S.Amdt. 5029Senate114th Congress (2015-2017)2nd degree
S.Amdt. 5029
Sponsored by
Sen. David Vitter (R-LA)
Submitted September 12, 2016
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
September 12, 2016
View full timeline
Floor
Senate amendment submitted
September 12, 2016
Floor
Senate amendment submitted
September 12, 2016
Text
Submitted
SA 5029. Mr. VITTER submitted an amendment intended to be proposed to amendment SA 4979 proposed by Mr. McConnell (for Mr. Inhofe (for himself and Mrs. Boxer)) to the bill S. 2848, to provide for the conservation and development of water and related resources, to authorize the Secretary of the Army to construct various projects for improvements to rivers and harbors of the United States, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place, insert the following: SEC. ___. PRELIMINARY CONCEPT DESIGN PROCESS. (a) Preliminary Concept Design Document.--After receipt of a preliminary permit, a non-Federal entity seeking to develop hydroelectric power at a civil works project of the Corps of Engineers may submit to the Corps of Engineers a preliminary concept design that is consistent with the license application process of the Federal Energy Regulatory Commission. (b) Integrated Review.--The heads of the district, division, and headquarters levels of the Corps of Engineers shall conduct an integrated review of any preliminary concept design submitted under subsection (a). (c) Preliminary Finding.--Not later than 60 days after a non-Federal entity submits a preliminary concept design under subsection (a), the Corps of Engineers shall-- (1) complete the review under subsection (b); and (2) provide the non-Federal entity with-- (A) preliminary findings that include an analysis and comments on the concept design, as the concept design relates to approval for use in the Corps of Engineers licensing process and the ultimate development of the project; (B)(i) preliminary approval, denial, or request for additional information of the concept design; and (ii) a description of any measures necessary for the Corps of Engineers to permit the project, including engineering designs and measures necessary for permits under section 14 of the Act of March 3, 1899 (commonly known as the ``Rivers and Harbors Appropriations Act of 1899'') (33 U.S.C. 408); and (C) the assignment of a project delivery coordinator or a Federal Energy Regulatory Commission coordinator, designated by the Chief of Engineers, who shall-- (i) coordinate the project within the Corps of Engineers; and (ii) be given direct oversight over selection to the project delivery team members who have appropriate expertise during the licensing process. (d) Permit Review.--If a non-Federal entity has submitted to the Corps of Engineers a design concept under subsection (a), the applications from that non-Federal entity for permits under section 14 of the Act of March 3, 1899 (commonly known as the ``Rivers and Harbors Appropriations Act of 1899'') (33 U.S.C. 408) to develop hydroelectric power at the civil works project of the Corps of Engineers identified by the non-Federal entity shall be considered by the project delivery coordinator or Federal Energy Regulatory Commission coordinator designated under subsection (c)(2)(C). (e) Non-federal Hydroelectric Power Development Ombudsman.-- (1) Designation.--The Chief of Engineers shall designate from within the Corps of Engineers an ombudsman, to be known as the ``Ombudsman for Non-Federal Hydroelectric Power Development'' (referred to in this section as the ``Ombudsman''). (2) Requirements.--The Ombudsman-- (A) shall not be otherwise involved in the review of any Corps of Engineers permit to develop hydroelectric power at any civil works project of the Corps of Engineers; (B) shall be located at the headquarters of the Corps of Engineers; and (C) shall be an employee serving with the minimum rank of Colonel. (3) Responsibilities.--With respect to the development of non-Federal hydroelectric power at any civil works project of the Corps of Engineers, the Ombudsman shall, on request made in writing by the non-Federal entity or the project delivery coordinator or Federal Energy Regulatory Commission coordinator designated under subsection (c)(2)(C)-- (A) within 60 days of the request, resolve, with respect to Corps of Engineers permits, disputes-- (i) within the Corps of Engineers; or (ii) between the non-Federal entity and the Corps of Engineers; and (B) ensure that the development standards and procedures are consistent in all districts of the Corps of Engineers. ______