S.Amdt. 1469Senate112th Congress (2011-2013)

In the nature of a substitute.

What it does: Replaces the bill's text with a full substitute
Submitted January 26, 2012

What it changes

1 change to S. 2039

Full substitute
  1. Replaces the bill's text with a full substitute

    Replaces the full textEverything after the enacting clause

    Removes all after the enacting clause.

    Inserted: SECTION 1. LEVEES.

    Inserted: (a) Definitions.--In this section--

    Inserted: (1) the term "Administrator" means the Administrator of the Federal Emergency Management Agency; and

    Inserted: (2) the term "covered hazard mitigation land" means land--

    Inserted: (A) acquired and deed restricted under section 404(b) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170c(b)) before, on, or after the date of enactment of this Act; and

    Inserted: (B) that is located--

    Inserted: (i) in North Dakota; and

    Inserted: (ii) in a community that--

    Inserted: (I) is participating in the National Flood Insurance Program on the date on which a State, local, or tribal government submits an application requesting to construct a permanent flood risk reduction levee under subsection (b); and

    Inserted: (II) certifies to the Administrator and the Chief of Engineers that the community will continue to participate in the National Flood Insurance Program.

    Inserted: (b) Authority.--Notwithstanding clause (i) or (ii) of section 404(b)(2)(B) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170c(b)(2)(B)), the Administrator shall approve the construction of a permanent flood risk reduction levee by a State, local, or tribal government on covered hazard mitigation land if the Administrator and the Chief of Engineers determine, through a process established by the Administrator and Chief of Engineers and funded entirely by the State, local, or tribal government seeking to construct the proposed levee, that--

    Inserted: (1) construction of the proposed permanent flood risk reduction levee would more effectively mitigate against flooding risk than an open floodplain or other flood risk reduction measures;

    Show 10 more inserted paragraphs

    Inserted: (2) the proposed permanent flood risk reduction levee complies with Federal, State, and local requirements, including mitigation of adverse impacts and implementation of floodplain management requirements, which shall include an evaluation of whether the construction, operation, and maintenance of the proposed levee would continue to meet best available industry standards and practices, would be the most cost-effective measure to protect against the assessed flood risk and minimizes future costs to the federal government;

    Inserted: (3) the State, local, or tribal government seeking to construct the proposed levee has provided an adequate maintenance plan that documents the procedures the State, local, or tribal government will use to ensure that the stability, height, and overall integrity of the proposed levee and the structure and systems of the proposed levee are maintained, including--

    Inserted: (A) specifying the maintenance activities to be performed;

    Inserted: (B) specifying the frequency with which maintenance activities will be performed;

    Inserted: (C) specifying the person responsible for performing each maintenance activity (by name or title);

    Inserted: (D) detailing the plan for financing the maintenance of the levee; and

    Inserted: (E) documenting the ability of the State, local, or tribal government to finance the maintenance of the levee.

    Inserted: (c) Maintenance Certification.--

    Inserted: (1) In general.--A State, local, or tribal government that constructs a permanent flood risk reduction levee under subsection (b) shall submit to the Administrator and the Chief of Engineers an annual certification indicating whether the State, local, or tribal government is in compliance with the maintenance plan provided under subsection (b)(3).

    Inserted: (2) Review.--The Chief of Engineers shall review a certification submitted under paragraph (1) and determine whether the State, local, or tribal government has complied with the maintenance plan.

    Original wording

    Strike all after the enacting clause and insert the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 1469. Mr. REID (for Mrs. Boxer) proposed an amendment to the bill S. 2039, to allow a State or local government to construct levees on certain properties otherwise designated as open space lands; as follows:

Strike all after the enacting clause and insert the following:

SECTION 1. LEVEES.

(a) Definitions.--In this section--

(1) the term “Administrator” means the Administrator of the Federal Emergency Management Agency; and

(2) the term “covered hazard mitigation land” means land--

(A) acquired and deed restricted under section 404(b) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170c(b)) before, on, or after the date of enactment of this Act; and

(B) that is located--

(i) in North Dakota; and

(ii) in a community that--

(I) is participating in the National Flood Insurance Program on the date on which a State, local, or tribal government submits an application requesting to construct a permanent flood risk reduction levee under subsection (b); and

(II) certifies to the Administrator and the Chief of Engineers that the community will continue to participate in the National Flood Insurance Program.

(b) Authority.--Notwithstanding clause (i) or (ii) of section 404(b)(2)(B) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170c(b)(2)(B)), the Administrator shall approve the construction of a permanent flood risk reduction levee by a State, local, or tribal government on covered hazard mitigation land if the Administrator and the Chief of Engineers determine, through a process established by the Administrator and Chief of Engineers and funded entirely by the State, local, or tribal government seeking to construct the proposed levee, that--

(1) construction of the proposed permanent flood risk reduction levee would more effectively mitigate against flooding risk than an open floodplain or other flood risk reduction measures;

(2) the proposed permanent flood risk reduction levee complies with Federal, State, and local requirements, including mitigation of adverse impacts and implementation of floodplain management requirements, which shall include an evaluation of whether the construction, operation, and maintenance of the proposed levee would continue to meet best available industry standards and practices, would be the most cost-effective measure to protect against the assessed flood risk and minimizes future costs to the federal government;

(3) the State, local, or tribal government seeking to construct the proposed levee has provided an adequate maintenance plan that documents the procedures the State, local, or tribal government will use to ensure that the stability, height, and overall integrity of the proposed levee and the structure and systems of the proposed levee are maintained, including--

(A) specifying the maintenance activities to be performed;

(B) specifying the frequency with which maintenance activities will be performed;

(C) specifying the person responsible for performing each maintenance activity (by name or title);

(D) detailing the plan for financing the maintenance of the levee; and

(E) documenting the ability of the State, local, or tribal government to finance the maintenance of the levee.

(c) Maintenance Certification.--

(1) In general.--A State, local, or tribal government that constructs a permanent flood risk reduction levee under subsection (b) shall submit to the Administrator and the Chief of Engineers an annual certification indicating whether the State, local, or tribal government is in compliance with the maintenance plan provided under subsection (b)(3).

(2) Review.--The Chief of Engineers shall review a certification submitted under paragraph (1) and determine whether the State, local, or tribal government has complied with the maintenance plan.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

4 earlier actions
Floor Latest Action

Senate amendment agreed to: Amendment SA 1469 agreed to in Senate by Unanimous Consent.

January 26, 2012

View full timeline
Floor

Senate amendment agreed to: Amendment SA 1469 agreed to in Senate by Unanimous Consent.

January 26, 2012

Floor

Senate amendment proposed (on the floor): Amendment SA 1469 proposed by Senator Reid for Senator Boxer.(consideration: CR S136-137; text: CR S136-137)

January 26, 2012

Floor

Senate amendment submitted

January 26, 2012

Floor

Amendment SA 1469 proposed by Senator Reid for Senator Boxer. (consideration: CR S136-137; text: CR S136-137) In the nature of a substitute.

January 26, 2012

Floor

Amendment SA 1469 agreed to in Senate by Unanimous Consent.

January 26, 2012