S.Amdt. 4153Senate114th Congress (2015-2017)
S.Amdt. 4153
Sponsored by
Sen. Mark Kirk (R-IL)
Submitted May 25, 2016
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
May 25, 2016
View full timeline
Floor
Senate amendment submitted
May 25, 2016
Floor
Senate amendment submitted
May 25, 2016
Text
Submitted
SA 4153. Mr. KIRK (for himself, Mr. Durbin, Mr. Grassley, and Mrs. Ernst) submitted an amendment intended to be proposed by him to the [[Page S3198]] bill S. 2943, to authorize appropriations for fiscal year 2017 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the end of subtitle H of title VIII, add the following: SEC. 899C. ARMY ARSENAL REVITALIZATION. (a) Definitions.--In this section: (1) Legacy items.--The term ``legacy items'' means manufactured items that are no longer produced by the private sector but continue to be used for Department of Defense weapons systems, excluding information technology and information systems (as those terms are defined in section 11101 of title 40, United States Code). (2) Organic industrial base.--The term ``organic industrial base'' means United States military facilities that advance a vital national security interest by producing necessary materials, munitions, and hardware, including arsenals and depots. (b) Use of Arsenals to Manufacture Certain Items.-- (1) Report.--Not later than 180 days after the date of the enactment of this Act, the Director of the Defense Logistics Agency shall submit to the congressional defense committees a report listing all legacy items used by the Department of Defense with a contract value equal to or greater than $5,000,000. (2) Legacy item production requirement.--The Secretary of Defense shall use Army arsenals for the production of all legacy items identified in the report submitted under paragraph (1). (c) Use of Organic Industrial Base to Address Diminishing Manufacturing Sources and Material Shortages.-- (1) Report.--Not later than one year after the date of the enactment of this Act, the Secretary of Defense shall submit to the congressional defense committees a report detailing plans to update and improve its guidance and practices on Diminishing Manufacturing Sources and Material Shortages (DMSMS), including through the use of the organic industrial base as a resource in the implementation of a DMSMS management plan. (2) Guidance regarding use of organic industrial base.--The Secretary of the Army shall maintain the arsenals with sufficient workloads to ensure affordability and technical competence in all critical capability areas by establishing, not later than March 30, 2017, clear, step-by-step, prescriptive guidance on the process for conducting make-or- buy analyses, including the use of the organic industrial base. (3) Identification of army arsenal critical capabilities and minimum workloads.-- (A) Report.--Not later than 180 days after the date of the enactment of this Act, the Secretary of Defense shall submit to the congressional defense committees a report that-- (i) includes a standardized, consistent method to use for identifying the critical capabilities and minimum workloads of the Army arsenals; (ii) provides analysis on the critical capabilities and minimum workloads for each of the manufacturing arsenals; and (iii) identifies fundamental elements, such as steps, milestones, timeframes, and resources for implementing the United States Army Organic Industrial Base Strategic Plan 2012-2022. (B) Guidance.--Not later than one year after the date of the enactment of this Act, the Secretary of Defense shall issue guidance to implement the process for identifying the critical capabilities of the Army's manufacturing arsenals and the method for determining the minimum workload needed to sustain these capabilities. (d) Authority to Adjust Labor Rates to Reflect Work Production.-- (1) Pilot program.--Not later than 90 days after the date of the enactment of this Act, the Secretary of Defense shall establish a three-year pilot program for the purpose of permitting Army arsenals to adjust their labor rates periodically throughout the year based upon changes in workload and other factors. (2) Annual report.--Not later than one year after the date of the enactment of this Act, and annually thereafter, the Secretary of Defense shall submit to the congressional defense committees a report that assesses-- (A) each Army arsenal's changes in labor rates throughout the previous year; (B) the ability of each arsenal to meet the costs of their working capital funds; and (C) the effect on arsenal workloads of labor rate changes. ______