S.Amdt. 3111Senate114th Congress (2015-2017)2nd degree
S.Amdt. 3111
Sponsored by
Sen. Al Franken (D-MN)
Submitted January 28, 2016
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
January 28, 2016
View full timeline
Floor
Senate amendment submitted
January 28, 2016
Floor
Senate amendment submitted
January 28, 2016
Text
Submitted
SA 3111. Mr. FRANKEN submitted an amendment intended to be proposed to amendment SA 2953 proposed by Ms. Murkowski to the bill S. 2012, to provide for the modernization of the energy policy of the United States, and for other purposes; which was ordered to lie on the table; as follows: In section 2301, strike subsection (c) and insert the following: (c) Technical Assistance and Grant Program.-- (1) Establishment.-- (A) In general.--The Secretary, in consultation with the Assistant Secretary for Electricity Delivery and Energy Reliability, shall establish a technical assistance and grant program (referred to in this subsection as the ``program'')-- (i) to disseminate information and provide technical assistance directly to eligible entities so the eligible entities can identify, evaluate, plan, and design energy storage systems; and (ii) to make grants to eligible entities so that the eligible entities may contract to obtain technical assistance to identify, evaluate, plan, and design energy storage systems. (B) Technical assistance.--The technical assistance described in subparagraph (A) shall include assistance with 1 or more of the following activities relating to energy storage systems: (i) Identification of opportunities to use energy storage systems. (ii) Assessment of technical and economic characteristics. (iii) Utility interconnection. (iv) Permitting and siting issues. (v) Business planning and financial analysis. (vi) Engineering design. (C) Information dissemination.--The information disseminated under subparagraph (A)(i) shall include-- (i) information relating to the topics described in subparagraph (B), including case studies of successful examples; (ii) computer software for assessment, design, and operation and maintenance of energy storage systems; and (iii) public databases that track the operation and deployment of existing and planned energy storage systems. (2) Eligibility.--Any nonprofit or for-profit entity shall be eligible to receive technical assistance and grants under the program. (3) Applications.-- (A) In general.--An eligible entity desiring technical assistance or grants under the program shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require. (B) Application process.--The Secretary shall seek applications for technical assistance and grants under the program-- (i) on a competitive basis; and (ii) on a periodic basis, but not less frequently than once every 12 months. (C) Priorities.--In selecting eligible entities for technical assistance and grants under the program, the Secretary shall give priority to eligible entities with projects that have the greatest potential for-- (i) facilitating the use of renewable energy resources; (ii) strengthening the reliability and resiliency of energy infrastructure to the impact of extreme weather events, power grid failures, and interruptions in supply of fossil fuels; (iii) improving the feasibility of microgrids or islanding, particularly in rural areas, including high energy cost rural areas; (iv) minimizing environmental impact, including regulated air pollutants and greenhouse gas emissions; and (v) maximizing local job creation. (4) Grants.--On application by an eligible entity, the Secretary may award grants to the eligible entity to provide funds to cover not more than-- (A) 100 percent of the costs of the initial assessment to identify energy storage system opportunities; (B) 75 percent of the cost of feasibility studies to assess the potential for the implementation of energy storage systems; (C) 60 percent of the cost of guidance on overcoming barriers to the implementation of energy storage systems, including financial, contracting, siting, and permitting issues; and (D) 45 percent of the cost of detailed engineering of energy storage systems. (5) Rules and procedures.-- (A) Rules.--Not later than 180 days after the date of enactment of this Act, the Secretary shall adopt rules and procedures for carrying out the program. (B) Grants.--Not later than 120 days after the date of issuance of the rules and procedures for the program, the Secretary shall issue grants under this subsection. (6) Reports.--The Secretary shall submit to Congress and make available to the public-- (A) not less frequently than once every 2 years, a report describing the performance of the program under this subsection; and (B) on termination of the program under this subsection, an assessment of the success of, and education provided by, the measures carried out by eligible entities under the program. ______