H.Amdt. 734House111th Congress (2009-2011)

An amendment numbered 6 printed in House Report 111-570 to prohibit funding for all of the member-requested earmarks for military construction projects.

What it does: Adds Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects: at the end of the bill
Sponsored by Jeff FlakeRep. Jeff Flake (R-AZ)
Submitted July 28, 2010

Description

At the end of the bill (before the short title), insert the following: Sec. XX. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects: ***.

What it changes

1 change to H.R. 5822

Adds a section

We couldn't match these changes to the text of H.R. 5822, so they're shown as written.

  1. Adds Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects: at the end of the bill

    Adds a section

    Inserted: Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects:

    Inserted: ----------------------------------------------------------------------------------------------------------------Account Location Project Amount Army................................... Alabama: Fort Rucker..... Emergency Medical $1,700,000 Services Facility.

    Inserted: Air Force.............................. Alabama: Maxwell AFB..... Air Traffic Control Tower $810,000 Defense-Wide........................... Arizona: Marana.......... SOF Parachute Training $6,250,000 Facility.

    Inserted: Army NG................................ Arkansas: Camp Robinson.. Regional Training $2,334,000 Institute, Ph 2.

    Inserted: Navy................................... California: Coronado NAB. MESG-1 Consolidated Boat $6,890,000 Maintenance Facility.

    Inserted: Air Force.............................. California: Los Angeles Parking Structure, Ph 2.. $4,500,000 AFB.

    Inserted: Air NG................................. California: Moffett Field Relocate Main Gate....... $2,000,000 Navy................................... California: Monterey NSA. International Academic $11,960,000 Instruction Building.

    Inserted: Army NG................................ California: Sacramento... Field Maintenance Shop $891,000 Paving.

    Inserted: Air Force.............................. California: Travis AFB... BCE Maintenance Shops and $387,000 Supply Warehouse.

    Inserted: Army NG................................ California: Ventura...... Renewable Photovoltaic $1,466,000 Solar Power.

    Inserted: Air NG................................. Colorado: Buckley AFB.... Repair Taxiways Juliet $4,000,000 and Lima.

    Inserted: Army NG................................ Colorado: Watkins........ Parachute Maintenance $3,569,000 Facility.

    Show 56 more inserted paragraphs

    Inserted: Navy................................... Connecticut: New London Submarine Group Two $550,000 NSB. Headquarters.

    Inserted: Air Force.............................. Florida: MacDill AFB..... Infrastructure $249,000 Improvements.

    Inserted: Navy................................... Florida: Panama City NSA. Land Acquisition-9 Acres. $5,960,000 Navy................................... Georgia: Albany MCLB..... Maintenance Center Test $5,180,000 Firing Range.

    Inserted: Air Force.............................. Georgia: Robins AFB...... Combat Communications $5,500,000 Squadron Warehouse.

    Inserted: Army NG................................ Illinois: Marseilles Simulation Center........ $2,500,000 Training Area.

    Inserted: Air Force.............................. Illinois: Scott AFB...... New Fitness Facility, Ph $396,000 1.

    Inserted: Navy................................... Indiana: Crane NSWC...... Platform Protection $760,000 Engineering Complex.

    Inserted: Army NG................................ Iowa: Camp Dodge......... Regional Training $800,000 Institute, Ph 1.

    Inserted: Air NG................................. Iowa: Des Moines......... Corrosion Control Hangar. $4,750,000 Army NG................................ Iowa: Iowa City.......... Simulation Center/MVSB/ $1,999,000 Helipad/Parking.

    Inserted: Army NG................................ Kentucky: Frankfort...... Joint Forces $281,000 Headquarters, Ph 1.

    Inserted: Air NG................................. Kentucky: Standiford Contingency Response $534,000 Field. Group Facility.

    Inserted: Air NG................................. Louisiana: New Orleans ASA Replace Alert Complex $2,000,000 NAS/JRB.

    Inserted: Navy................................... Maine: Portsmouth NSY.... Consolidation of $11,910,000 Structural Shops, Ph 1.

    Inserted: Army NG................................ Maryland: Easton......... Readiness Center Add/Alt. $347,000 Army................................... Maryland: Fort Meade..... Infrastructure-Mapes Road $1,750,000 & Cooper Avenue.

