S.Amdt. 3184Senate114th Congress (2015-2017)2nd degree
S.Amdt. 3184
Sponsored by
Sen. Patrick J. Toomey (R-PA)
Submitted February 2, 2016
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
February 2, 2016
View full timeline
Floor
Senate amendment submitted
February 2, 2016
Floor
Senate amendment submitted
February 2, 2016
Text
Submitted
SA 3184. Mr. TOOMEY (for himself and Mr. Casey) submitted an amendment intended to be proposed to amendment SA 2953 proposed by Ms. Murkowski to the bill S. 2012, to provide for the modernization of the energy policy of the United States, and for other purposes; which was ordered to lie on the table; as follows: At the end, add the following: TITLE __--COAL REFUSE POWER PLANTS SEC. _01. SHORT TITLE. This title may be cited as the ``Satisfying Energy Needs and Saving the Environment Act'' or the ``SENSE Act''. SEC. _02. STANDARDS FOR COAL REFUSE POWER PLANTS. (a) Definitions.--In this title: (1) Administrator.--The term ``Administrator'' means the Administrator of the Environmental Protection Agency. (2) Boiler operating day.--The term ``boiler operating day'' has the meaning given the term in section 63.10042 of title 40, Code of Federal Regulations (or a successor regulation). (3) Coal refuse.--The term ``coal refuse'' means any byproduct of coal mining, physical coal cleaning, or coal preparation operation that contains coal, matrix material, clay, and other organic and inorganic material. (4) Coal refuse electric utility steam generating unit.-- The term ``coal refuse electric utility steam generating unit'' means an electric utility steam generating unit that-- (A) is in operation as of the date of enactment of this Act; (B) uses fluidized bed combustion technology to convert coal refuse into energy; and (C) uses coal refuse as at least 75 percent of the annual fuel consumed, by heat input, of the unit. (5) Coal refuse-fired facility.--The term ``coal refuse- fired facility'' means a facility in which the coal refuse electric utility steam generating units are-- (A) located on 1 or more contiguous or adjacent properties; (B) specified in the same Major Group (2-digit code), as described in the Standard Industrial Classification Manual (1987); and (C) under common control of the same person (or persons under common control). (6) Cross-state air pollution rule.--The terms ``Cross- State Air Pollution Rule'' and ``CSAPR'' mean the regulatory program promulgated by the Administrator to address the interstate transport of air pollution in parts 51, 52, and 97 of title 40, Code of Federal Regulations (or successor regulations). (7) Electric utility steam generating unit.--The term ``electric utility steam generating unit'' means-- (A) an electric utility steam generating unit, as the term is defined in section 63.10042 of title 40, Code of Federal Regulations (or a successor regulation); or (B) an electricity generating unit or electric generating unit, as the terms are used in CSAPR. (8) Phase i.--The term ``Phase I'' means, with respect to CSAPR, the initial compliance period under CSAPR, identified for the 2015 and 2016 annual compliance periods. (b) Application of CSAPR to Certain Coal Refuse Electric Utility Steam Generating Units.-- (1) Coal refuse electric utility steam generating units combusting bituminous coal refuse.-- (A) Applicability.--This paragraph applies to any coal refuse electric utility steam generating unit that-- (i) combusts coal refuse derived from the mining and processing of bituminous coal; and (ii) is subject to sulfur dioxide allowance surrender provisions pursuant to CSAPR. (B) Continued applicability of phase i allowance allocations.--In carrying out CSAPR, the Administrator shall provide that, for any compliance period, the allocation (whether through a Federal implementation plan or State implementation plan) of sulfur dioxide allowances for a coal refuse electric utility steam generating unit described in subparagraph (A) is equivalent to the allocation of the unit- specific sulfur dioxide allowance allocation identified for that unit for Phase I, as referenced in the notice entitled ``Availability of Data on Allocations of Cross-State Air Pollution Rule Allowances to Existing Electricity Generating Units'' (79 Fed. Reg. 71674 (December 3, 2014)). (C) Rules for allowance allocations.