To require a report on the alignment, organizational reporting, and performance rating of Air Force system program managers, sustainment program managers, and product support managers at Air Logistics Centers or Air Logistics Complexes.
What it does: Rewrites section 324What it changes
1 change to S. 1867 · shown in the bill's text
Rewrites section 324
ReplacesIn S. 1867 · Placed on Calendar Senate
Inserted: SEC. 324. REPORTS ON DEPOT-RELATED ACTIVITIES.
[struck: SEC. 324. REPORT ON DEPOT-LEVEL MAINTENANCE AND RECAPITALIZATION OF CERTAIN PARTS AND EQUIPMENT][inserted: (a) Report on Depot-level Maintenance and Recapitalization of Certain Parts and Equipment].[inserted: --](
[struck: a][inserted: 1])[struck: Report Required][inserted: In general].--Not later than 90 days after the date of the enactment of this Act, the Director of the Defense Logistics Agency (DLA), in consultation with the military departments, shall submit to the congressional defense committees a report on the status of the DLA Joint Logistics Operations Center's Drawdown, Retrograde and Reset Program for the equipment from Iraq and Afghanistan and the status of the overall supply chain management for depot-level activities.(
[struck: b][inserted: 2]) Elements.--The report required under[struck: subsection][inserted: paragraph] ([struck: a][inserted: 1]) shall include the following elements:(
[struck: 1][inserted: A]) An assessment of the number of backlogged parts for critical warfighter needs, an explanation of why those parts became backlogged, and an estimate of when the backlog is likely to be fully addressed.(
[struck: 2][inserted: B]) A review of critical warfighter requirements that are being impacted by a lack of supplies and parts and an explanation of steps that the Director plans to take to meet the demand requirements of the military departments.(
[struck: 3][inserted: C]) An assessment of the feasibility and advisability of working with outside commercial partners to utilize flexible and efficient turn-key rapid production systems to meet rapidly emerging warfighter requirements.(
[struck: 4][inserted: D]) A review of plans to further consolidate the ordering and stocking of parts and supplies from the military departments at depots under the control of the Defense Logistics Agency.(
[struck: c][inserted: 3]) Flexible and[struck: Efficient Turn-key Rapid Production Systems Defined][inserted: efficient turn-key rapid production systems defined].--For the purposes of this[struck: section][inserted: subsection], flexible and efficient turn-key rapid production systems are systems that have demonstrated the capability to reduce the costs of parts, improve manufacturing efficiency, and have the following unique features:(
[struck: 1][inserted: A]) Virtual and flexible.--Systems that provide for flexibility to rapidly respond to requests for low-volume or high-volume machined parts and surge demand by accessing the full capacity of small- and medium-sized manufacturing communities in the United States.(
[struck: 2][inserted: B]) Speed to market.--Systems that provide for flexibility that allows rapid introduction of subassemblies for new parts and weapons systems to the warfighter.(
[struck: 3][inserted: C]) Risk management.--Systems that provide for the electronic archiving and updating of turn-key rapid production packages to provide insurance to the Department of Defense that parts will be available if there is a supply chain disruption.Inserted: (b) Report on Air Force Materiel Command Reorganization.--
Inserted: (1) Restriction on reorganization activities.--With respect to the planned reorganization of the Air Force Materiel Command announced on November 2, 2011, the Secretary of the Air Force shall make no changes related to organizational alignment, reporting officials, or any other change related to oversight or the duties of system program managers, sustainment program managers, or product support managers who reside at installations where Air Logistics Centers or depots are located until 60 days after the report required under paragraph (2) is submitted to the congressional defense committees.
Inserted: (2) Report.--
Inserted: (A) In general.--The Secretary of the Air Force shall submit to the congressional defense committees a report containing an analysis of alternatives for alignment and reporting of Air Force System Program Managers and Product Support Managers.
Inserted: (B) Elements.--The report required under subparagraph (A) shall--
Inserted: (i) focus on the impacts to Air Force life cycle management, sustainment, readiness, and overall support to the warfighter that would likely be realized through the various alternatives;
Inserted: (ii) address legal, financial, and other relevant issues;
Inserted: (iii) identify criteria for evaluating alternatives;
Inserted: (iv) include a list of alternatives, including analysis and recommendations relating to the alternatives;
Inserted: (v) describe cost and savings factors; and
Inserted: (vi) focus on how the Air Force should be best organized to conduct life cycle management and sustainment, with overall readiness being the highest priority.