    Inserted: Navy................................... Maryland: Patuxent River Atlantic Test Range $10,160,000 NAS. Addition.

    Inserted: Air NG................................. Massachusetts: Barnes Add to Aircraft $6,000,000 ANGB. Maintenance Hangar.

    Inserted: Army NG................................ Michigan: Fort Custer Troop Service Support $446,000 (Augusta). Center.

    Inserted: Air NG................................. Minnesota: Duluth........ Load Crew Training & $8,000,000 Weapons Release Shops.

    Inserted: Army NG................................ Minnesota: Mankato....... Field Maintenance Shop... $947,000 Defense-Wide........................... Mississippi: Stennis SOF Land Acquisition, Ph $8,000,000 Space Center. 3.

    Inserted: Air Force.............................. Missouri: Whiteman AFB... Consolidated Air $23,500,000 Operations Facility.

    Inserted: Army NG................................ Nevada: Las Vegas........ Civil Support Team Ready $8,771,000 Building.

    Inserted: Air NG................................. New Jersey: Atlantic City Fuel Cell and Corrosion $8,500,000 IAP. Control Hangar.

    Inserted: Army Reserve........................... New Jersey: Fort Dix..... Automated Multipurpose $9,800,000 Machine Gun Range.

    Inserted: Air Force.............................. New Mexico: Holloman AFB. Parallel Taxiway, Runway $8,000,000 07/25.

    Inserted: Air Force.............................. New Mexico: Kirtland AFB. Replace Fire Station 3... $6,800,000 Army................................... New York: Fort Drum...... Alert Holding Area $6,700,000 Facility.

    Inserted: Air Reserve............................ New York: Niagara Falls C-130 Flightline $9,500,000 ARS. Operations Facility, Ph 1.

    Inserted: Army NG................................ New York: Ronkonkoma Flightline Rehabilitation $2,780,000 (MacArthur Airport).

    Inserted: Air NG................................. New York: Stewart ANGB... Aircraft Conversion $3,750,000 Facility.

    Inserted: Army NG................................ North Carolina: Camp Barracks (AT), Ph 1...... $1,484,000 Butner.

    Inserted: Army NG................................ North Carolina: AASF 1 Fixed Wing Hangar $8,815,000 Morrisville. Annex.

    Inserted: Army NG................................ North Carolina: Murphy... Fire Fighting Team $223,000 Support Facility.

    Inserted: Air Force.............................. North Carolina: Pope AFB. Crash/Fire/ Rescue $13,500,000 Station.

    Inserted: Air Force.............................. North Dakota: Grand Forks Central Deployment Center $495,000 AFB.

    Inserted: Army NG................................ Ohio: Camp Sherman....... Maintenance Building Add/ $3,100,000 Alt.

    Inserted: Army NG................................ Ohio: Ravenna Training Unit Training Equipment $2,000,000 Site. Site Add/Alt.

    Inserted: Air NG................................. Ohio: Toledo Express Replace Security Forces $7,300,000 Airport. Complex.

    Inserted: Defense-Wide........................... Oklahoma: Tulsa IAP...... Fuels Storage Complex.... $1,036,000 Army NG................................ Oregon: Salem............ Armed Forces Reserve $1,243,000 Center Add/Alt (JFHQ).

    Inserted: Air NG................................. Pennsylvania: Fort Multipurpose Air National $675,000 Indiantown Gap. Guard Training Facility.

    Inserted: Army NG................................ Pennsylvania: Hermitage.. Readiness Center......... $671,000 Army NG................................ Pennsylvania: Tobyhanna.. Armed Forces Reserve $1,513,000 Center.

    Inserted: Army NG................................ Pennsylvania: Field Maintenance Shop... $1,508,000 Williamsport.

    Inserted: Army NG................................ Rhode Island: Middletown. Readiness Center Add/Alt. $3,646,000 Army NG................................ Rhode Island: Quonset Readiness Center......... $3,729,000 Point.

    Inserted: Air NG................................. South Carolina: McEntire Replace Operations and $9,100,000 JRB. Training Facility.

