S.Amdt. 4265Senate114th Congress (2015-2017)
S.Amdt. 4265
Sponsored by
Sen. Thad Cochran (R-MS)
Submitted May 26, 2016
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
May 26, 2016
View full timeline
Floor
Senate amendment submitted
May 26, 2016
Floor
Senate amendment submitted
May 26, 2016
Text
Submitted
SA 4265. Mr. COCHRAN submitted an amendment intended to be proposed by him to the bill S. 2943, to authorize appropriations for fiscal year 2017 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: Beginning on page 45, strike line 20 and all that follows through page 47, line 22, and insert the following: SEC. 126. REPORTING ON USS JOHN F. KENNEDY (CV-79) AND USS ENTERPRISE (CVN-80). (a) Report on CVN-79 and CVN-80.--Not later than December 1, 2016, the Secretary of the Navy and the Chief of Naval Operations shall submit to the congressional defense committees a report on alternatives, including de-scoping requirements if necessary, to achieve a CVN-80 procurement end cost of $12,000,000,000. In addition, the report shall describe all applicable CVN-80 alternatives that could be applied to CVN-79 to enable an $11,000,000,000 procurement end cost. (b) Annual Report on CVN-79 and CVN-80.-- (1) In general.--The Secretary of the Navy and the Chief of Naval Operations shall annually submit, with the budget of the President submitted to Congress under section 1105(a) of title 31, United States Code, a progress report describing efforts to attain the CVN-79 and CVN-80 procurement end costs specified in subsection (a). (2) Elements.--The report under paragraph (1) shall include the following elements: (A) A description of progress made toward achieving the procurement end costs specified in subsection (a), including realized cost savings. (B) A description of specific low value-added or unnecessary elements of program cost that have been reduced or eliminated. (C) Cost savings estimates for current and planned initiatives. (D) A schedule including a spend plan with phasing of key obligations and outlays, decision points when savings could be realized, and key events that must take place to execute initiatives and achieve savings. (E) Instances of lower estimates used in contract negotiations. (F) A description of risks to achieving the procurement end costs specified in subsection (a). (G) A description of incentives or rewards provided or planned to be provided for meeting the procurement end costs specified in subsection (a). ______