Original wording
Strike section 324 and insert the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
Strike section 324 and insert the following:
SEC. 324. REPORTS ON DEPOT-RELATED ACTIVITIES.
(a) Report on Depot-level Maintenance and Recapitalization of Certain Parts and Equipment.--
(1) In general.--Not later than 90 days after the date of the enactment of this Act, the Director of the Defense Logistics Agency (DLA), in consultation with the military departments, shall submit to the congressional defense committees a report on the status of the DLA Joint Logistics Operations Center's Drawdown, Retrograde and Reset Program for the equipment from Iraq and Afghanistan and the status of the overall supply chain management for depot-level activities.
(2) Elements.--The report required under paragraph (1) shall include the following elements:
(A) An assessment of the number of backlogged parts for critical warfighter needs, an explanation of why those parts became backlogged, and an estimate of when the backlog is likely to be fully addressed.
(B) A review of critical warfighter requirements that are being impacted by a lack of supplies and parts and an explanation of steps that the Director plans to take to meet the demand requirements of the military departments.
(C) An assessment of the feasibility and advisability of working with outside commercial partners to utilize flexible and efficient turn-key rapid production systems to meet rapidly emerging warfighter requirements.
(D) A review of plans to further consolidate the ordering and stocking of parts and supplies from the military departments at depots under the control of the Defense Logistics Agency.
(3) Flexible and efficient turn-key rapid production systems defined.--For the purposes of this subsection, flexible and efficient turn-key rapid production systems are systems that have demonstrated the capability to reduce the costs of parts, improve manufacturing efficiency, and have the following unique features:
(A) Virtual and flexible.--Systems that provide for flexibility to rapidly respond to requests for low-volume or high-volume machined parts and surge demand by accessing the full capacity of small- and medium-sized manufacturing communities in the United States.
(B) Speed to market.--Systems that provide for flexibility that allows rapid introduction of subassemblies for new parts and weapons systems to the warfighter.
(C) Risk management.--Systems that provide for the electronic archiving and updating of turn-key rapid production packages to provide insurance to the Department of Defense that parts will be available if there is a supply chain disruption.
(b) Report on Air Force Materiel Command Reorganization.--
(1) Restriction on reorganization activities.--With respect to the planned reorganization of the Air Force Materiel Command announced on November 2, 2011, the Secretary of the Air Force shall make no changes related to organizational alignment, reporting officials, or any other change related to oversight or the duties of system program managers, sustainment program managers, or product support managers who reside at installations where Air Logistics Centers or depots are located until 60 days after the report required under paragraph (2) is submitted to the congressional defense committees.
(2) Report.--
(A) In general.--The Secretary of the Air Force shall submit to the congressional defense committees a report containing an analysis of alternatives for alignment and reporting of Air Force System Program Managers and Product Support Managers.
(B) Elements.--The report required under subparagraph (A) shall--
(i) focus on the impacts to Air Force life cycle management, sustainment, readiness, and overall support to the warfighter that would likely be realized through the various alternatives;
(ii) address legal, financial, and other relevant issues;
(iii) identify criteria for evaluating alternatives;
(iv) include a list of alternatives, including analysis and recommendations relating to the alternatives;
(v) describe cost and savings factors; and
(vi) focus on how the Air Force should be best organized to conduct life cycle management and sustainment, with overall readiness being the highest priority.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment agreed to: Amendment SA 1304 as modified agreed to in Senate by Unanimous Consent.(text as modified: CR S8117)
December 1, 2011
View full timeline
Senate amendment agreed to: Amendment SA 1304 as modified agreed to in Senate by Unanimous Consent.(text as modified: CR S8117)
December 1, 2011
Considered by Senate. (consideration: CR S8095, S8116-8117)
December 1, 2011
Amendment SA 1304 as modified agreed to in Senate by Unanimous Consent. (text as modified: CR S8117)
December 1, 2011
Considered by Senate. (consideration: CR S8014)
November 30, 2011
Considered by Senate. (consideration: CR S7944)
November 29, 2011
Considered by Senate. (consideration: CR S7886)
November 28, 2011
Senate amendment submitted
November 18, 2011
Senate amendment proposed (on the floor): Amendment SA 1304 proposed by Senator Chambliss.(consideration: CR S7814-7817; text: CR S7814)
November 18, 2011
Amendment SA 1304 proposed by Senator Chambliss. (consideration: CR S7814-7817; text: CR S7814) To require a report on the alignment, organizational reporting, and performance rating of Air Force system program managers, sustainment program managers, and product support managers at Air Logistics Centers or Air Logistics Complexes.
November 18, 2011