    Inserted: Air NG................................. South Dakota: Joe Foss Aircraft Maintenance $3,600,000 Field. Shops.

    Inserted: Air Force.............................. Tennessee: Arnold AFB.... AEDC Power Distribution $378,000 Modernization.

    Inserted: Army................................... Texas: Corpus Christi Rotor Blade Processing $13,400,000 Depot. Facility, Ph 2.

    Inserted: Army................................... Texas: Fort Bliss........ Alternative Energy $1,166,000 Projects.

    Inserted: Army................................... Texas: Fort Bliss........ Rail Yard Improvements... $2,070,000 Army................................... Texas: Fort Hood......... Soldier Readiness $1,000,000 Processing Center.

    Inserted: Navy................................... Texas: Kingsville NAS.... Youth Center............. $2,610,000 Air Force.............................. Texas: Lackland AFB...... Consolidated Security $900,000 Forces Ops Center, Ph 1.

    Inserted: Air Force.............................. Texas: Laughlin AFB...... Community Event Complex.. $10,500,000 Army NG................................ Texas: Laredo............ Receiving, Staging, & $475,000 Onward Integration Facility/Hangar.

    Inserted: Army NG................................ Texas: McLennan County... Operational Reserve $5,000,000 Headquarters.

    Inserted: Army NG................................ Texas: South Texas Cantonment and Support $5,000,000 Training Center. Infrastructure.

    Inserted: Army................................... Virginia: Fort Belvoir... Growth Support $3,060,000 Infrastructure.

    Inserted: Air Force.............................. Virginia: Langley AFB.... Clear Zone Land $3,000,000 Acquisition, Ph 1.

    Inserted: Defense-Wide........................... Washington: Fort Lewis... SOF Military Working Dog $4,700,000 Kennel.

    Inserted: Navy................................... Washington: Kitsap NB.... Charleston Gate ECP $6,150,000 Improvements.

    Inserted: Army NG................................ West Virginia: Bridgeport FWAATS Apron Expansion... $2,000,000 Army NG................................ West Virginia: Bridgeport FWAATS Expansion......... $2,000,000 Army NG................................ West Virginia: Glen Jean. Emergency Power Generator $1,500,000 Army NG................................ Wisconsin: Wausau........ Field Maintenance Shop... $12,008,000 Army NG................................ Guam: Barrigada.......... Joint Forces HQ Readiness $778,000 Center Add/Alt.

    Original wording

    At the end of the bill (before the short title), insert the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

At the end of the bill (before the short title), insert the following:

Sec. __. None of the funds provided in this Act shall be available from the following Department of Defense military construction accounts for the following projects:

----------------------------------------------------------------------------------------------------------------Account Location Project Amount

----------------------------------------------------------------------------------------------------------------

Army................................... Alabama: Fort Rucker..... Emergency Medical $1,700,000 Services Facility.

Air Force.............................. Alabama: Maxwell AFB..... Air Traffic Control Tower $810,000

Defense-Wide........................... Arizona: Marana.......... SOF Parachute Training $6,250,000 Facility.

Army NG................................ Arkansas: Camp Robinson.. Regional Training $2,334,000 Institute, Ph 2.

Navy................................... California: Coronado NAB. MESG-1 Consolidated Boat $6,890,000 Maintenance Facility.

Air Force.............................. California: Los Angeles Parking Structure, Ph 2.. $4,500,000 AFB.

Air NG................................. California: Moffett Field Relocate Main Gate....... $2,000,000

Navy................................... California: Monterey NSA. International Academic $11,960,000 Instruction Building.

Army NG................................ California: Sacramento... Field Maintenance Shop $891,000 Paving.

Air Force.............................. California: Travis AFB... BCE Maintenance Shops and $387,000 Supply Warehouse.

Army NG................................ California: Ventura...... Renewable Photovoltaic $1,466,000 Solar Power.

Air NG................................. Colorado: Buckley AFB.... Repair Taxiways Juliet $4,000,000 and Lima.

Army NG................................ Colorado: Watkins........ Parachute Maintenance $3,569,000 Facility.

Navy................................... Connecticut: New London Submarine Group Two $550,000 NSB. Headquarters.

