ Nevada: Las Vegas........ Civil Support Team Ready $8,771,000 Building.
Air NG................................. New Jersey: Atlantic City Fuel Cell and Corrosion $8,500,000 IAP. Control Hangar.
Army Reserve........................... New Jersey: Fort Dix..... Automated Multipurpose $9,800,000 Machine Gun Range.
Air Force.............................. New Mexico: Holloman AFB. Parallel Taxiway, Runway $8,000,000 07/25.
Air Force.............................. New Mexico: Kirtland AFB. Replace Fire Station 3... $6,800,000
Army................................... New York: Fort Drum...... Alert Holding Area $6,700,000 Facility.
Air Reserve............................ New York: Niagara Falls C-130 Flightline $9,500,000 ARS. Operations Facility, Ph 1.
Army NG................................ New York: Ronkonkoma Flightline Rehabilitation $2,780,000 (MacArthur Airport).
Air NG................................. New York: Stewart ANGB... Aircraft Conversion $3,750,000 Facility.
Army NG................................ North Carolina: Camp Barracks (AT), Ph 1...... $1,484,000 Butner.
Army NG................................ North Carolina: AASF 1 Fixed Wing Hangar $8,815,000 Morrisville. Annex.
Army NG................................ North Carolina: Murphy... Fire Fighting Team $223,000 Support Facility.
Air Force.............................. North Carolina: Pope AFB. Crash/Fire/ Rescue $13,500,000 Station.
Air Force.............................. North Dakota: Grand Forks Central Deployment Center $495,000 AFB.
Army NG................................ Ohio: Camp Sherman....... Maintenance Building Add/ $3,100,000 Alt.
Army NG................................ Ohio: Ravenna Training Unit Training Equipment $2,000,000 Site. Site Add/Alt.
Air NG................................. Ohio: Toledo Express Replace Security Forces $7,300,000 Airport. Complex.
Defense-Wide........................... Oklahoma: Tulsa IAP...... Fuels Storage Complex.... $1,036,000
Army NG................................ Oregon: Salem............ Armed Forces Reserve $1,243,000 Center Add/Alt (JFHQ).
Air NG................................. Pennsylvania: Fort Multipurpose Air National $675,000 Indiantown Gap. Guard Training Facility.
Army NG................................ Pennsylvania: Hermitage.. Readiness Center......... $671,000
Army NG................................ Pennsylvania: Tobyhanna.. Armed Forces Reserve $1,513,000 Center.
Army NG................................ Pennsylvania: Field Maintenance Shop... $1,508,000 Williamsport.
Army NG................................ Rhode Island: Middletown. Readiness Center Add/Alt. $3,646,000
Army NG................................ Rhode Island: Quonset Readiness Center......... $3,729,000 Point.
Air NG................................. South Carolina: McEntire Replace Operations and $9,100,000 JRB. Training Facility.
Air NG................................. South Dakota: Joe Foss Aircraft Maintenance $3,600,000 Field. Shops.
Air Force.............................. Tennessee: Arnold AFB.... AEDC Power Distribution $378,000 Modernization.
Army................................... Texas: Corpus Christi Rotor Blade Processing $13,400,000 Depot. Facility, Ph 2.
Army................................... Texas: Fort Bliss........ Alternative Energy $1,166,000 Projects.
Army................................... Texas: Fort Bliss........ Rail Yard Improvements... $2,070,000
Army................................... Texas: Fort Hood......... Soldier Readiness $1,000,000 Processing Center.
Navy................................... Texas: Kingsville NAS.... Youth Center............. $2,610,000
Air Force.............................. Texas: Lackland AFB...... Consolidated Security $900,000 Forces Ops Center, Ph 1.
Air Force.............................. Texas: Laughlin AFB...... Community Event Complex.. $10,500,000
Army NG................................ Texas: Laredo............ Receiving, Staging, & $475,000 Onward Integration Facility/Hangar.
Army NG................................ Texas: McLennan County... Operational Reserve $5,000,000 Headquarters.
Army NG................................ Texas: South Texas Cantonment and Support $5,000,000 Training Center. Infrastructure.
Army................................... Virginia: Fort Belvoir... Growth Support $3,060,000 Infrastructure.
Air Force.............................. Virginia: Langley AFB.... Clear Zone Land $3,000,000 Acquisition, Ph 1.
Defense-Wide........................... Washington: Fort Lewis... SOF Military Working Dog $4,700,000 Kennel.
Navy................................... Washington: Kitsap NB.... Charleston Gate ECP $6,150,000 Improvements.
Army NG................................ West Virginia: Bridgeport FWAATS Apron Expansion... $2,000,000
Army NG................................ West Virginia: Bridgeport FWAATS Expansion......... $2,000,000
Army NG................................ West Virginia: Glen Jean. Emergency Power Generator $1,500,000
Army NG................................ Wisconsin: Wausau........ Field Maintenance Shop... $12,008,000
Army NG................................ Guam: Barrigada.......... Joint Forces HQ Readiness $778,000 Center Add/Alt.
----------------------------------------------------------------------------------------------------------------
Legislative Activity
Stay on top of the latest movement without scrolling through every action
House amendment offered
July 28, 2010
View full timeline
House amendment offered
July 28, 2010
House amendment offered/reported by : Amendment (A006) offered by Mr. Flake.(consideration: CR H6238-6241; text: CR H6238-6239)
July 28, 2010 • 5:36 PM
Amendment (A006) offered by Mr. Flake. (consideration: CR H6238-6241; text: CR H6238-6239)
July 28, 2010 • 5:36 PM
By unanimous consent, the Flake amendment was withdrawn. (consideration: CR H6240)
July 28, 2010 • 5:48 PM