--For any compliance period under CSAPR that commences on or after January 1, 2017, any sulfur dioxide allowance allocation provided by the Administrator to a coal refuse electric utility steam generating unit described in subparagraph (A)-- (i) shall not be transferable for use by any other source not located at the same coal refuse-fired facility as the relevant coal refuse electric utility steam generating unit; (ii) may be transferable for use by another source located at the same coal refuse-fired facility as the relevant coal refuse electric utility steam generating unit; (iii) may be banked for application to compliance obligations in future compliance periods under CSAPR; and (iv) shall be surrendered on the date on which the operation of the coal refuse electric utility steam generating unit permanently ceases. (2) Other sources.-- (A) No increase in overall state budget of sulfur dioxide allowance allocations.--For purposes of paragraph (1), the Administrator may not, for any compliance period under CSAPR, increase the total budget of sulfur dioxide allowance allocations for a State in which a unit described in paragraph (1)(A) is located. (B) Compliance periods 2017 through 2020.--For any compliance period under CSAPR that commences on or after January 1, 2017, but before December 31, 2020, the Administrator shall carry out subparagraph (A) by proportionally reducing, as necessary, the unit-specific sulfur dioxide allowance allocations from each source that-- (i) is located in a State in which a unit described in paragraph (1)(A) is located; (ii) permanently ceases operation, or converts the primary fuel source from coal to natural gas, before the relevant compliance period; and (iii) otherwise receives an allocation of sulfur dioxide allowances under CSAPR for the relevant compliance period. (c) Emission Limitations to Address Hydrogen Chloride and Sulfur Dioxide as Hazardous Air Pollutants.-- (1) Applicability.--For purposes of regulating emissions of hydrogen chloride or sulfur dioxide from a coal refuse electric utility steam generating unit under section 112 of the Clean Air Act (42 U.S.C. 7412), the Administrator-- (A) shall authorize the operator of the coal refuse electric utility steam generating unit to elect that the coal refuse electric utility steam generating unit comply with either-- (i) an emissions standard for emissions of hydrogen chloride that meets the requirements of paragraph (2); or (ii) an emission standard for emissions of sulfur dioxide that meets the requirements of paragraph (2); and (B) may not require that the coal refuse electric utility steam generating unit comply with both an emission standard for emissions of hydrogen chloride and an emission standard for emissions of sulfur dioxide. (2) Rules for emission limitations.-- (A) In general.--The Administrator shall require an operator of a coal refuse electric utility steam generating unit to comply, at the election of the operator, with not more than 1 of the following emission standards: (i) An emission standard for emissions of hydrogen chloride from a coal refuse electric utility steam generating unit that is not more stringent than an emission rate of 0.002 pounds per million British thermal units of heat input. (ii) An emission standard for emissions of hydrogen chloride from a coal refuse electric [[Page S492]] utility steam generating unit that is not more stringent than an emission rate of 0.02 pounds per megawatt-hour. (iii) An emission standard for emissions of sulfur dioxide from a coal refuse electric utility steam generating unit that is not more stringent than an emission rate of 0.20 pounds per million British thermal units of heat input. (iv) An emission standard for emissions of sulfur dioxide from a coal refuse electric utility steam generating unit that is not more stringent than an emission rate of 1.5 pounds per megawatt-hour. (v) An emission standard for emissions of sulfur dioxide from a coal refuse electric utility steam generating unit that is not more stringent than capture and control of 93 percent of sulfur dioxide across the coal refuse electric utility steam generating unit or group of coal refuse electric utility steam generating units, as determined by comparing-- (I) the expected sulfur dioxide generated from combustion of fuels emissions calculated based on as-fired fuel samples; to (II) the actual sulfur dioxide emissions as measured by a sulfur dioxide continuous emission monitoring system. (B) Measurement.--An emission standard described in subparagraph (A) shall be measured as a 30-boiler operating day rolling average per coal refuse electric utility steam generating unit or group of coal refuse electric utility steam generating units located at a single coal refuse-fired facility. ______