Air Force.............................. Florida: MacDill AFB..... Infrastructure $249,000 Improvements.

Navy................................... Florida: Panama City NSA. Land Acquisition-9 Acres. $5,960,000

Navy................................... Georgia: Albany MCLB..... Maintenance Center Test $5,180,000 Firing Range.

Air Force.............................. Georgia: Robins AFB...... Combat Communications $5,500,000 Squadron Warehouse.

Army NG................................ Illinois: Marseilles Simulation Center........ $2,500,000 Training Area.

Air Force.............................. Illinois: Scott AFB...... New Fitness Facility, Ph $396,000 1.

Navy................................... Indiana: Crane NSWC...... Platform Protection $760,000 Engineering Complex.

Army NG................................ Iowa: Camp Dodge......... Regional Training $800,000 Institute, Ph 1.

Air NG................................. Iowa: Des Moines......... Corrosion Control Hangar. $4,750,000

Army NG................................ Iowa: Iowa City.......... Simulation Center/MVSB/ $1,999,000 Helipad/Parking.

Army NG................................ Kentucky: Frankfort...... Joint Forces $281,000 Headquarters, Ph 1.

Air NG................................. Kentucky: Standiford Contingency Response $534,000 Field. Group Facility.

Air NG................................. Louisiana: New Orleans ASA Replace Alert Complex $2,000,000 NAS/JRB.

Navy................................... Maine: Portsmouth NSY.... Consolidation of $11,910,000 Structural Shops, Ph 1.

Army NG................................ Maryland: Easton......... Readiness Center Add/Alt. $347,000

Army................................... Maryland: Fort Meade..... Infrastructure-Mapes Road $1,750,000 & Cooper Avenue.

Navy................................... Maryland: Patuxent River Atlantic Test Range $10,160,000 NAS. Addition.

Air NG................................. Massachusetts: Barnes Add to Aircraft $6,000,000 ANGB. Maintenance Hangar.

Army NG................................ Michigan: Fort Custer Troop Service Support $446,000 (Augusta). Center.

Air NG................................. Minnesota: Duluth........ Load Crew Training & $8,000,000 Weapons Release Shops.

Army NG................................ Minnesota: Mankato....... Field Maintenance Shop... $947,000

Defense-Wide........................... Mississippi: Stennis SOF Land Acquisition, Ph $8,000,000 Space Center. 3.

Air Force.............................. Missouri: Whiteman AFB... Consolidated Air $23,500,000 Operations Facility.

Army NG................................ Nevada: Las Vegas........ Civil Support Team Ready $8,771,000 Building.

Air NG................................. New Jersey: Atlantic City Fuel Cell and Corrosion $8,500,000 IAP. Control Hangar.

Army Reserve........................... New Jersey: Fort Dix..... Automated Multipurpose $9,800,000 Machine Gun Range.

Air Force.............................. New Mexico: Holloman AFB. Parallel Taxiway, Runway $8,000,000 07/25.

Air Force.............................. New Mexico: Kirtland AFB. Replace Fire Station 3... $6,800,000

Army................................... New York: Fort Drum...... Alert Holding Area $6,700,000 Facility.

Air Reserve............................ New York: Niagara Falls C-130 Flightline $9,500,000 ARS. Operations Facility, Ph 1.

Army NG................................ New York: Ronkonkoma Flightline Rehabilitation $2,780,000 (MacArthur Airport).

Air NG................................. New York: Stewart ANGB... Aircraft Conversion $3,750,000 Facility.

Army NG................................ North Carolina: Camp Barracks (AT), Ph 1...... $1,484,000 Butner.

Army NG................................ North Carolina: AASF 1 Fixed Wing Hangar $8,815,000 Morrisville. Annex.

Army NG................................ North Carolina: Murphy... Fire Fighting Team $223,000 Support Facility.

Air Force.............................. North Carolina: Pope AFB. Crash/Fire/ Rescue $13,500,000 Station.

Air Force.............................. North Dakota: Grand Forks Central Deployment Center $495,000 AFB.

Army NG................................ Ohio: Camp Sherman....... Maintenance Building Add/ $3,100,000 Alt.

