S.Amdt. 1954Senate114th Congress (2015-2017)2nd degree
S.Amdt. 1954
Sponsored by
Sen. Patty Murray (D-WA)
Submitted June 9, 2015
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
June 9, 2015
View full timeline
Floor
Senate amendment submitted
June 9, 2015
Floor
Senate amendment submitted
June 9, 2015
Text
Submitted
SA 1954. Mrs. MURRAY submitted an amendment intended to be proposed to amendment SA 1463 proposed by Mr. McCain to the bill H.R. 1735, to authorize appropriations for fiscal year 2016 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: Strike section 3115 and insert the following: SEC. 3115. HANFORD WASTE TREATMENT AND IMMOBILIZATION PLANT CONTRACT OVERSIGHT. (a) In General.--Subtitle C of title XLIV of the Atomic Energy Defense Act (50 U.S.C. 2621 et seq.) is amended by adding at the end the following new section: ``SEC. 4446. HANFORD WASTE TREATMENT AND IMMOBILIZATION PLANT CONTRACT OVERSIGHT. ``(a) In General.--Not later than 180 days after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2016, the Secretary of Energy shall arrange to have an owner's representative assist in carrying out the oversight responsibilities of the Department of Energy with respect to the contract described in subsection (b). The owner's representative shall report to the Office of River Protection of the Department of Energy. ``(b) Contract Described.--The contract described in this subsection is the contract between the Office of River Protection of the Department of Energy and Bechtel National, Inc. or its successor relating to the Hanford Waste Treatment and Immobilization Plant (contract number DE-AC27-01RV14136). ``(c) Duties.--The duties of the owner's representative under subsection (a) may include the following: ``(1) Assisting the Department of Energy with performing design, construction, commissioning, nuclear safety, and operability oversight of each facility covered by the contract described in subsection (b). ``(2) Beginning not later than one year after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2016, assisting the Department of Energy to ensure that the preliminary documented safety analyses for the Low-Activity Waste Vitrification Facility, the Balance of Facilities, and the Analytical Laboratory covered by the contract described in subsection (b) meet the requirements of all applicable regulations and orders of the Department of Energy as required by the contract. ``(d) Report Required.-- ``(1) In general.--Not later than one year after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2016, and annually thereafter, the Secretary of Energy shall submit to the congressional defense committees a report on the assistance provided by the owner's representative to the Department of Energy under subsection (a) with respect to the contract described in subsection (b). ``(2) Elements.--The report required by paragraph (1) shall include the following: ``(A) An identification of any instance of the contractor not meeting the requirements of the applicable regulations or orders of the Department of Energy as required by the contract described in subsection (b) and the plan for and status of correcting any such instance. ``(B) Information on the status of and the plan for resolving significant unresolved technical issues at the Low- Activity Waste Vitrification Facility, the Balance of Facilities, and the Analytical Laboratory. ``(e) Definitions.--In this section: ``(1) The term `contractor' means Bechtel National, Inc. or its successor. ``(2) The terms `preliminary documented safety analysis' has the meaning given that term in section 830.3 of title 10, Code of Federal Regulations (or any corresponding similar ruling or regulation). ``(3) The term `owner's representative' means a third-party entity with expertise in nuclear design, construction, commissioning, and safety management and without any contractual relationship with the contractor.''. (b) Clerical Amendment.--The table of contents for the Atomic Energy Defense Act is amended by inserting after the item relating to section 4445 the following new item: ``Sec. 4446. Hanford Waste Treatment and Immobilization Plant contract oversight.''. ______