Army NG................................ Ohio: Ravenna Training Unit Training Equipment $2,000,000 Site. Site Add/Alt.

Air NG................................. Ohio: Toledo Express Replace Security Forces $7,300,000 Airport. Complex.

Defense-Wide........................... Oklahoma: Tulsa IAP...... Fuels Storage Complex.... $1,036,000

Army NG................................ Oregon: Salem............ Armed Forces Reserve $1,243,000 Center Add/Alt (JFHQ).

Air NG................................. Pennsylvania: Fort Multipurpose Air National $675,000 Indiantown Gap. Guard Training Facility.

Army NG................................ Pennsylvania: Hermitage.. Readiness Center......... $671,000

Army NG................................ Pennsylvania: Tobyhanna.. Armed Forces Reserve $1,513,000 Center.

Army NG................................ Pennsylvania: Field Maintenance Shop... $1,508,000 Williamsport.

Army NG................................ Rhode Island: Middletown. Readiness Center Add/Alt. $3,646,000

Army NG................................ Rhode Island: Quonset Readiness Center......... $3,729,000 Point.

Air NG................................. South Carolina: McEntire Replace Operations and $9,100,000 JRB. Training Facility.

Air NG................................. South Dakota: Joe Foss Aircraft Maintenance $3,600,000 Field. Shops.

Air Force.............................. Tennessee: Arnold AFB.... AEDC Power Distribution $378,000 Modernization.

Army................................... Texas: Corpus Christi Rotor Blade Processing $13,400,000 Depot. Facility, Ph 2.

Army................................... Texas: Fort Bliss........ Alternative Energy $1,166,000 Projects.

Army................................... Texas: Fort Bliss........ Rail Yard Improvements... $2,070,000

Army................................... Texas: Fort Hood......... Soldier Readiness $1,000,000 Processing Center.

Navy................................... Texas: Kingsville NAS.... Youth Center............. $2,610,000

Air Force.............................. Texas: Lackland AFB...... Consolidated Security $900,000 Forces Ops Center, Ph 1.

Air Force.............................. Texas: Laughlin AFB...... Community Event Complex.. $10,500,000

Army NG................................ Texas: Laredo............ Receiving, Staging, & $475,000 Onward Integration Facility/Hangar.

Army NG................................ Texas: McLennan County... Operational Reserve $5,000,000 Headquarters.

Army NG................................ Texas: South Texas Cantonment and Support $5,000,000 Training Center. Infrastructure.

Army................................... Virginia: Fort Belvoir... Growth Support $3,060,000 Infrastructure.

Air Force.............................. Virginia: Langley AFB.... Clear Zone Land $3,000,000 Acquisition, Ph 1.

Defense-Wide........................... Washington: Fort Lewis... SOF Military Working Dog $4,700,000 Kennel.

Navy................................... Washington: Kitsap NB.... Charleston Gate ECP $6,150,000 Improvements.

Army NG................................ West Virginia: Bridgeport FWAATS Apron Expansion... $2,000,000

Army NG................................ West Virginia: Bridgeport FWAATS Expansion......... $2,000,000

Army NG................................ West Virginia: Glen Jean. Emergency Power Generator $1,500,000

Army NG................................ Wisconsin: Wausau........ Field Maintenance Shop... $12,008,000

Army NG................................ Guam: Barrigada.......... Joint Forces HQ Readiness $778,000 Center Add/Alt.

----------------------------------------------------------------------------------------------------------------

Legislative Activity

Stay on top of the latest movement without scrolling through every action

3 earlier actions
Floor Latest Action

House amendment offered

July 28, 2010

View full timeline
Floor

House amendment offered

July 28, 2010

Not Used

House amendment offered/reported by : Amendment (A006) offered by Mr. Flake.(consideration: CR H6238-6241; text: CR H6238-6239)

July 28, 2010 • 5:36 PM

Floor

Amendment (A006) offered by Mr. Flake. (consideration: CR H6238-6241; text: CR H6238-6239)

July 28, 2010 • 5:36 PM

Floor

By unanimous consent, the Flake amendment was withdrawn. (consideration: CR H6240)

July 28, 2010 • 5:48 PM